Blog

Home   >   Blog   >   Aluminum Sunhouse Wholesaler in China: Glass Greenhouse Specs and FOB Prices

Aluminum Sunhouse Wholesaler in China: Glass Greenhouse Specs and FOB Prices

Aluminium sunhouse with thermal break frame and insulated glass roof attached to a house in China
Aluminium sunhouse, 65 series thermal break frame with 6+16Ar+6 Low-E insulated glass and laminated roof glazing.
A sunhouse is a glazed garden room bolted to an existing wall, and the failure modes are always the same three: an undersized roof purlin that deflects under snow, a roof glazing build-up cold enough to condense, and a base that is out of level by more than 3 mm. This page works through the numbers for each of them — member sizing, glazing selection, drainage, FOB pricing, container loading — for aluminium sunhouse kits built in Foshan and shipped as factory-cut packages.
FOB Foshan
$75–330
per m² envelope, MOQ 20 m²
Uw (frame+glass)
1.9–2.6
W/m²K, 24–30 mm PA66 break
Profile wall
1.4–2.0 mm
6063-T5, EN 755-9 tolerances
Lead time
25–35 d
after drawing sign-off
40HQ load
420–560
m² envelope, volume-limited

On this page

1. Sunhouse configurations and roof member sizing

2. Glass greenhouse glazing: U-value and condensation

3. Conservatory thermal envelope and frame Uf

4. Glass house garden: growing vs habitable rooms

5. Outdoor sun room base, drainage and installation

6. How the kit is manufactured

7. FOB price table by configuration

8. Certifications and test data

9. MOQ, payment, packing, container loading

10. Kit sunhouse vs site-built custom

11. Project data: 32 m² lean-to

12. Buyer spec checklist

Sunhouse Configurations and Roof Member Sizing

Three roof geometries cover roughly 90% of orders: lean-to (single pitch against an existing wall), gable (ridged, free-standing or semi-detached), and hip / Victorian conservatory (multi-facet, usually 3 or 5 facets). The geometry pick is not aesthetic — it sets the roof span, and the roof span sets the purlin section, which is where most budget quotes quietly cut cost.

Lean-to, gable and hip: what each one does to the span

A lean-to sunhouse carries the roof on two supports — the eaves beam on posts, and a wall plate bolted to the house. Span equals the projection, typically 2.4–3.6 m. A gable adds a ridge beam, which halves the purlin span to 1.8–2.6 m per side, so a gable 7.2 m wide can use a lighter purlin than a lean-to 3.6 m deep. A hip or Victorian facet roof concentrates load at the ridge boss and needs a ring beam sized for the concentrated reaction, not just for distributed load.

Type Typical projection Purlin span Ridge member Best for
Lean-to 2.4–3.6 m full projection wall plate only narrow gardens, patios
Gable 3.0–5.0 m half width, 1.8–2.6 m ridge beam 120×60×3 wide gardens, orangeries
Hip / Victorian 3.0–4.5 m 1.5–2.2 m per facet ridge boss + ring beam period properties, conservatories

Purlin sizing: the deflection check, not the stress check, decides it

Take a lean-to with 1.0 m purlin spacing. Dead load for 6+16Ar+6 insulated glass plus frame is about 0.40 kN/m²; add 1.0 kN/m² characteristic snow (EN 1991-1-3, moderate zone) and the line load is w = 1.4 kN/m. For 6063-T5 with an allowable bending stress of 70 MPa and E = 70,000 MPa, the simply-supported check is M = wL²/8 and δ = 5wL⁴/(384EI). Run it at three spans:

Span Section Load w σ (MPa) δ (mm) Limit L/180 Verdict
2.4 m 100×50×3 1.4 kN/m 45.0 7.7 (L/312) 13.3 Pass
2.4 m 100×50×3 1.9 kN/m (snow 1.5) 61.0 10.5 (L/230) 13.3 Pass
3.0 m 100×50×3 1.4 kN/m 70.2 18.8 (L/159) 16.7 Fail — deflection
3.0 m 120×60×3 1.9 kN/m 65.0 14.5 (L/207) 16.7 Pass
3.6 m 120×60×3 1.9 kN/m 93.6 30.1 (L/120) 20.0 Fail — both
3.6 m 150×75×4 1.9 kN/m 45.2 11.6 (L/310) 20.0 Pass

Read the 3.0 m row carefully: stress is 70.2 MPa, only 0.3% over the 70 MPa allowable, but deflection is 18.8 mm against a 16.7 mm limit — it fails by 12% on stiffness while essentially passing on strength. A supplier quoting 100×50×3 for a 3.0 m lean-to is selling a roof that will not break but will visibly sag and pond water at the glazing bars, which is how sealant joints start leaking in year two.

