Home > Sunroom > Glass Greenhouse Factory in China: Aluminium Frame Loads and FOB Pricing
Glass Greenhouse Factory in China: Aluminium Frame Loads and FOB Pricing
Aluminium-framed glass greenhouse with low-iron double glazing, condensate-channel glazing bars and ridge vent, assembled at the Foshan factory before shipment.
A glass greenhouse is a glazed growing structure whose roof and walls carry horticultural glazing on an aluminium frame sized for snow, wind and its own dead load. Unlike a living-space conservatory, the performance targets are light transmission, condensation control and corrosion resistance against fertiliser and humidity, not occupant comfort. This article documents the load tables, frame alloy and coating data, glazing light transmission figures, heating load calculations, FOB price bands, MOQ, packing, installation sequence and three delivered projects for glass greenhouses built in China.
Glass Greenhouse Design Loads: Snow, Wind and Dead Load
Structure sizing starts with three numbers: dead load from glazing plus frame, snow load from the site’s ground snow value, and wind pressure from the basic wind velocity. European production greenhouses are designed to EN 13031-1, which also fixes the design working life class: Class A 15 years, Class B 10 years, Class C 5 years. A residential glass greenhouse sold to a homeowner should be quoted at Class A, because the same extrusion weight buys a 15-year declaration rather than a 5-year one.
Roof load combination
Roof dead load for a glazed greenhouse roof is 0.16 kN/m²: 4 mm glass contributes 0.10 kN/m² (10 kg/m²), the aluminium glazing bar system 0.05 kN/m², and the gutter and bar accessories 0.01 kN/m². Snow on a pitched roof below 30° carries a shape coefficient of 0.8 under EN 1991-1-3, so a site with 1.0 kN/m² ground snow produces 0.80 kN/m² on the roof. The three cases used below are 0.4, 0.8 and 1.6 kN/m² of snow, giving total roof loads of 0.56, 0.96 and 1.76 kN/m².
Load case
Ground snow sk
Roof snow (μ=0.8)
Total roof load
Typical region
Light
0.5 kN/m²
0.40 kN/m²
0.56 kN/m²
Coastal EU, US South, coastal Australia
Moderate
1.0 kN/m²
0.80 kN/m²
0.96 kN/m²
Northern China, Central Europe, UK
Heavy
2.0 kN/m²
1.60 kN/m²
1.76 kN/m²
Northeast China, Hokkaido, Scandinavia, Canada
Glazing bar sizing, 610 mm pane spacing
The glazing bar is the secondary member. It spans between purlins and its spacing equals the pane width, normally 610 mm. Simply supported, aluminium E = 70,000 MPa, design allowable stress 70 MPa for 6063-T5, deflection limit L/200 so that bar sag does not add bending to the glass.
Section
I (cm⁴)
Mass
Load 0.56 kN/m², L=1.25 m
Load 0.96 kN/m², L=1.25 m
Load 0.96 kN/m², L=1.60 m
Load 1.76 kN/m², L=1.25 m
50×40×2.0
8.8
0.93 kg/m
σ 15.2 / δ 1.8 mm OK
σ 26.0 / δ 3.0 mm OK
σ 42.7 / δ 8.1 mm FAIL
σ 47.8 / δ 5.6 mm OK
60×40×2.0
10.2
1.04 kg/m
σ 13.0 / δ 1.5 mm OK
σ 22.4 / δ 2.6 mm OK
σ 36.6 / δ 7.0 mm OK
σ 41.0 / δ 4.8 mm OK
80×40×2.5
15.9
1.55 kg/m
σ 8.4 / δ 1.0 mm OK
σ 14.4 / δ 1.7 mm OK
σ 23.6 / δ 4.5 mm OK
σ 26.4 / δ 3.1 mm OK
100×50×3.0
37.4
2.33 kg/m
σ 4.5 / δ 0.4 mm OK
σ 7.6 / δ 0.7 mm OK
σ 12.5 / δ 1.9 mm OK
σ 14.0 / δ 1.3 mm OK
Where the FAIL comes from. At 0.96 kN/m² and 1.60 m span, 50×40×2.0 gives δ = 8.1 mm against an L/200 limit of 8.0 mm. It misses by 0.1 mm on deflection while stress is only 42.7 MPa against 70 MPa allowed. Deflection governs glazing bars, not stress. Specify 60×40×2.0 or cut the span to 1.25 m.
