Aluminium sunhouse, 65 series thermal break frame with 6+16Ar+6 Low-E insulated glass and laminated roof glazing.
A sunhouse is a glazed garden room bolted to an existing wall, and the failure modes are always the same three: an undersized roof purlin that deflects under snow, a roof glazing build-up cold enough to condense, and a base that is out of level by more than 3 mm. This page works through the numbers for each of them — member sizing, glazing selection, drainage, FOB pricing, container loading — for aluminium sunhouse kits built in Foshan and shipped as factory-cut packages.
Three roof geometries cover roughly 90% of orders: lean-to (single pitch against an existing wall), gable (ridged, free-standing or semi-detached), and hip / Victorian conservatory (multi-facet, usually 3 or 5 facets). The geometry pick is not aesthetic — it sets the roof span, and the roof span sets the purlin section, which is where most budget quotes quietly cut cost.
Lean-to, gable and hip: what each one does to the span
A lean-to sunhouse carries the roof on two supports — the eaves beam on posts, and a wall plate bolted to the house. Span equals the projection, typically 2.4–3.6 m. A gable adds a ridge beam, which halves the purlin span to 1.8–2.6 m per side, so a gable 7.2 m wide can use a lighter purlin than a lean-to 3.6 m deep. A hip or Victorian facet roof concentrates load at the ridge boss and needs a ring beam sized for the concentrated reaction, not just for distributed load.
Type
Typical projection
Purlin span
Ridge member
Best for
Lean-to
2.4–3.6 m
full projection
wall plate only
narrow gardens, patios
Gable
3.0–5.0 m
half width, 1.8–2.6 m
ridge beam 120×60×3
wide gardens, orangeries
Hip / Victorian
3.0–4.5 m
1.5–2.2 m per facet
ridge boss + ring beam
period properties, conservatories
Purlin sizing: the deflection check, not the stress check, decides it
Take a lean-to with 1.0 m purlin spacing. Dead load for 6+16Ar+6 insulated glass plus frame is about 0.40 kN/m²; add 1.0 kN/m² characteristic snow (EN 1991-1-3, moderate zone) and the line load is w = 1.4 kN/m. For 6063-T5 with an allowable bending stress of 70 MPa and E = 70,000 MPa, the simply-supported check is M = wL²/8 and δ = 5wL⁴/(384EI). Run it at three spans:
Span
Section
Load w
σ (MPa)
δ (mm)
Limit L/180
Verdict
2.4 m
100×50×3
1.4 kN/m
45.0
7.7 (L/312)
13.3
Pass
2.4 m
100×50×3
1.9 kN/m (snow 1.5)
61.0
10.5 (L/230)
13.3
Pass
3.0 m
100×50×3
1.4 kN/m
70.2
18.8 (L/159)
16.7
Fail — deflection
3.0 m
120×60×3
1.9 kN/m
65.0
14.5 (L/207)
16.7
Pass
3.6 m
120×60×3
1.9 kN/m
93.6
30.1 (L/120)
20.0
Fail — both
3.6 m
150×75×4
1.9 kN/m
45.2
11.6 (L/310)
20.0
Pass
Read the 3.0 m row carefully: stress is 70.2 MPa, only 0.3% over the 70 MPa allowable, but deflection is 18.8 mm against a 16.7 mm limit — it fails by 12% on stiffness while essentially passing on strength. A supplier quoting 100×50×3 for a 3.0 m lean-to is selling a roof that will not break but will visibly sag and pond water at the glazing bars, which is how sealant joints start leaking in year two.
Roof pitch and ponding. Below 5° (about 87 mm/m) water does not clear the glazing bar rebate and sits on the sealant bead permanently. Specify 7° minimum for insulated glass roofs, 10° where the site sees driving rain. Pitch also changes the snow load case: above 60° EN 1991-1-3 drops the snow coefficient to zero, but no sunhouse roof is built that steep.
Glass Greenhouse Glazing: U-Value, g-Value and Condensation
Glazing choice drives three separate outcomes — heat loss (U), solar gain (g), and condensation risk (internal surface temperature). Most buyers optimise the first and get burnt by the third. The internal surface temperature check is one line: Ti − Tsi = 0.125 × U × (Ti − To), then compare Tsi to the room dew point.