Roof pitch and ponding. Below 5° (about 87 mm/m) water does not clear the glazing bar rebate and sits on the sealant bead permanently. Specify 7° minimum for insulated glass roofs, 10° where the site sees driving rain. Pitch also changes the snow load case: above 60° EN 1991-1-3 drops the snow coefficient to zero, but no sunhouse roof is built that steep.

Glass Greenhouse Glazing: U-Value, g-Value and Condensation

Glazing choice drives three separate outcomes — heat loss (U), solar gain (g), and condensation risk (internal surface temperature). Most buyers optimise the first and get burnt by the third. The internal surface temperature check is one line: Ti − Tsi = 0.125 × U × (Ti − To), then compare Tsi to the room dew point.

Glazing build-ups and measured values

Build-up Ug (W/m²K) g / SHGC Light trans. Weight Where it goes
5 mm tempered single 5.6 0.85 89% 12.5 kg/m² greenhouse side walls
10 mm twin-wall polycarbonate 3.2 0.68 80% 1.7 kg/m² horticultural roofs
5+9A+5 float 2.9 0.72 80% 25 kg/m² budget lean-to walls
5+12A+5 Low-E 1.9 0.60 70% 25 kg/m² standard sunhouse walls
6+16Ar+6 Low-E 1.5 0.55 66% 30 kg/m² 4-season / wintergarden
6+1.52PVB+6 Low-E laminated 2.0 0.52 63% 30 kg/m² overhead / roof glazing

Condensation: run the surface temperature, not the humidity

At Ti = 21 °C and To = 0 °C, dew point is 10.2 °C at 50% RH and 12.9 °C at 60% RH. Every roof build-up above clears both except the single pane:

Roof build-up U Tsi (°C) 50% RH (10.2) 60% RH (12.9) 70% RH (15.3)
5 mm single tempered 5.6 6.3 Condenses Condenses Condenses
5+9A+5 2.9 13.4 Dry Dry Condenses
5+12A+5 Low-E 1.9 16.0 Dry Dry Dry
6+16Ar+6 Low-E 1.5 17.1 Dry Dry Dry

The practical consequence: a glass greenhouse roof in single glazing will drip every cold morning, and the complaint filed against it is always logged as “the roof leaks”. It is not leaking. Condensate forms on the underside because Tsi = 6.3 °C sits 4 K below the dew point. Either accept it and fit a condensate channel under the glazing bar, or move to U ≤ 2.0 for a habitable room.

Conservatory Thermal Envelope and Frame Uf

The frame is 15–25% of the envelope area but contributes a disproportionate share of the heat loss when there is no thermal break. The whole-unit value combines glass, frame and the spacer edge effect: Uw = (Ug·Ag + Uf·Af + Ψ·L) / A.

Thermal break width vs frame Uf

Series Insulation Uf (W/m²K) Depth Max glass Application
55 non-break none 5.9–6.6 55 mm 5+9A+5 greenhouse frames
60 TB PA66 GF25, 18 mm 3.0–3.4 60 mm 5+12A+5 economy sunhouse
65 TB PA66 GF25, 24 mm 2.2–2.6 65 mm 6+16Ar+6 standard sunhouse
75 TB + foam PA66 GF25, 30 mm + PE foam 1.8–2.2 75 mm 6+16Ar+6 / triple 4-season, wintergarden

Worked Uw for a 1200 × 1500 mm unit

Take Ag = 1.53 m², Af = 0.27 m², total A = 1.80 m², linear spacer loss Ψ = 0.05 W/mK over L = 5.4 m (0.27 W/K). With Ug = 1.8 (5+12A+5 Low-E):

For a conservatory attached to a heated house, most European and UK building rules treat the glazed room as exempt from the dwelling’s envelope requirements only if it is thermally separated — an external-quality door between house and sunhouse, and independent heating control. Removing that door to open the room into the living space usually reclassifies it as an extension and pulls the whole glazed envelope up to dwelling U-value limits (typically 1.4–1.8 W/m²K for walls, 2.0 W/m²K for the roof), which single glazing cannot meet. Confirm the separation requirement with the local authority before finalising the glazing spec.

Frame and glass selection interacts with the rest of the building envelope — if you are also specifying windows for the host property, the frame series used here is the same one covered in our aluminium windows and doors range, so finishes and hardware stay consistent across the project.

Aluminium window frame and glazing specifications — same 6063-T5 extrusion series, matching powder-coat batch control.

