Home > Exterior Doors > Exterior Front Entry Doors Manufacturer in China: Cast Aluminum vs Steel Specs
Exterior Front Entry Doors Manufacturer in China: Cast Aluminum vs Steel Specs
Cast aluminum front entry door with frosted glass sidelights on a residential villa in China.
Exterior front entry doors for houses ship from China in three constructions: gravity-cast aluminum panels on an extruded thermal-break frame, extruded aluminum glazed leaves, and pressed steel skins. This article sets out the casting process and alloy data, side-by-side comparison tables for cast aluminum versus steel, NFRC U-factor and condensation numbers, PAS 24 and ASTM F476 security testing, FOB price lists in USD, MOQ and container loading, installation details, and a 36-villa project record with delivered cost data.
Cast Aluminum Door Construction: Casting Process and Leaf Build-Up
A cast aluminum door uses a solid panel produced by casting, not by folding and rolling sheet. The panel carries relief patterns, carved ornament, or three-dimensional textures that extruded and pressed profiles cannot form. The panel is then mounted into an extruded 6063-T6 thermal-break frame that carries the glazing, gaskets, and hardware. Understanding the casting route explains most of the price difference against steel and extruded doors.
Casting method, alloy and heat treatment
Export-grade cast panels use A356.2 (Al-Si7Mg0.3) ingot, not secondary scrap. The melt is held at 720 ± 10 °C, degassed with argon rotary injection to hydrogen below 0.15 mL/100 g, and filtered through ceramic foam before pouring. Two routes are used:
Gravity casting into steel dies preheated to 250–300 °C. Standard for panels up to 1,100 mm wide; cycle time 4–6 minutes per panel; tooling cost $1,800–3,500 per pattern.
Low-pressure casting at 0.15–0.25 bar for panels above 1,100 mm or deep-relief ornament. Slower (8–12 minutes) but porosity drops to near zero, which matters for panels that get polished through later.
After casting, panels are T6 heat treated: solution at 535 °C for 6–8 h, water quench, artificial aging at 155 °C for 3–5 h. Per ASTM B108 / A356-T6 the result must reach ultimate tensile strength ≥ 262 MPa and yield ≥ 186 MPa, with elongation ≥ 5 %. Ask the supplier for the furnace chart and a spectrometer report per heat number; panels cast from unrefined scrap fail the elongation clause and crack during handling.
Panel cross-section, wall thickness and weight
Item
Cast aluminum panel
Extruded glazed leaf
Pressed steel door
Face wall thickness
8–14 mm casting, 3–5 mm ribs behind
1.4–2.0 mm extrusion wall
0.8–1.2 mm galvanized skin
Typical leaf weight (1,000 × 2,400)
90–150 kg
45–75 kg
45–70 kg
Panel U-value (solid area)
5.8 W/m²K unbroken; 1.9–2.2 with 30 mm PU backing or split thermal-break panel
2.0–2.6 W/m²K with double Low-E IGU
2.3–2.9 W/m²K with PU foam core
Formable geometry
3D relief, carving, embossed patterns
Flat or single-curve profiles only
Stamped shallow patterns only
Edge treatment
Cast edge, CNC trimmed and hand dressed
Machined and crimped
Lock seam or wrapped edge
Tooling lead time
12–20 days for a custom pattern
None for standard systems
None for standard emboss
Hinge and hardware load case
A 1,500 × 2,400 double-leaf cast door with 12 mm panel weight runs about 118 kg per leaf. Specify 304 stainless butterfly hinges rated 100 kg each, three per leaf, with anti-lift pins — the EN 1935 class 11 rating (100 kg, 200,000 cycles) covers it. Hinge screws must land in the cast rib line, not in the panel face; the frame side needs reinforcement plates welded or bolted across both jambs. Undersized hinges show as a 3–6 mm sag at the latch within two years and then the multi-point lock will not throw.
Steel Door vs Cast Aluminum Door vs Extruded Aluminum: Comparison Data
Buyers comparing a steel door against cast aluminum are usually comparing pressed-steel security doors against cast ornamental entry doors. The materials overlap less than the price lists suggest. The table below puts the three constructions on one page with test-based numbers.