Glazing build-ups and measured values
Build-up
Ug (W/m²K)
g / SHGC
Light trans.
Weight
Where it goes
5 mm tempered single
5.6
0.85
89%
12.5 kg/m²
greenhouse side walls
10 mm twin-wall polycarbonate
3.2
0.68
80%
1.7 kg/m²
horticultural roofs
5+9A+5 float
2.9
0.72
80%
25 kg/m²
budget lean-to walls
5+12A+5 Low-E
1.9
0.60
70%
25 kg/m²
standard sunhouse walls
6+16Ar+6 Low-E
1.5
0.55
66%
30 kg/m²
4-season / wintergarden
6+1.52PVB+6 Low-E laminated
2.0
0.52
63%
30 kg/m²
overhead / roof glazing
Condensation: run the surface temperature, not the humidity
At Ti = 21 °C and To = 0 °C, dew point is 10.2 °C at 50% RH and 12.9 °C at 60% RH. Every roof build-up above clears both except the single pane:
Roof build-up
U
Tsi (°C)
50% RH (10.2)
60% RH (12.9)
70% RH (15.3)
5 mm single tempered
5.6
6.3
Condenses
Condenses
Condenses
5+9A+5
2.9
13.4
Dry
Dry
Condenses
5+12A+5 Low-E
1.9
16.0
Dry
Dry
Dry
6+16Ar+6 Low-E
1.5
17.1
Dry
Dry
Dry
The practical consequence: a glass greenhouse roof in single glazing will drip every cold morning, and the complaint filed against it is always logged as “the roof leaks”. It is not leaking. Condensate forms on the underside because Tsi = 6.3 °C sits 4 K below the dew point. Either accept it and fit a condensate channel under the glazing bar, or move to U ≤ 2.0 for a habitable room.
Conservatory Thermal Envelope and Frame Uf
The frame is 15–25% of the envelope area but contributes a disproportionate share of the heat loss when there is no thermal break. The whole-unit value combines glass, frame and the spacer edge effect: Uw = (Ug·Ag + Uf·Af + Ψ·L) / A.
Thermal break width vs frame Uf
Series
Insulation
Uf (W/m²K)
Depth
Max glass
Application
55 non-break
none
5.9–6.6
55 mm
5+9A+5
greenhouse frames
60 TB
PA66 GF25, 18 mm
3.0–3.4
60 mm
5+12A+5
economy sunhouse
65 TB
PA66 GF25, 24 mm
2.2–2.6
65 mm
6+16Ar+6
standard sunhouse
75 TB + foam
PA66 GF25, 30 mm + PE foam
1.8–2.2
75 mm
6+16Ar+6 / triple
4-season, wintergarden
Worked Uw for a 1200 × 1500 mm unit
Take Ag = 1.53 m², Af = 0.27 m², total A = 1.80 m², linear spacer loss Ψ = 0.05 W/mK over L = 5.4 m (0.27 W/K). With Ug = 1.8 (5+12A+5 Low-E):
Difference is 0.57 W/m²K — about 22% — because glass dominates at this frame fraction. The break matters far more on the condensation side: frame Tsi without a break drops to roughly 11 °C at 0 °C outside, which is where the “sweating frame” complaints come from.
For a conservatory attached to a heated house, most European and UK building rules treat the glazed room as exempt from the dwelling’s envelope requirements only if it is thermally separated — an external-quality door between house and sunhouse, and independent heating control. Removing that door to open the room into the living space usually reclassifies it as an extension and pulls the whole glazed envelope up to dwelling U-value limits (typically 1.4–1.8 W/m²K for walls, 2.0 W/m²K for the roof), which single glazing cannot meet. Confirm the separation requirement with the local authority before finalising the glazing spec.
Frame and glass selection interacts with the rest of the building envelope — if you are also specifying windows for the host property, the frame series used here is the same one covered in our aluminium windows and doors range, so finishes and hardware stay consistent across the project.
Glass House Garden: Growing Space vs Habitable Room
A garden glass house and a habitable sun room look identical in a photograph and are engineered differently. The plant version needs light and air exchange; the people version needs surface temperature and shading. Specify the wrong one and the result is either a room that cooks at 38 °C in July or a greenhouse where tomatoes stall at half yield.