Main rafter sizing, 1.2 m spacing, L/180
The main rafter carries the bars and spans between gable posts or a ridge beam. At 1.2 m spacing the line load is 1.202 kN/m under the moderate case. Aluminium rectangular tube sections, simply supported:
Section
I (cm⁴)
W (cm³)
0.56 kN/m², L=3.0 m
0.96 kN/m², L=3.0 m
0.96 kN/m², L=4.0 m
1.76 kN/m², L=3.0 m
100×50×3.0
37.4
15.0
σ 54.2 / δ 29.1 FAIL
σ 90.3 / δ 48.4 FAIL
σ 160.5 / δ 152.9 FAIL
σ 162.4 / δ 87.0 FAIL
120×60×3.0
66.4
22.1
σ 36.7 / δ 16.4 OK
σ 61.1 / δ 27.3 FAIL
σ 108.6 / δ 86.2 FAIL
σ 109.9 / δ 49.1 FAIL
150×75×4.0
171.4
45.7
σ 17.8 / δ 6.3 OK
σ 29.6 / δ 10.6 OK
σ 52.6 / δ 33.4 FAIL
σ 53.2 / δ 19.0 FAIL
200×80×4.0
256.1
64.0
σ 12.7 / δ 4.2 OK
σ 21.1 / δ 7.1 OK
σ 37.5 / δ 22.3 FAIL
σ 38.0 / δ 12.7 OK
Reading the table: 120×60×3.0 is sufficient only in the light snow case. A 3.0 m rafter in the moderate case needs 150×75×4.0, and a 4.0 m rafter in the same case is not achievable with a single rectangular tube — it needs a trussed rafter or an intermediate purlin at mid-span, which halves the effective span to 2.0 m and brings 120×60×3.0 back into range (σ 27.1 MPa, δ 5.4 mm). This is why commercial Venlo houses use a truss every 3.2 to 4.5 m with aluminium roof bars spanning only 1.25 to 1.67 m.
Wind and posts
A 3.0 m post carrying 1.2 m of roof tributary width at 0.96 kN/m² takes 20.7 kN axial. With 0.8 kN/m wind on the 3.0 m post, the base moment is 0.90 kN·m. An 80×80×3.0 post gives 140.5 MPa combined stress, over the 70 MPa allowable, and its slenderness is λ = 95, where buckling reduces axial capacity sharply. 100×100×4.0 gives 70.6 MPa at λ = 76. For posts above 2.5 m, specify 100×100×4.0 or add a knee brace.
Aluminium Greenhouse Frame: Alloy, Temper and Coating Data
An aluminium greenhouse frame lives in the worst corrosion environment a building product normally sees: 80 to 95 percent relative humidity, daily wet-dry cycles, fertiliser salts, and in some operations sulfur or chlorine-based fumigation. Alloy and coating selection is a specification decision, not a cosmetic one.
Alloy and temper
Alloy-temper
Yield strength
Extrudability
Anodizing response
Corrosion behaviour
Where to use
6063-T5
110 MPa
High — thin walls, tight tolerances
Class I, uniform colour
Good; pitting only under chloride deposits
Glazing bars, rafters, gutters, standard frames
6060-T66
150 MPa
High
Class I
Good, similar to 6063
Slimmer sightlines at equal load
6061-T6
240 MPa
Medium
Poor — grey, streaky
Lower; copper content raises pitting risk
Only long-span beams and posts over 4 m
6082-T6
250 MPa
Medium
Fair
Fair
Structural trusses in commercial spans
The default is 6063-T5 with 2.0 mm wall for glazing bars and 2.5 to 3.0 mm for rafters and posts. Moving to 6061-T6 buys strength but costs anodizing quality and corrosion margin, so it is reserved for members whose failure mode is bending rather than surface attack.