Corrosion: salt spray test results
System
Coating
ASTM B117 salt spray
Observed failure mode
Pressed steel, polyester powder
60–80 µm polyester on galvanized 80 g/m²
480–720 h
Red rust at cut edges and hinge screw holes after 500–700 h; edge creep 2 mm
Pressed steel, zinc-rich primer
80 µm zinc-rich + 60 µm polyester
960 h
Cut-edge rust delayed but not eliminated; field life 8–12 years inland, 4–6 coastal
Extruded aluminum, polyester
60 µm polyester on 6063-T6
1,000 h
No red rust possible; pitting only if film below 40 µm
Cast aluminum, PVDF
25–30 µm PVDF per AAMA 2605
1,000–3,000 h
No blistering (ASTM D714 rating 8+), gloss retention above 70 % at 1,000 h
Cast aluminum, wood-grain transfer
60 µm polyester base + sublimation film
1,000 h
UV fade at south-facing elevations after 5–7 years; specify PVDF base for UV-heavy sites
Aluminum does not produce red rust under any coating condition; its oxide layer is inert. Steel corrosion is an edge-coating problem, not a material problem — a steel door can pass 1,000 h if every cut is sealed, but factory cut-outs for locks, viewers, and hinges rarely are. For coastal sites within 500 m of salt water, cast or extruded aluminum with 316 stainless hardware is the default; for inland budget projects a zinc-rich steel door is defensible.
Structural and security comparison
Metric
Cast aluminum
Extruded aluminum
Pressed steel
Panel stiffness
Very high (8–14 mm section); cannot be dented by hand
High for the frame; glazing panel is the weak face
Low skin stiffness; dents transfer through to core
Forced-entry resistance base
Panel cannot be cut with hand tools quietly; attack goes after lock
Depends on glazing and lock
Skin can be peeled at the lock seam in under 60 s
Fire rating (GB 12955 / EN 1634)
Not certified; panel melts above 660 °C
Not certified as standard
EI30/EI60 achievable with mineral core
Magnetic (affects access hardware)
No
No
Yes — magnetic contacts work on the leaf
Repair after impact
Weld and re-finish, color match at factory only
Replace profile section
Panel swap, low cost
20-year corrosion cost (coastal)
Near zero
Near zero
Re-coat or replace once
Cost per year of service
A pressed steel entry door at $260 FOB with a 10-year coastal service life costs $26 per year. A cast aluminum double at $1,120 FOB with a 25-year panel life and a $140 re-seal at year 12 costs about $50 per year — and the panel survives a re-finish, which resets the clock. The numbers cross only for inland sites where the steel door reaches its full 12–15 year life. For the full pressed-steel price list see the steel security door specs page; for the extruded-versus-cast decision on metal doors generally, the steel door vs aluminum comparison covers the same three-way split with garage and entry data.
Front Doors for Houses Modern: Configurations, Sizes and Glazing
Designers ordering front doors for houses modern elevations pick from five configurations. Sizes below are leaf sizes; frames add 60–90 mm per side.
Rough opening = frame outer size + 15–20 mm shim gap per side. Leaf heights above 2,450 mm need the reinforced frame profile (3.0 mm wall) and a five-point lock; a four-point minimum for double leaves.
Glazing options and Ug values
Build-up
Ug (W/m²K)
Applications
6 + 16A + 6 Low-E, argon
1.0
Sidelights and vision ports, standard
6 + 12A + 6 Low-E + 0.76 PVB laminated inner
1.1
Security sidelights — glass holds after break
5 + 9A + 5 + 9A + 5 triple Low-E
0.6
Cold climates, door with glazed surround
6 tinted reflective + 12A + 6
1.1
High-solar desert elevations, SHGC 0.25
Solid panel, no vision port
—
Maximum privacy and security
All glass is tempered per EN 12150 / ANSI Z97.1. For doors in HVHZ zones (Miami-Dade), glazing must pass TAS 201 large-missile impact — that means 6 + 1.52 PVB + 6 laminated minimum on any glazed element within 60 ft of grade.
Finish systems and film thickness
PVDF fluorocarbon, 25–30 µm, AAMA 2605 — 30+ year color retention, the coastal and desert default. Adds $60–90 per set over polyester.
Wood-grain heat transfer, 60 µm polyester base with sublimation film — walnut, teak, oak patterns; the most ordered finish for villa projects. Adds $90–140 per set.
Anodized, 15–20 µm film (AA15/AA20 per ISO 7599) — bronze and champagne; hardest surface, no chipping, limited color range.
Polyester powder, 60 µm, AAMA 2604 — budget RAL color option, 10–15 year color life. Standard inclusion in most quotes.
Thermal Performance: Whole-Door U-Factor and Condensation Check
Entry doors lose heat through three paths: the panel or glazing area, the frame, and the threshold. A cast aluminum panel without insulation is a thermal short circuit — the whole-door U-factor is decided by whether the panel carries an insulated backing or a split thermal-break core.