Light: PAR transmission is the deciding number
Plants use 400–700 nm (photosynthetically active radiation). Solar-control coatings cut PAR hard:
Parameter
Plant house
Habitable sun room
PAR transmission target
85–91% (float / tempered)
45–70% acceptable
Glazing
4–5 mm horticultural, or 10 mm twin-wall PC
laminated Low-E IGU
Continuous ventilation
0.75–1.0 ACH
0.35–0.5 ACH (ASHRAE 62.2)
Day temperature band
18–27 °C, night >12 °C
20–24 °C year-round
Condensation
accepted, drain it
must not occur
CO₂
enrichment to 800–1,000 ppm
n/a
A standard solar-control Low-E double unit passes roughly 50–60% PAR; a double-silver solar-control coating drops that to 38–52%. Fruiting crops need 25–30 mol PAR/m²/day; at 50% transmission a Mediterranean winter day (about 15 mol outdoors) delivers 7.5 mol indoors, which will not finish a tomato crop. If the brief says greenhouse, do not put solar-control glass in the roof.
Summer heat: size the vents against the actual gain
For a 32 m² floor with 34 m² of glazed roof at g = 0.55 and 750 W/m² peak irradiance, the instantaneous gain is 34 × 750 × 0.55 = 14.0 kW. Ventilation removes heat at Q = 1.206 × V̇ × ΔT kW, so with a realistic 4 K indoor/outdoor difference you need V̇ = 14.0 / (1.206 × 4) = 2.9 m³/s — about 10,450 m³/h, or 126 air changes per hour. Stack effect alone cannot deliver that:
Stack pressure Δp = g·h·Δρ; at Ti = 30 °C, To = 25 °C, h = 2.6 m, Δρ = 0.0196 kg/m³ → Δp = 0.50 Pa
Velocity v = √(2Δp/ρ) = 0.92 m/s; with inlet = outlet = 1.0 m², effective area A = 0.707 m² → V̇ = 0.65 m³/s
Heat removed = 1.206 × 0.65 × 5 = 3.9 kW against a 14.0 kW load — 28%
Sequencing matters. Cut g first (Low-E plus a roof blind at shading coefficient 0.35 takes 14.0 kW to 4.9 kW), then add cross ventilation sized at 5% of floor area for roof vents and 10% for low-level inlets. Doing it the other way round — fitting more vents and keeping clear glass — spends money and still leaves the room 6 K above ambient. Our roof-load and g-value analysis covers the same load chain on larger spans: roof load, g-value and ventilation sizing.
Outdoor Sun Room: Base, Drainage and Installation
A factory-cut kit arrives with every profile machined to ±0.5 mm. The site does not get that tolerance unless the base is right. Level the slab to ±3 mm over 3 m before the crate is opened — the single most common cause of a sunhouse that will not seal is a base out by 8 mm.
Base options and anchor specification
Base type
Spec
Fixing
Typical cost
Note
Concrete slab
150 mm C25/30, DPM, 32 m²
M10×100 chemical anchor, 600 mm centres
$85–110 /m²
best thermal mass
Steel ring beam
100×50×3 SHS on padstones
M10 304 SS through-bolt
$55–80 /m
uneven ground, no slab
Timber deck
joists 400 mm c/c, 45 mm deck
coach screw into joist, 500 mm c/c
$45–70 /m²
check deflection under 30 kg/m²
Installation sequence and commissioning checks
Sill bed: 6 mm EPDM gasket or a continuous silicone bed over the DPC; dry-set the sill first and shim at 600 mm intervals before drilling. Edge distance to slab ≥ 100 mm.
Frame assembly: posts → eaves beam → ridge. M8 A2-70 stainless bolts at 20–25 N·m. Check both diagonals within 2 mm over 3 m before any glass goes in.
Glazing: EPDM setting blocks (70 Shore A, 100 mm long) placed 100 mm from each corner; structural silicone bite ≥ 12 mm; joint 6 mm minimum, neutral cure, tooled within 10 minutes.
Roof and ridge: butyl tape on every bar lap with 50 mm overlap, mechanical pressure plate with EPDM gasket, M6 at 8–10 N·m. Never over-torque — the gasket compresses to 70% and then takes a permanent set.