Coating system and service life
Finish
Typical thickness
Salt spray (ISO 9227)
UV / chalk resistance
Fertiliser and humidity
Indicative life
Anodizing AA15 + sealing
15 µm
1,000 h+
Stable, no organic binder
Best — oxide is integral to the metal
20–25 yr
Anodizing AA20 + sealing
20 µm
1,500 h+
Stable
Best for heated, high-humidity houses
25–30 yr
Polyester powder (Qualicoat Class 1)
60–80 µm
1,000 h
Chalking from year 8–10
Good if edge coverage is complete
10–15 yr
PVDF (AAMA 2605)
25–30 µm + primer
3,000 h+
Minimal chalk at 15 yr
Good
20–25 yr
For a heated aluminium greenhouse the recommendation is AA20 anodizing on internal members and PVDF or AA20 on external faces. Powder coat is acceptable for cold, unheated houses in mild climates where the humidity load is lower.
Galvanic corrosion and fasteners
Aluminium sits at −0.83 V in the galvanic series. Contact with copper, brass or plain carbon steel in a wet film makes the aluminium the anode and it corrodes.
Use A2-70 or A4-80 stainless fasteners with a nylon or EPDM isolating washer, or specify aluminium rivets for bar-to-purlin joints.
Copper-based fungicides must not be sprayed onto bare aluminium; where copper programmes are used, specify anodized members and rinse schedules.
Cut ends and drill holes break the coating. Every cut end on site must be treated with a chromate-free conversion coating or a zinc-rich touch-up before assembly.
Thermal break is standard on heated structures: a polyamide PA66 GF25 strip 18 to 24 mm wide reduces the frame U-value from 5.9 to 3.2 W/m²K and stops condensation running down the internal face.
Greenhouse Glazing: Glass vs Polycarbonate, Light Transmission and PAR
The glass green house glazing decision is a light decision. Plants respond to photosynthetically active radiation between 400 and 700 nm, and every surface in the optical path removes some of it. The figures below use a December outdoor daily light integral of 11 mol/m²/day at 40° north latitude, a frame shading factor of 0.88 (bars cover 12 percent of the plan area), a dirt factor of 0.92 and a wet-film factor of 0.95.
Measured transmission, not catalogue claims
Glazing
τ glazing (PAR)
τ structure (all losses)
Indoor December DLI
U-value
Comment
4 mm low-iron single
0.90
0.692
7.6 mol/m²/d
5.8 W/m²K
Maximum light, no thermal performance
4-12-4 low-iron double
0.79
0.608
6.7 mol/m²/d
2.7 W/m²K
Standard export specification
4-12-4 standard float double
0.72
0.554
6.1 mol/m²/d
2.7 W/m²K
Iron oxide in float glass costs 8 percent of light
Low-iron glass is not a marketing term in this context. Standard float contains 0.1 percent iron oxide, which absorbs in the red part of the PAR band. Switching from standard float to low-iron adds 7 percentage points of transmission at the double-glazed unit level, and low-iron adds roughly $4 to $6/m² to the glass cost. Against that, replacing 4-12-4 with 16 mm polycarbonate to save $18/m² costs 1.8 mol/m²/day of December light, which is the difference between a crop that overwinterers and one that stalls.
Supplemental lighting arithmetic
Lettuce needs 12 to 17 mol/m²/day; tomato needs 20 to 25. Raising a December DLI of 6.7 to a working 14 mol/m²/day requires 7.3 mol/m²/day from fixtures. At a modern horticultural LED efficacy of 2.8 µmol/J, that is 0.724 kWh/m²/day, or 65.2 kWh/m² over a 90-day winter, about $6.52/m² per season at $0.10/kWh. The same house glazed in 16 mm polycarbonate starts at 4.9 mol and needs 8.5 mol, or 75.9 kWh/m² and $7.59/m² — the polycarbonate saving is consumed by the electricity bill within roughly nine seasons.