Whole-door U-factor by construction
Construction (1,000 × 2,400 single)
U W/m²K
U Btu/h·ft²·°F
Notes
Solid cast panel, no insulation
5.8
1.02
Not acceptable in climates below 0 °C design
Cast panel + 30 mm PU backing
2.1
0.37
Standard export build for temperate zones
Cast panel, split thermal-break core (24 mm PA66)
1.8
0.32
Best cast build; adds $70–110 per panel
Extruded thermal-break frame + 6+16A+6 Low-E
2.2
0.39
Standard glazed entry
Extruded frame + triple glazing 0.6 Ug
1.6
0.28
Cold climate upgrade
Pressed steel + 50 mm PU foam core
2.5
0.44
Standard steel security door
Certified numbers come from NFRC simulation or WIS/WinIso calculation per ISO 10077-2; the frame share of a glazed door runs 25–35 % of the total area, which is why frame thermal break width matters more on doors than on windows.
Condensation check for cold climates
Interior surface temperature on the cold side is the deciding number. Using θ_si = Ti − (Rsi / Rtot) × ΔT with Ti = 20 °C, Te = −10 °C (Chicago or Beijing design day), Rsi = 0.13 m²K/W:
Solid cast panel U 5.8: Rtot = 0.172, θ_si = 20 − (0.13/0.172) × 30 = −2.7 °C. Frost forms on the inside face at any interior humidity above 30 % RH.
PU-backed panel U 2.1: Rtot = 0.476, θ_si = 11.8 °C. Condensation starts above 52 % RH at 20 °C (dew point 9.3 °C). Manageable with ventilation.
Split thermal-break panel U 1.8: Rtot = 0.556, θ_si = 13.0 °C. Comfortable to 65 % RH.
Triple-glazed frame build U 1.6: θ_si = 13.8 °C at the frame edge with warm-edge spacer; 70 % RH tolerance.
Budget rule: for any project with a design temperature below −5 °C, specify the split thermal-break cast panel or the triple-glazed extruded build. The PU backing alone is fine down to about 0 °C design; below that the threshold and frame edges will drip before the panel does. The upgrade from PU backing to split core is $70–110 per panel — compare that against one water-damage claim.
Security Testing and Certification: PAS 24, ASTM F476, Miami-Dade
Entry doors are the attack point burglars actually use, so the security standard matters more than the sales copy. Three frameworks dominate export orders: PAS 24 (UK and Commonwealth), ASTM F476 (US), and the Miami-Dade TAS suite (HVHZ impact).
Forced-entry test levels and the door upgrades that pass them
Standard
Level
What is tested
Door build that passes
ASTM F476
Grade 30
Standard tool attack sequence, 5 min
Multi-point lock + 0.8 mm steel or cast panel + reinforced strike
ASTM F476
Grade 40
Extended attack, heavier tools
Grade 40 adds 3-point lock with 16 mm bolts and strike plates with 8 mm screws into studs
Extruded or cast build with multipoint lock; cylinder must reach EN 1303 and resist snapping
Miami-Dade TAS 201/202/203
NOA
Large-missile impact + cyclic pressure + water
Laminated 6+1.52+6 glazing, frame anchored per NOA schedule
Cast panels have a structural advantage: there is no lock seam to peel and no thin skin to fold. Attacks shift to the lock and cylinder, so the multi-point gearbox, cylinder rating, and strike reinforcement decide the outcome. A cast door with a $45 three-point lock upgrade passes F476 Grade 40; the same door with a single deadbolt does not.
What certification costs and how long it takes
Certification
Test cost per configuration
Duration
Validity
ASTM F476 Grade 30/40
$2,500–4,500
3–5 weeks
Per tested configuration
PAS 24 (UKAS lab)
$3,500–6,000
4–8 weeks incl. doc review
Product family, renewed per revision
Miami-Dade NOA
$8,000–15,000
3–6 months
Product family, no expiry
CE DoP per EN 14351-1
$1,200–2,500 (notified lab)
4–6 weeks
CE mark valid while DoP maintained
SGS/BV factory audit
$1,500–2,500 per audit
1 week
Annual
Ask which laboratory ran the test (Intertek, BSI, SGS, Exova/Warrington) and request the certificate number, not a logo sheet. For the certification list applied across the exterior range see the aluminium security exterior doors overview and the entrance door selection checklist.
Exterior Doors for Houses: Climate-Based Specification Matrix
Matching the construction to the site climate prevents 90 % of warranty claims on exterior doors for houses. The matrix below is what the factory uses internally to steer specifications.