Drainage: gutter slope 1:100 minimum. Check capacity: 18 m² roof at 50 mm/h rainfall = 0.25 L/s; a 100 × 75 mm gutter at 1:100 carries about 1.4 L/s, so the gutter is not the constraint — the downpipe and the outlet leaf guard are.
Commissioning: cycle each vent opener three times; set sliding door rollers so the top guide clearance is 1.5 mm (3 mm gives 0.07° of panel rock and a rattle); water spray test at 2 L/min·m² for 15 minutes and inspect every internal sill corner.
Hardware and accessories — vent openers, roller assemblies, screening — are specified alongside the frame so the torque and duty classes match; see the hardware and accessory duty classes used across our window and door systems. Drainage detailing for patio enclosures follows the same two-stage principle; the veranda and patio enclosure drainage page shows the sill detail.
How a Sunhouse Kit Is Manufactured
Every aluminium component in a kit is extruded, aged, finished, machined and assembled in one plant. The five stages below are what separate a kit that fits on day one from one that needs a grinder on site.
Extrusion, alloy and temper
Alloy: 6063-T5 for frames (yield ≥ 110 MPa, tensile ≥ 160 MPa per EN 755-2); 6061-T6 only for heavily loaded ridge beams and long-span mullions (yield ≥ 240 MPa).
Wall thickness: 1.4 mm minimum for non-load-bearing infill, 1.8 mm for wall frames, 2.0 mm for roof bars and any member over 3 m. Thickness is verified with an ultrasonic gauge at three points per length.
Dimensional tolerance: EN 755-9 class — ±0.25 mm on cross-section dimensions up to 50 mm, straightness 0.4 mm per metre, twist 0.5° per metre.
Thermal break: PA66 GF25 polyamide strip, 24 mm or 30 mm, mechanically crimped into the knurled channel. Pull-off test ≥ 24 N/mm of strip width; the strip is the load path between inner and outer shells, so crimp depth is checked on every batch.
Surface finishing parameters
Finish
Process parameters
Film thickness
Test
Life (C4)
Polyester powder coat
chromate-free pre-treatment, 200 °C × 12 min
60–80 µm
ISO 2360, EN 12206-1
10–15 y
PVDF (70%)
3-coat, 240 °C × 10 min
≥ 40 µm
AAMA 2605 — 4,000 h salt spray
20–25 y
Anodising
sulphuric acid, 18–20 °C, 1.4 A/dm²
AA15–AA25 (15–25 µm)
ISO 7599, ISO 2135
20–30 y
Woodgrain sublimation
powder base + transfer at 190 °C
base 60 µm + transfer
ISO 11341 xenon 1,000 h
10–15 y
After finishing, every profile goes to a 4-axis CNC machining centre: drainage slots, weep holes at 300 mm centres, handle and lock preps, and bolt holes for site joints. Machining after coating means cut edges are exposed aluminium — a corrosion point — so all cut faces get a chromate-free touch-up pen in the crate. Machining tolerance is ±0.2 mm on hole centres, which is why the factory can guarantee frame diagonals and a site-built competitor cannot.
FOB Price Table by Configuration
Prices below are FOB Foshan, quoted per square metre of envelope area (roof + walls, not floor), at a 20 m² minimum. Envelope area is typically 1.7–2.1× the floor area for a lean-to, so a 30 m² floor room is quoted on 51–63 m² of envelope. Buyers comparing quotes per floor m² against per envelope m² will misread the number by nearly 2×.