Glass House Garden: Growing Space vs Habitable Room

A garden glass house and a habitable sun room look identical in a photograph and are engineered differently. The plant version needs light and air exchange; the people version needs surface temperature and shading. Specify the wrong one and the result is either a room that cooks at 38 °C in July or a greenhouse where tomatoes stall at half yield.

Light: PAR transmission is the deciding number

Plants use 400–700 nm (photosynthetically active radiation). Solar-control coatings cut PAR hard:

Parameter Plant house Habitable sun room
PAR transmission target 85–91% (float / tempered) 45–70% acceptable
Glazing 4–5 mm horticultural, or 10 mm twin-wall PC laminated Low-E IGU
Continuous ventilation 0.75–1.0 ACH 0.35–0.5 ACH (ASHRAE 62.2)
Day temperature band 18–27 °C, night >12 °C 20–24 °C year-round
Condensation accepted, drain it must not occur
CO₂ enrichment to 800–1,000 ppm n/a

A standard solar-control Low-E double unit passes roughly 50–60% PAR; a double-silver solar-control coating drops that to 38–52%. Fruiting crops need 25–30 mol PAR/m²/day; at 50% transmission a Mediterranean winter day (about 15 mol outdoors) delivers 7.5 mol indoors, which will not finish a tomato crop. If the brief says greenhouse, do not put solar-control glass in the roof.

Summer heat: size the vents against the actual gain

For a 32 m² floor with 34 m² of glazed roof at g = 0.55 and 750 W/m² peak irradiance, the instantaneous gain is 34 × 750 × 0.55 = 14.0 kW. Ventilation removes heat at Q = 1.206 × V̇ × ΔT kW, so with a realistic 4 K indoor/outdoor difference you need V̇ = 14.0 / (1.206 × 4) = 2.9 m³/s — about 10,450 m³/h, or 126 air changes per hour. Stack effect alone cannot deliver that:

Sequencing matters. Cut g first (Low-E plus a roof blind at shading coefficient 0.35 takes 14.0 kW to 4.9 kW), then add cross ventilation sized at 5% of floor area for roof vents and 10% for low-level inlets. Doing it the other way round — fitting more vents and keeping clear glass — spends money and still leaves the room 6 K above ambient. Our roof-load and g-value analysis covers the same load chain on larger spans: roof load, g-value and ventilation sizing.

Outdoor Sun Room: Base, Drainage and Installation

A factory-cut kit arrives with every profile machined to ±0.5 mm. The site does not get that tolerance unless the base is right. Level the slab to ±3 mm over 3 m before the crate is opened — the single most common cause of a sunhouse that will not seal is a base out by 8 mm.

Base options and anchor specification

Base type Spec Fixing Typical cost Note
Concrete slab 150 mm C25/30, DPM, 32 m² M10×100 chemical anchor, 600 mm centres $85–110 /m² best thermal mass
Steel ring beam 100×50×3 SHS on padstones M10 304 SS through-bolt $55–80 /m uneven ground, no slab
Timber deck joists 400 mm c/c, 45 mm deck coach screw into joist, 500 mm c/c $45–70 /m² check deflection under 30 kg/m²

Installation sequence and commissioning checks

  1. Sill bed: 6 mm EPDM gasket or a continuous silicone bed over the DPC; dry-set the sill first and shim at 600 mm intervals before drilling. Edge distance to slab ≥ 100 mm.
  2. Frame assembly: posts → eaves beam → ridge. M8 A2-70 stainless bolts at 20–25 N·m. Check both diagonals within 2 mm over 3 m before any glass goes in.
  3. Glazing: EPDM setting blocks (70 Shore A, 100 mm long) placed 100 mm from each corner; structural silicone bite ≥ 12 mm; joint 6 mm minimum, neutral cure, tooled within 10 minutes.
  4. Roof and ridge: butyl tape on every bar lap with 50 mm overlap, mechanical pressure plate with EPDM gasket, M6 at 8–10 N·m. Never over-torque — the gasket compresses to 70% and then takes a permanent set.
  5. Drainage: gutter slope 1:100 minimum. Check capacity: 18 m² roof at 50 mm/h rainfall = 0.25 L/s; a 100 × 75 mm gutter at 1:100 carries about 1.4 L/s, so the gutter is not the constraint — the downpipe and the outlet leaf guard are.
  6. Commissioning: cycle each vent opener three times; set sliding door rollers so the top guide clearance is 1.5 mm (3 mm gives 0.07° of panel rock and a rattle); water spray test at 2 L/min·m² for 15 minutes and inspect every internal sill corner.