Solar-control Low-E does not belong in a production greenhouse. A solar-control coating that cuts g-value to 0.35 also cuts PAR transmission to 0.38–0.60. Keep solar-control coatings for occupancy structures and use low-iron plus diffuse or AR coatings where the crop is the output. See the roof load and g-value discussion in the sunrooms and glass houses article for the occupancy case.
Glass thickness and pane size against wind pressure
Pane stress in a glass green house is computed as σ = β·w·a²/t² for a simply supported rectangular plate, a = short side, β from Timoshenko plate coefficients. Design bending strength: annealed glass 25 MPa, heat-strengthened 40 MPa, tempered (EN 12150) 70 MPa.
Pane
Aspect ratio / β
4 mm at 1.0 kPa
4 mm at 1.6 kPa
4 mm at 2.2 kPa
5 mm at 2.2 kPa
Verdict
500×1000 mm
2.00 / 0.6102
9.5 MPa
15.3 MPa
21.0 MPa
13.4 MPa
Annealed 4 mm adequate
610×1000 mm
1.64 / 0.5172
12.0 MPa
19.2 MPa
26.5 MPa
16.9 MPa
Annealed to 1.6 kPa; tempered above
610×1250 mm
2.05 / 0.6102
14.2 MPa
22.7 MPa
31.2 MPa
20.0 MPa
Tempered from 1.6 kPa
610×1670 mm
2.74 / 0.7134
16.6 MPa
26.5 MPa
36.5 MPa
23.4 MPa
Tempered required
700×1250 mm
1.79 / 0.5688
17.4 MPa
27.9 MPa
38.3 MPa
24.5 MPa
Tempered required
Two rules follow. First, pane width drives stress quadratically: moving from 500 mm to 700 mm width at 4 mm thickness raises stress from 9.5 to 17.4 MPa at the same pressure. Second, above 1.6 kPa design pressure — coastal sites, exposed ridges, Miami-Dade wind zones — 610 mm panes must be tempered or heat-strengthened. Tempered glass also satisfies EN 12600 impact and breaks into blunt fragments, which matters where the greenhouse is attached to a house and used by a family.
Orangerie Greenhouse: Heating Load and Overwintering Data
An orangerie greenhouse is a heated glass structure kept at a setback temperature, traditionally 5 to 10 °C, to overwinter citrus and tender perennials. Its performance metric is the seasonal heating bill, which is dominated by glazing U-value because the glazed area is four to six times the floor area.
Heat loss calculation, 6 × 4 m lean-to
Take a 6 × 4 m lean-to, 24 m² floor, glazed area 56 m², internal setpoint 10 °C, external design −10 °C, ΔT = 20 K, infiltration 0.5 air changes per hour. Envelope loss is U × A × ΔT; infiltration loss is 0.5 × V/3600 × 1.2 × 1.006 × ΔT.
Glazing
U-value
Envelope loss
Infiltration
Total peak load
120-day season
Season cost at $0.12/kWh
Single 4 mm float
5.8 W/m²K
6.50 kW
0.20 kW
6.70 kW
19,288 kWh
$2,315
4-12-4 air fill
2.7 W/m²K
3.02 kW
0.20 kW
3.23 kW
9,289 kWh
$1,115
16 mm PC 3-wall
2.4 W/m²K
2.69 kW
0.20 kW
2.89 kW
8,321 kWh
$999
4-12-4 Low-E argon
1.6 W/m²K
1.79 kW
0.20 kW
1.99 kW
5,740 kWh
$689
Going from single to double glazing saves 10,080 kWh per season, $1,210 at $0.12/kWh. The glazing upgrade costs about $38/m² more on 56 m², or $2,128, so the payback is 1.8 heating seasons. Low-E argon saves a further $426 per season for about $14/m² more, a 1.8-season payback as well. Polycarbonate looks competitive on heat but, as the transmission table shows, it is the wrong choice where winter light is the limiting factor — it is the right choice for an orangerie used only for dormant overwintering.