Package
Frame
Glazing
FOB USD/m²
Uw
Glass greenhouse kit
6063-T5 non-break, 1.4 mm
5 mm tempered, auto roof vent
$75–110
5.6
Lean-to economy
60 series non-break, 1.6 mm
5+9A+5
$95–135
3.2
Lean-to standard
65 TB 24 mm, 1.8 mm
5+12A+5 Low-E, laminated roof
$145–195
2.0
Gable sunhouse
65 TB 24 mm, 2.0 mm
6+16Ar+6 Low-E, laminated roof
$185–250
1.8
4-season / wintergarden
75 TB 30 mm, 2.0 mm
6+16Ar+6 Low-E + 40 mm insulated panel
$255–330
1.3
Conservatory, solid roof
75 TB 30 mm, 2.0 mm
40 mm PIR sandwich + glazed gable
$210–280
1.1 roof
Add-on items and volume breaks
Item
Spec
USD
Automatic roof vent
wax cylinder, opens 20–25 °C
$55–90 each
Motorised roof vent + rain sensor
24 V actuator, 300 mm stroke
$210–340 each
Sliding door set
2 panels, 2.4 × 2.2 m
$380–620 per set
Motorised roof blind
SC 0.35 fabric, per m²
$95–160 /m²
Structural sealant kit
neutral cure, 12 units per room
$40–70 per unit
Export crate packing
5-ply ply + steel strap
$18–30 /m³
Volume breaks apply on cumulative envelope area per shipment: 20–49 m² list, 50–149 m² −4%, 150–499 m² −7%, 500 m² and above −11%. Price validity is 30 days from quotation; aluminium ingot is the dominant input, so a move of more than 8% in the LME 3-month price triggers a re-quote.
Budget for the base and the install. On shipped projects the local slab plus installation runs at 62–87% of the kit FOB value. Budgeting only the crate cost understates the landed number by about 70%. Glass, doors and frames shipped together in one crate attract one freight line; splitting them adds a second consignment and roughly doubles the per-unit handling cost.
Certifications and Test Data
A glazed structure is a structural product, a glazing product and often a door product at the same time, so three sets of standards apply. Ask for the test report number, not the certificate — certificates are issued to a product family, test reports carry the actual configuration you are buying.
Standard
Scope
Typical declared value
EN 1090-1, EXC2
structural aluminium components, FPC audit
CE marking, DoP per component
EN 14351-1
air, water, wind resistance
air Class 4 (600 Pa), water Class E900, wind C4/B5
EN 1279-5 / -6
IGU durability, argon retention
fogging pass, gas loss ≤ 1%/year
EN 12150-1
thermally tempered safety glass
fragment count ≥ 40 in 50×50 mm
EN 12600
pendulum impact classification
1B1 / 2B2 for overhead glazing
NFRC 100 / 200 / 500
US U-factor, SHGC, air leakage
U 0.28–0.35 BTU/h·ft²·°F (1.6–2.0 W/m²K)
AAMA/WDMA/CSA 101/I.S.2/A440
North American performance class
R / CW / AW by project wind zone
Miami-Dade NOA, TAS 201–203
HVHZ impact and cyclic pressure
large missile impact + 9,000 cycles
AS 2047 / AS 1288
Australian window rating and glazing
N4 / N5 for glazed enclosures
ISO 9001 / ISO 14001
factory quality and environmental management
annual surveillance audit
What to ask the factory to send
Declaration of Performance with the exact profile series, glass build-up and maximum panel size tested — not the family certificate.
IGU test report showing spacer type, gas fill percentage and the EN 1279-6 gas-loss result.
Structural calculation sheet for the roof purlin, signed, with the snow and wind case used and the resulting span limit stated.
Coating batch number and the ISO 2360 thickness readings, so a later extension can be colour-matched.
MOQ, Payment, Packing and Container Loading
Commercial terms
Item
Term
MOQ
20 m² envelope (single unit); 300 m² for a dedicated OEM profile run
Lead time
25–35 days after drawing sign-off; +7–10 days for a new extrusion die
Payment
T/T 30% deposit, 70% before shipment; L/C at sight above $50,000; open account after three settled orders
Incoterms
FOB Foshan / Shenzhen; CFR and CIF on request; DAP for consolidated EU and AU shipments
Warranty
10 years frame coating, 10 years IGU seal, 5 years hardware and motors
Documents
packing list with crate numbers matching the assembly drawing, CoO, Form E where applicable, DoP
Packing spec and container maths
Glass: A-frame steel rack, panels vertical, PE foam between panes, kraft interleaving; crate 1.2 × 0.9 × 1.1 m.
Profiles: bundled in 2.2 × 0.6 × 0.5 m crates, shrink-wrapped with corner protection; each bundle labelled with the assembly drawing reference.
Unit weight: 28–34 kg/m² of envelope, glass-dominated.
Loading: a 40HQ takes 420–560 m² of envelope. At 30 kg/m² that is 12.6–16.8 t against a 26 t payload — 46–65% of the weight limit but 92–96% of the 68 m³ volume. Sunhouses are volume-limited light cargo, so freight is charged on cube; a sunhouse order will not fill a container on weight, and it should be consolidated with doors or window stock rather than shipped alone.