Hardware and accessories — vent openers, roller assemblies, screening — are specified alongside the frame so the torque and duty classes match; see the hardware and accessory duty classes used across our window and door systems. Drainage detailing for patio enclosures follows the same two-stage principle; the veranda and patio enclosure drainage page shows the sill detail.

How a Sunhouse Kit Is Manufactured

Every aluminium component in a kit is extruded, aged, finished, machined and assembled in one plant. The five stages below are what separate a kit that fits on day one from one that needs a grinder on site.

Extrusion, alloy and temper

Surface finishing parameters

Finish Process parameters Film thickness Test Life (C4)
Polyester powder coat chromate-free pre-treatment, 200 °C × 12 min 60–80 µm ISO 2360, EN 12206-1 10–15 y
PVDF (70%) 3-coat, 240 °C × 10 min ≥ 40 µm AAMA 2605 — 4,000 h salt spray 20–25 y
Anodising sulphuric acid, 18–20 °C, 1.4 A/dm² AA15–AA25 (15–25 µm) ISO 7599, ISO 2135 20–30 y
Woodgrain sublimation powder base + transfer at 190 °C base 60 µm + transfer ISO 11341 xenon 1,000 h 10–15 y

After finishing, every profile goes to a 4-axis CNC machining centre: drainage slots, weep holes at 300 mm centres, handle and lock preps, and bolt holes for site joints. Machining after coating means cut edges are exposed aluminium — a corrosion point — so all cut faces get a chromate-free touch-up pen in the crate. Machining tolerance is ±0.2 mm on hole centres, which is why the factory can guarantee frame diagonals and a site-built competitor cannot.

FOB Price Table by Configuration

Prices below are FOB Foshan, quoted per square metre of envelope area (roof + walls, not floor), at a 20 m² minimum. Envelope area is typically 1.7–2.1× the floor area for a lean-to, so a 30 m² floor room is quoted on 51–63 m² of envelope. Buyers comparing quotes per floor m² against per envelope m² will misread the number by nearly 2×.

Package Frame Glazing FOB USD/m² Uw
Glass greenhouse kit 6063-T5 non-break, 1.4 mm 5 mm tempered, auto roof vent $75–110 5.6
Lean-to economy 60 series non-break, 1.6 mm 5+9A+5 $95–135 3.2
Lean-to standard 65 TB 24 mm, 1.8 mm 5+12A+5 Low-E, laminated roof $145–195 2.0
Gable sunhouse 65 TB 24 mm, 2.0 mm 6+16Ar+6 Low-E, laminated roof $185–250 1.8
4-season / wintergarden 75 TB 30 mm, 2.0 mm 6+16Ar+6 Low-E + 40 mm insulated panel $255–330 1.3
Conservatory, solid roof 75 TB 30 mm, 2.0 mm 40 mm PIR sandwich + glazed gable $210–280 1.1 roof

Add-on items and volume breaks

Item Spec USD
Automatic roof vent wax cylinder, opens 20–25 °C $55–90 each
Motorised roof vent + rain sensor 24 V actuator, 300 mm stroke $210–340 each
Sliding door set 2 panels, 2.4 × 2.2 m $380–620 per set
Motorised roof blind SC 0.35 fabric, per m² $95–160 /m²
Structural sealant kit neutral cure, 12 units per room $40–70 per unit
Export crate packing 5-ply ply + steel strap $18–30 /m³

Volume breaks apply on cumulative envelope area per shipment: 20–49 m² list, 50–149 m² −4%, 150–499 m² −7%, 500 m² and above −11%. Price validity is 30 days from quotation; aluminium ingot is the dominant input, so a move of more than 8% in the LME 3-month price triggers a re-quote.

Budget for the base and the install. On shipped projects the local slab plus installation runs at 62–87% of the kit FOB value. Budgeting only the crate cost understates the landed number by about 70%. Glass, doors and frames shipped together in one crate attract one freight line; splitting them adds a second consignment and roughly doubles the per-unit handling cost.

Certifications and Test Data

A glazed structure is a structural product, a glazing product and often a door product at the same time, so three sets of standards apply. Ask for the test report number, not the certificate — certificates are issued to a product family, test reports carry the actual configuration you are buying.