Setback temperature and crop limits
Setback temperature
Suitable contents
Seasonal cost, 4-12-4
Risk
2 to 4 °C
Hardy alpines, dormant bulbs, tender perennials
$780
Frost pocket at glazing edges
5 to 7 °C
Citrus, olive, bay, camellia, overwintering standard
$1,115
Below 4 °C citrus drops fruit and leaf
10 to 12 °C
Continuous herb and salad production
$1,690
Botrytis risk above 85 percent RH
15 to 18 °C
Tender ornamentals, orchids, propagation
$2,470
Heating cost dominates; needs thermal break frame
Thermal break is not optional above 12 °C setpoint. Without a polyamide break the frame U-value stays at 5.9 W/m²K and condensation forms on the internal frame face, running down onto the floor. A 20 mm PA66 GF25 break reduces frame U-value to 3.2 W/m²K and raises the internal frame surface temperature enough to keep it dry at 70 percent RH.
Condensation, Humidity and Condensate Management
Greenhouse glazing condenses. That is not a defect to be eliminated by specification; it is a condition to be collected and drained. The internal surface temperature is θsi = Ti − (Rsi/Rtotal)·(Ti − To), with Rsi = 0.13 m²K/W.
Surface temperature against dew point
Glazing
U-value
R total
θsi at 20 °C / −5 °C
Dew point at 85 % RH
Result
Single 4 mm
5.8
0.342
10.5 °C
17.4 °C
Condenses
4-12-4 air
2.7
0.540
14.0 °C
17.4 °C
Condenses
4-12-4 Low-E argon
1.6
0.795
15.9 °C
17.4 °C
Condenses
4-12-4-12-4 Low-E
1.1
1.079
17.0 °C
17.4 °C
Condenses marginally
16 mm PC 3-wall
2.4
0.587
14.5 °C
17.4 °C
Condenses
To stay dry at 20 °C and 85 percent RH the internal surface must exceed 17.4 °C, which requires U < 0.8 W/m²K — triple glazing plus thermal break, which no production greenhouse uses because it would cut light below the economic threshold. The engineering response is therefore collection: every glazing bar carries an integral condensate channel of at least 12 cm² cross-section, sloped at 0.5 percent to a gutter, and the gutter discharges outside the foundation line.
Humidity control sequence
Vent first: raising the air change rate from 0.5 to 2 per hour at −5 °C outdoor removes roughly 0.9 kg of water per hour from a 24 m² house at 20 °C / 85 percent RH.
Heat second: every 1 K rise in air temperature at constant moisture content drops relative humidity about 4 to 5 percentage points in the 15 to 25 °C band.
Dehumidify third: a unit sized at 12 to 18 L/day for a 24 m² house holds 70 percent RH for about 0.35 kWh per litre removed.
Keep air moving: 0.2 to 0.3 m/s horizontal airflow across the canopy removes the boundary layer where botrytis establishes. Two circulating fans at 30 W each are typically enough for 24 m².
Glass House Garden Siting, Ventilation and Drainage
A glass house garden structure performs according to where it stands. Siting decisions change the light received by more than any glazing upgrade, and ventilation area changes summer temperature by more than any frame decision.
Orientation and shading check
Factor
Effect on December DLI
Effect on summer peak
Action
Ridge running east–west
Baseline 6.7 mol/m²/d
Baseline
Both roof slopes receive winter sun
Ridge running north–south
−12 to −18 %
Better summer distribution
Only where summer cropping dominates
Deciduous tree within 6 m south
−5 % in winter, −30 % in summer
Reduces overheating
Acceptable; useful shading
Evergreen or wall within 4 m
−35 to −50 %
Raises summer shading
Re-site or raise the ridge above the obstacle
Attached to a heated house wall
n/a
−1.5 to −2.5 kW heat loss
Best winter economics; insulate the shared wall to U 0.3
Natural ventilation sizing by stack effect
Airflow through a ridge and side vent pair is Q = Cd·A·√(2·g·Δh·ΔT/T), with Cd = 0.6. Vent area is sized at 15 percent of floor area, split evenly between ridge and side. The table uses Δh from side vent centre to ridge and ΔT the indoor-outdoor difference.