Kit Sunhouse vs Site-Built Custom
The trade-off is tolerance and programme against dimensional freedom. A kit is modular in 50 mm steps and needs a level base; a site build absorbs an irregular base but takes six to ten weeks on site and costs roughly double per square metre.
Factor
Factory kit
Site-built custom
Design and approvals
7–12 days
4–8 weeks
Manufacture
25–35 days, weather-independent
6–10 weeks on site, weather-exposed
Envelope cost
$145–250 /m² FOB
$320–520 /m² installed
Site labour, 30 m²
3–5 days, 2–3 crew
15–25 days
Dimensional tolerance
±0.5 mm, CNC machined
±3 mm typical
Base requirement
level within ±3 mm over 3 m
can be shimmed and scribed on site
Width increments
50 mm modular
fully bespoke
Kits win on rectangular, regular footprints with a prepared slab. Site-built wins on splayed walls, listed-building profiles and sites where the existing wall is out of plumb by more than 15 mm over the length — a kit cannot absorb that, because the wall plate is pre-drilled.
Project Data: 32 m² Lean-To Sunhouse
A 2019-built single-storey house in Melbourne, Australia, 8.0 × 4.0 m lean-to against the rear wall, eaves 2.40 m, ridge 3.10 m, roof pitch 10.1°. Design wind N3 per AS 4055 (0.96 kPa ultimate); no snow case.
Specification and cost breakdown
Line
Detail
USD
Kit, 62 m² envelope
65 TB 24 mm, walls 6+16Ar+6 Low-E (Ug 1.5), roof 6+1.52PVB+6 laminated Low-E, PVDF dark grey
Summer, 33 °C ambient, blinds deployed: internal peak 29.5 °C. Roof solar gain 14.0 kW reduced to 4.9 kW by the SC 0.35 blind; remainder absorbed by the slab mass and cross ventilation at 1.5 m/s.
Summer, blinds retracted: internal peak 38.0 °C — a 5 K overshoot above ambient, which is what happens when shading is treated as optional.
Winter, 5 °C ambient, sunny, no heating: internal 16.8 °C at 14:00; the room contributes about 1.1 kW of gain to the adjoining living room through the open door.
Condensation: roof Tsi 17.1 °C at 0 °C outside and 55% RH — no condensation recorded over two winters. The neighbouring property with a single-glazed roof reports daily dripping, consistent with the 6.3 °C surface temperature calculated above.
For year-round use in colder climates the same footprint moves to the 75 mm thermal break with a 40 mm insulated roof panel — the configuration covered in our four-season sunroom specification. Greenhouse variants using 10 mm twin-wall polycarbonate instead of glass drop roof dead load from 0.40 to 0.20 kN/m², which brings a 100×50×3 purlin back into tolerance at 3.0 m span — but only just, at 16.1 mm deflection against a 16.7 mm limit. There is no margin, and polycarbonate loses 1–1.5% light transmission per year to UV yellowing, so budget a re-sheet in year 12–15.
Buyer Spec Checklist
Send these twelve items with the enquiry and the quotation will come back complete rather than conditional:
Footprint (length × projection), eaves height, and whether the host wall is plumb — note any deviation over 10 mm.
Roof geometry: lean-to, gable, or hip / Victorian, with the target pitch in degrees.
Use class: horticultural, habitable seasonal, or habitable year-round — this sets the glazing and ventilation requirements.
Design wind pressure (kPa or mph) and snow load (kN/m²) for the site, plus exposure category.
Glazing build-up for walls and for roof separately, with target Ug and g-value.
Frame series and thermal break width, with target Uf.
Finish: powder coat (RAL or Akzo code), PVDF, anodising grade, or woodgrain.
Door configuration: sliding, folding, or French casement; number of panels and opening direction.
Ventilation: number and type of roof vents, plus low-level inlet area as a percentage of floor area.
Shading: internal or external blinds, with the shading coefficient required.
Certification package needed: CE/EN 1090, NFRC, AAMA, Miami-Dade NOA, or AS 2047.
Base type ready on site — slab, steel ring beam, or deck — and confirmation it is level to ±3 mm over 3 m.