Standard Scope Typical declared value
EN 1090-1, EXC2 structural aluminium components, FPC audit CE marking, DoP per component
EN 14351-1 air, water, wind resistance air Class 4 (600 Pa), water Class E900, wind C4/B5
EN 1279-5 / -6 IGU durability, argon retention fogging pass, gas loss ≤ 1%/year
EN 12150-1 thermally tempered safety glass fragment count ≥ 40 in 50×50 mm
EN 12600 pendulum impact classification 1B1 / 2B2 for overhead glazing
NFRC 100 / 200 / 500 US U-factor, SHGC, air leakage U 0.28–0.35 BTU/h·ft²·°F (1.6–2.0 W/m²K)
AAMA/WDMA/CSA 101/I.S.2/A440 North American performance class R / CW / AW by project wind zone
Miami-Dade NOA, TAS 201–203 HVHZ impact and cyclic pressure large missile impact + 9,000 cycles
AS 2047 / AS 1288 Australian window rating and glazing N4 / N5 for glazed enclosures
ISO 9001 / ISO 14001 factory quality and environmental management annual surveillance audit

What to ask the factory to send

MOQ, Payment, Packing and Container Loading

Commercial terms

Item Term
MOQ 20 m² envelope (single unit); 300 m² for a dedicated OEM profile run
Lead time 25–35 days after drawing sign-off; +7–10 days for a new extrusion die
Payment T/T 30% deposit, 70% before shipment; L/C at sight above $50,000; open account after three settled orders
Incoterms FOB Foshan / Shenzhen; CFR and CIF on request; DAP for consolidated EU and AU shipments
Warranty 10 years frame coating, 10 years IGU seal, 5 years hardware and motors
Documents packing list with crate numbers matching the assembly drawing, CoO, Form E where applicable, DoP

Packing spec and container maths

Kit Sunhouse vs Site-Built Custom

The trade-off is tolerance and programme against dimensional freedom. A kit is modular in 50 mm steps and needs a level base; a site build absorbs an irregular base but takes six to ten weeks on site and costs roughly double per square metre.

Factor Factory kit Site-built custom
Design and approvals 7–12 days 4–8 weeks
Manufacture 25–35 days, weather-independent 6–10 weeks on site, weather-exposed
Envelope cost $145–250 /m² FOB $320–520 /m² installed
Site labour, 30 m² 3–5 days, 2–3 crew 15–25 days
Dimensional tolerance ±0.5 mm, CNC machined ±3 mm typical
Base requirement level within ±3 mm over 3 m can be shimmed and scribed on site
Width increments 50 mm modular fully bespoke

Kits win on rectangular, regular footprints with a prepared slab. Site-built wins on splayed walls, listed-building profiles and sites where the existing wall is out of plumb by more than 15 mm over the length — a kit cannot absorb that, because the wall plate is pre-drilled.

Project Data: 32 m² Lean-To Sunhouse

A 2019-built single-storey house in Melbourne, Australia, 8.0 × 4.0 m lean-to against the rear wall, eaves 2.40 m, ridge 3.10 m, roof pitch 10.1°. Design wind N3 per AS 4055 (0.96 kPa ultimate); no snow case.

Specification and cost breakdown

Line Detail USD
Kit, 62 m² envelope 65 TB 24 mm, walls 6+16Ar+6 Low-E (Ug 1.5), roof 6+1.52PVB+6 laminated Low-E, PVDF dark grey $9,850
Doors and vents 2 sliding panels 2.4×2.2 m, 3 motorised roof vents (1.65 m²), rain sensor included
Freight and insurance Foshan → Melbourne, 2 crates, 6.8 m³, LCL $1,480
Local slab 32 m² × 150 mm C25/30 with DPM $3,040
Installation labour 2 installers × 4 days $4,560
Landed total 32 m² floor → $592/m² $18,930
Local custom quote same size, site-built, aluminium $27,500

Measured performance

For year-round use in colder climates the same footprint moves to the 75 mm thermal break with a 40 mm insulated roof panel — the configuration covered in our four-season sunroom specification. Greenhouse variants using 10 mm twin-wall polycarbonate instead of glass drop roof dead load from 0.40 to 0.20 kN/m², which brings a 100×50×3 purlin back into tolerance at 3.0 m span — but only just, at 16.1 mm deflection against a 16.7 mm limit. There is no margin, and polycarbonate loses 1–1.5% light transmission per year to UV yellowing, so budget a re-sheet in year 12–15.

Buyer Spec Checklist

Send these twelve items with the enquiry and the quotation will come back complete rather than conditional:

The three numbers that decide whether a sunhouse works are roof purlin deflection under the site snow case, roof internal surface temperature against the room dew point, and base level before the crate is opened. Get those right and the rest of the specification is a matter of finish and hardware. Related reading: glass greenhouse and orangerie specifications, sliding glass door frame specs and U-values, and outdoor glass room packages from Foshan.
[footer_contact_form]