Floor area
Total vent area
Ridge area
Δh
ΔT
Airflow
Air changes per hour
24 m² (residential)
3.6 m²
1.8 m²
1.6 m
8 K
0.99 m³/s
49.6 /h
100 m² (market garden)
15.0 m²
7.5 m²
1.8 m
8 K
4.38 m³/s
52.6 /h
2,400 m² (Venlo)
360 m²
180 m²
4.5 m
6 K
144.0 m³/s
72.0 /h
The target for summer cooling is 45 to 60 air changes per hour. All three configurations land in or above that band, which means the limiting factor is usually not vent area but the control system: ridge vents must open progressively from 5 °C above setpoint and reach full travel at 10 °C above, driven by a motor with at least 600 N thrust per 3 m of vent.
Rainwater and gutter capacity
Design the gutter for the local 2-minute, 10-year rainfall intensity. At 100 mm/h on a 24 m² footprint the instantaneous flow is 0.67 L/s. A 100 × 75 mm aluminium gutter at 0.5 percent slope carries 1.9 L/s, so capacity is comfortable; the usual failure is the downpipe, where one 63 mm outlet handles 1.2 L/s. Two downpipes per 24 m² house, plus a leaf strainer, are the specification.
FOB Pricing, MOQ, Lead Time and Packing Data
Prices below are FOB Foshan or Shenzhen, in USD, for complete kits — aluminium frame, glazing, gaskets, vents, doors, fixings and assembly documentation. They exclude heating, lighting, benching and irrigation.
Price bands by configuration
Configuration
Frame
Glazing
FOB per m² floor
24 m² example
Typical use
Cold house, single glazed
6063-T5, 2.0 mm, powder coat
4 mm horticultural glass
$96–133
$2,300–3,200
Seasonal home growing, mild climates
Tempered single, coastal
6063-T5, 2.5 mm, AA20
4 mm tempered low-iron
$118–162
$2,830–3,890
Wind-exposed and family gardens
16 mm PC 3-wall
6063-T5, 2.0 mm, powder coat
16 mm polycarbonate
$121–171
$2,900–4,100
Budget overwintering, impact risk
4-12-4 double low-iron
6063-T5 thermal break, 2.5 mm
4-12-4 low-iron, one face tempered
$154–217
$3,700–5,200
Year-round hobby and market garden
Orangerie with insulated base
6063-T5 thermal break, 3.0 mm
4-12-4 Low-E argon
$208–321
$5,000–7,700
Heated overwintering, attached to house
Venlo commercial, ≥3,000 m²
6082-T6 truss, 3.0 mm
4 mm tempered diffuse, AR
$58–92
—
Production horticulture
Commercial terms
Item
Residential kit
Commercial project
MOQ
1 set sample; 5 sets for OEM branding
500 m²; 3,000 m² for Venlo pricing
New extrusion die
$600–1,200 per profile, one-off
Waived above 3,000 m²
Lead time
25–35 days ex-works
40–55 days; +12 days for a new die
Payment
30 % deposit, 70 % before shipment
30 % deposit, 70 % against B/L copy; L/C at sight above $50,000
Packing
A-frame glass crate, 12–16 panes; profiles in PE foam + woven bag, 6 m bundles
Flat-rack or 40HQ, bar-coded bundle list
Container load
30–38 kits of 24 m² per 40HQ (volume-limited, ~18 t)
1,100–1,400 m² of structure per 40HQ
Warranty
10 years frame, 5 years coating
15 years structure to EN 13031-1 Class A
Why the residential kit is volume-limited. A 24 m² kit packs at about 1.8 m³ and weighs 520 kg. Thirty-eight kits fill 68 m³ but only 19.8 t against a 26 t payload, so freight is billed on volume. Consolidating two models into one 40HQ is the single biggest landed-cost lever for distributors.