Specification matrix by climate zone
Climate / site
Panel build
Finish
Hardware
Watch item
Temperate inland
Cast panel + 30 mm PU
Polyester 60 µm
304 SS, EN 1935 class 11
Standard terms apply
Coastal (within 500 m salt)
Cast panel + PU, flush threshold
PVDF AAMA 2605
316 SS hinges and lock face
Screw material; mixed metals void warranty
Hurricane / HVHZ
Cast or extruded + laminated glazing
PVDF
316 SS + NOA anchor schedule
TAS 201 large-missile on all glazed parts
Cold (below −5 °C design)
Split thermal-break cast panel or triple-glazed
PVDF dark colors ok
304 SS + thermal-break threshold
Threshold condensation; use warm-edge
Hot-arid / desert
Cast panel + PU, tinted or reflective glass
PVDF light RAL
304 SS + sand seals
Gasket UV aging; EPDM not TPE
High humidity tropical
Cast panel + PU, drainage weeps open
PVDF
316 SS
Ant sipage at threshold; keep weeps clear
Air, water and wind ratings (EN 12207 / 12208 / 12210)
A properly built entry door with twin EPDM gaskets and a drop-seal threshold reaches air permeability class 4 (≤ 3.0 m³/h·m² at 600 Pa), water tightness class 7A–9A (300–600 Pa), and wind load resistance C3–C5 depending on frame reinforcement. Declarations of performance per EN 14351-1 should state all three classes plus the U-value. A door quoted without a DoP is a different product even if the brochure photo matches.
Threshold and wheelchair compliance
Three threshold builds ship from the factory: exposed saddle (19–25 mm, lowest cost), rebated weather stop (15 mm), and flush thermal-break threshold (0–12 mm) with a drop-down seal driven off the leaf. Flush builds add $25–45 per set and require a sill pan with back dam — they are mandatory for projects referencing EN 17210 or the ADA where the entrance is an accessible route.
FOB Price List: Cast Aluminum, Extruded and Steel Entry Doors
Prices below are FOB Guangdong / Shanghai in USD, Q4 2026 market, aluminum ingot at $2,250–2,350/t. Volume breaks apply at 30 and 100 sets. Excluded: freight, duty, destination charges.
Price by construction and size
Construction
Single 1,000 × 2,400
Double 1,500 × 2,400
Double + sidelights / transom
Cast aluminum, PU-backed panel, polyester finish
$650–850
$980–1,320
$1,450–1,850
Cast aluminum, split thermal-break core, PVDF
$780–1,020
$1,150–1,580
$1,700–2,300
Extruded thermal-break, glazed, double Low-E
$420–620
$650–980
$950–1,400
Pressed steel security door, zinc-rich, PU core
$180–320
$280–450
—
Option add-on pricing
Option
Add per set
Comment
Wood-grain heat transfer finish
$90–140
Most ordered on villa projects
PVDF instead of polyester
$60–90
Coastal and desert default
3-point lock upgrade (single)
$45
Required for F476 Grade 40
Laminated inner pane 6+0.76+6
$60 per leaf
Security and +4 dB Rw
Smart-lock preparation (wiring + bracket)
$35
Lockset supplied by buyer
Custom cast pattern mold
$1,800–3,500 one-off
Waived above 50 sets
Flush thermal-break threshold
$25–45
ADA / EN 17210 routes
Landed cost example: 20 double doors to the US Gulf
Tariff check: aluminum door HTS classification and current Section 301 status change; confirm the code and rate with a customs broker before signing, and get the landed model in writing from the supplier with the freight quote attached. A 4 % duty miss on a 20-set order is about $1,000.
MOQ, Lead Time, Payment and Packing
Order terms for cast entry doors differ from extruded products mainly in tooling and casting schedule. The numbers below are the standard factory terms for mixed-container export orders.
Commercial terms
Term
Standard
Negotiable to
MOQ
10 sets mixed per order
5 sets with stock panel patterns
Lead time, stock pattern
35–45 days
25 days at 1.3× price
Lead time, custom mold
50–60 days (12–20 days tooling first)
—
Payment
30 % TT deposit, 70 % against B/L copy
LC at sight above $50,000
Warranty
10 years finish, 2 years hardware, 5 years structure
Extended finish cover with PVDF
Spare parts
1 % hinges, gaskets, touch-up paint free
—
Mold fee
$1,800–3,500 per custom pattern
Waived above 50 sets
Packing and container loading
Each set packs as: PE film + 10 mm EPE foam on all edges, corner guards, then a plywood crate (non-fumigation, ISPM-exempt plywood). Crate volume runs 1.1–1.5 m³ per single, 1.8–2.3 m³ per double with sidelights. Weight per packed single is 130–170 kg, double 240–300 kg.