Standards, Certification and Structural Declaration
Structure and CE marking
EN 13031-1 — design and construction of greenhouses for commercial production. Fixes load assumptions and the design working life classes A (15 yr), B (10 yr), C (5 yr). Ask which class the quote is based on.
EN 1090-1 — CE marking for aluminium structural components, execution class EXC1 for residential and EXC2 for commercial spans. Requires a factory production control certificate and a declaration of performance.
EN 15088 — aluminium and aluminium alloys for structural products, the material qualification behind EN 1090-1.
ISO 9001 / ISO 14001 — quality and environmental management at the extrusion and assembly plant.
Glass, glazing and regional approvals
EN 12150 thermally toughened soda lime glass; EN 1863 heat-strengthened; EN 572 basic float products.
EN 1279 insulating glass units, parts 1 to 6 — required for any 4-12-4 or Low-E sealed unit with a 10-year seal warranty.
EN 12600 pendulum impact classification — 1B1 or better for glazing within reach of children.
Miami-Dade NOA or Florida Product Approval for wind-borne debris regions; requires large-missile impact testing on the glazed assembly, not just the glass.
NFRC / AAMA labels apply to occupancy fenestration rather than greenhouses, but distributors selling into North America often request the thermal simulation report anyway. The same aluminium frame data used for the aluminium window frame specifications specification satisfies that request.
Installation Sequence and Commissioning
Base and anchoring
Pour a 150 mm reinforced slab or a perimeter strip footing 400 mm deep, with a 100 mm upstand so the frame sill sits 100 mm above finished ground level.
Set the sill on a 10 mm EPDM or bituminous damp-proof course; aluminium in direct contact with wet concrete pits within two seasons.
Anchor with M10 stainless sleeve anchors at 600 mm centres, minimum 80 mm embedment. Torque to 25 N·m and re-check after 30 days.
Check the base is level to ±3 mm over the full length. Out-of-level sills are the most common cause of doors that will not latch after the first summer.
Glazing sequence
Dry-assemble the frame without glazing, square the diagonals to ±2 mm, then fix permanently.
Fit glazing bar gaskets dry. EPDM at 60 to 65 Shore A, compression 20 to 25 percent of the nominal section; over-compression buckles the pane.
Set glass on two EPDM setting blocks at the quarter points, never at the ends.
Glaze from the ridge down, so that each pane’s upper edge is captured by the bar above.
Run a continuous silicone bead on the external horizontal bar only. Vertical joints are drained, not sealed; sealing them traps condensate in the channel.
Commissioning checklist
Item
Acceptance criterion
Method
Vent travel
Full open at 10 K above setpoint
Cycle the actuator three times, measure opening angle
Water tightness
No penetration at 8 L/min·m² for 15 min
Irrigation rack test, not a hose
Condensate path
Water reaches the gutter within 60 s
Pour 500 mL into the bar channel at the ridge
Door operation
Opening force below 45 N
Spring balance at the handle
Earth bonding
Frame to earth below 0.5 Ω
Four-point resistance test
Glass stress check
No edge chipping, gasket fully seated
Visual plus 0.2 mm feeler gauge at 200 mm intervals
Delivered Project Data: Three Builds
Case 1 — Residential lean-to, Shandong, 24 m²
Parameter
Value
Structure
6.0 × 4.0 m lean-to, 150×75×4.0 rafters at 1.2 m, 80×40×2.5 bars at 610 mm
Glazing
4-12-4 low-iron, one face tempered, U 2.7 W/m²K, τ 0.79
3.23 kW peak at ΔT 20 K; 9,289 kWh per 120-day season
FOB
$4,180 (24 m², $174/m²)
Result
December DLI 6.7 mol/m²/d; winter salad production without supplemental lighting
Case 2 — Commercial Venlo, Hebei, 2,400 m²
Parameter
Value
Structure
8.0 m span × 5 spans × 60 m; 6082-T6 truss at 4.0 m; roof bars 60×40×2.0 at 1.67 m
Glazing
4 mm tempered diffuse with AR coating, τ 0.93, haze 50 %
Ventilation
360 m² total vent, ridge 180 m², 72 ACH at ΔT 6 K
Heating
Gas hot-water, 180 kW peak, setpoint 16 °C night
FOB
$163,000 ($68/m²), 40HQ × 14
Result
Tomato yield 36.6 kg/m²/yr against 34.0 kg/m² on the grower’s previous standard-float house, +7.6 %
The yield gain came from diffuse scatter rather than from total light: the AR diffuse pane transmits 0.93 against 0.90 for clear low-iron, so total PAR rose only 3 percent, but scattering moved light into the lower canopy where fruiting trusses sit. Growers quoting diffuse glass should be told the realistic band is 4 to 10 percent, not the 20 percent figures that circulate in the market.
Case 3 — Orangerie, Cambridgeshire, 17.5 m²
Parameter
Value
Structure
5.0 × 3.5 m, 120×60×3.0 rafters, 100×100×4.0 posts, insulated 600 mm dwarf wall
Glazing
25 mm PC 5-wall, U 1.6 W/m²K, τ 0.55; 4-12-4 Low-E on the south elevation
Setpoint
8 °C, outdoor design −10 °C, ΔT 18 K
Heating
1.39 kW peak; 4,988 kWh per 150-day season; $1,097 at $0.22/kWh
Alternative priced
Single 4 mm: 4.71 kW, 16,963 kWh, $3,732 per season
FOB
$4,760 ($272/m²), 40HQ consolidated with two other UK orders
Polycarbonate was specified here because the client overwintered dormant citrus and did not grow between November and February, so light was not the limiting factor and impact resistance against garden use was. Where light does matter, the same house in 4-12-4 low-iron costs $3,770 and delivers 6.7 mol/m²/day instead of 4.6.
FAQ
How much does a glass greenhouse cost from a China factory?
FOB $96 to $133/m² of floor area for a single-glazed cold house, $154 to $217/m² for a 4-12-4 double-glazed house, and $208 to $321/m² for a heated orangerie with an insulated base. Commercial Venlo structures above 3,000 m² fall to $58 to $92/m². A 24 m² residential kit therefore lands between $2,300 and $7,700 FOB depending on glazing.
Glass or polycarbonate for a growing greenhouse?
Glass, on light. A 4-12-4 low-iron unit transmits 0.79 of PAR against 0.58 for 16 mm three-wall polycarbonate, which is 6.7 against 4.9 mol/m²/day in December at 40° north. Polycarbonate is the right choice where impact resistance matters or where the structure is dormant over winter and light is not limiting.
What frame size does a 3 m span greenhouse roof need?
At 1.2 m rafter spacing and 0.96 kN/m² roof load, 150×75×4.0 rectangular tube: stress 29.6 MPa against 70 MPa allowed, deflection 10.6 mm against an L/180 limit of 16.7 mm. 120×60×3.0 fails on deflection at 27.3 mm. In the light snow case (0.56 kN/m²) 120×60×3.0 passes at 16.4 mm against 16.7 mm, with almost no margin.
Which standards should a greenhouse quote reference?
EN 13031-1 for the structure, with the design working life class stated; EN 1090-1 with EXC1 or EXC2 for CE marking; EN 12150 for tempered glass and EN 1279 for sealed units; EN 12600 for impact classification; and, for wind-borne debris regions, a Miami-Dade NOA or Florida Product Approval on the glazed assembly.
Can a greenhouse be attached to the house wall?
Yes, and it is the most economical configuration. The shared wall removes 1.5 to 2.5 kW of peak heat loss from a 24 m² house, and the house supplies residual heat. Insulate the shared wall to U 0.3 W/m²K, flash the junction above the roof line, and size the gutter for the combined catchment. For the occupancy version of the same attached structure, see the sun room factory in Foshan and aluminium sunroom roofs specifications; for roof glazing integration, the skylight and roof window systems data applies.