40HQ = 76 m³ usable. At 1.3 m³ per single-crate and stackable double-stacking on floor grids, a mixed load lands at 40–52 singles or 24–30 doubles per container.
Weight is not the binding constraint (26 t payload / 0.17 t ≈ 150 singles), so crate stacking height governs: crates are rated 2-high, plan the load plan on 2-high stacking.
Glass, if glazed sidelights or transoms are included, ships crated vertically with the panels; a 20-set double order with glazing fills a 40HQ to the volume limit.
Hardware and touch-up kits ship in a labeled carton taped to the first crate, not loose inside — request this in writing; it prevents the classic missing-hinge claim.
Installation: Sill Pan, Flashing and Threshold Details
Factory QC sees the same three installation failures in warranty photos every year. All of them are prevented at setup, before the frame goes in. The sequence below follows ASTM E2112 for water-managed installations.
Eight-step installation sequence
1. Verify rough opening: frame outer size + 15–20 mm per side, opening plumb within 3 mm over height. Cast doors will not forgive a twisted opening — the lock throws bind first.
2. Fit sill pan with back dam minimum 25 mm, sloped to the exterior, sealed at the ends.
3. Cut WRB (weather-resistive barrier) in an I-pattern, lap WRB into the sill pan and over the back dam; tape the head flap later.
4. Dry-fit the frame, shim at hinge points first (two per hinge), then at lock points and head center. Never shim mid-span between them.
5. Fasten with 5/16 in lag or M8 structural screws into studs at every shim point, 600 mm maximum spacing on jambs. Cast leaves weigh 100 kg+; drywall-only fixing fails within months.
6. Fill the perimeter gap with low-expansion foam in two passes; over-filled foam bows the jamb and shows as a sticky latch.
7. Install head flashing with end dams, lap over the WRB; leave frame weeps open.
8. Hang leaves, set hinge cam adjustment to 1–2 mm even gap, cycle the multi-point lock ten times, then seal the exterior perimeter with neutral-cure silicone (never acetic on PVDF).
Three failure points from warranty claims
Failure
Symptom at 6–18 months
Prevention
No sill pan / flat threshold bed
Rot at subfloor, water tracking under the jamb, threshold fastener corrosion
Sill pan + back dam is non-negotiable; costs $12 and 10 minutes
Fasteners into sheathing only
Leaf sag 3–6 mm, lock will not throw, hinge screw pull-out
Lag into studs at hinge points; verify with driver torque
A Saudi contractor ordered entry doors for a 36-villa gated community outside Riyadh. The client brief was cast aluminum double leaves, dark bronze, privacy glazing excluded, with thermal comfort for 45 °C ambient and dust sealing.
Scope, configuration and delivered cost
Item
Data
Quantity
36 double doors, 1,500 × 2,400 mm, plus 12 single service doors
Panel build
Cast A356.2-T6 panel 12 mm face, 30 mm PU backing (U 2.1 W/m²K)
Finish
PVDF dark bronze RAL 8014-mat, AAMA 2605, 1,000 h salt spray report attached
Hardware
304 SS butterfly hinges × 3 per leaf, 3-point lock, dust-drop seal
Glass
6 tinted reflective + 12A + 6 tempered, SHGC 0.25
FOB
$1,090 per double, $620 per single → $48,120 total
Ocean + insurance + clearance (Jeddah)
$5,290 total (11 % of FOB)
Duty
Verified 0 % under HS 7610.10 with broker letter
Delivered project cost
$53,410 → $1,484 per double equivalent
The competing local supply quote for an equivalent cast double with PVDF was $2,050 per set delivered ($73,800). The import route saved $20,390, 27.6 %, with a 52-day door-to-site lead time against 28 days local — the schedule gap was absorbed by ordering 90 days before door-frame installation.
Site results after 12 months
Zero corrosion complaints despite dust storms and summer 45 °C; PVDF gloss retention measured at 92 % on the two elevations sampled.
Two hinge adjustments across 48 doors in year one (within the factory allowance); zero lock failures after the torque-verified stud fixing was enforced at install.
Interior surface temperature at the panel: 27–29 °C with 34 °C outdoor night — consistent with the U 2.1 calculation; no air-conditioning leakage complaints at the threshold.
Send the RFQ with the items below filled in and quotes come back comparable within 48 hours; leave them out and every supplier assumes a different base build.
Technical items to specify
Leaf size and handing (left/right, in/out swing), plus rough opening if known.
Construction: cast panel (state pattern or attach drawing) / extruded glazed / steel; panel build with or without thermal break.
Glass build-up per section 3 table, or solid panel.
Finish: PVDF / wood-grain / anodized, with RAL or pattern reference, and the salt spray hours you require evidence for.