Glass Greenhouse Factory in China: Aluminium Frame Loads and FOB Pricing

Aluminium glass greenhouse with thermally broken frame and tempered double glazing installed on a residential garden in China - ROGENILAN factory-built growing structure
Aluminium-framed glass greenhouse with low-iron double glazing, condensate-channel glazing bars and ridge vent, assembled at the Foshan factory before shipment.
A glass greenhouse is a glazed growing structure whose roof and walls carry horticultural glazing on an aluminium frame sized for snow, wind and its own dead load. Unlike a living-space conservatory, the performance targets are light transmission, condensation control and corrosion resistance against fertiliser and humidity, not occupant comfort. This article documents the load tables, frame alloy and coating data, glazing light transmission figures, heating load calculations, FOB price bands, MOQ, packing, installation sequence and three delivered projects for glass greenhouses built in China.
FOB price
$96–320/m²
Roof U-value
1.6–5.8 W/m²K
Frame wall
2.0–3.0 mm
MOQ
1 kit / 500 m²
Lead time
25–35 days
Contents

Glass Greenhouse Design Loads: Snow, Wind and Dead Load

Structure sizing starts with three numbers: dead load from glazing plus frame, snow load from the site’s ground snow value, and wind pressure from the basic wind velocity. European production greenhouses are designed to EN 13031-1, which also fixes the design working life class: Class A 15 years, Class B 10 years, Class C 5 years. A residential glass greenhouse sold to a homeowner should be quoted at Class A, because the same extrusion weight buys a 15-year declaration rather than a 5-year one.

Roof load combination

Roof dead load for a glazed greenhouse roof is 0.16 kN/m²: 4 mm glass contributes 0.10 kN/m² (10 kg/m²), the aluminium glazing bar system 0.05 kN/m², and the gutter and bar accessories 0.01 kN/m². Snow on a pitched roof below 30° carries a shape coefficient of 0.8 under EN 1991-1-3, so a site with 1.0 kN/m² ground snow produces 0.80 kN/m² on the roof. The three cases used below are 0.4, 0.8 and 1.6 kN/m² of snow, giving total roof loads of 0.56, 0.96 and 1.76 kN/m².

Load case Ground snow sk Roof snow (μ=0.8) Total roof load Typical region
Light 0.5 kN/m² 0.40 kN/m² 0.56 kN/m² Coastal EU, US South, coastal Australia
Moderate 1.0 kN/m² 0.80 kN/m² 0.96 kN/m² Northern China, Central Europe, UK
Heavy 2.0 kN/m² 1.60 kN/m² 1.76 kN/m² Northeast China, Hokkaido, Scandinavia, Canada

Glazing bar sizing, 610 mm pane spacing

The glazing bar is the secondary member. It spans between purlins and its spacing equals the pane width, normally 610 mm. Simply supported, aluminium E = 70,000 MPa, design allowable stress 70 MPa for 6063-T5, deflection limit L/200 so that bar sag does not add bending to the glass.

Section I (cm⁴) Mass Load 0.56 kN/m², L=1.25 m Load 0.96 kN/m², L=1.25 m Load 0.96 kN/m², L=1.60 m Load 1.76 kN/m², L=1.25 m
50×40×2.0 8.8 0.93 kg/m σ 15.2 / δ 1.8 mm OK σ 26.0 / δ 3.0 mm OK σ 42.7 / δ 8.1 mm FAIL σ 47.8 / δ 5.6 mm OK
60×40×2.0 10.2 1.04 kg/m σ 13.0 / δ 1.5 mm OK σ 22.4 / δ 2.6 mm OK σ 36.6 / δ 7.0 mm OK σ 41.0 / δ 4.8 mm OK
80×40×2.5 15.9 1.55 kg/m σ 8.4 / δ 1.0 mm OK σ 14.4 / δ 1.7 mm OK σ 23.6 / δ 4.5 mm OK σ 26.4 / δ 3.1 mm OK
100×50×3.0 37.4 2.33 kg/m σ 4.5 / δ 0.4 mm OK σ 7.6 / δ 0.7 mm OK σ 12.5 / δ 1.9 mm OK σ 14.0 / δ 1.3 mm OK
Where the FAIL comes from. At 0.96 kN/m² and 1.60 m span, 50×40×2.0 gives δ = 8.1 mm against an L/200 limit of 8.0 mm. It misses by 0.1 mm on deflection while stress is only 42.7 MPa against 70 MPa allowed. Deflection governs glazing bars, not stress. Specify 60×40×2.0 or cut the span to 1.25 m.

Main rafter sizing, 1.2 m spacing, L/180

The main rafter carries the bars and spans between gable posts or a ridge beam. At 1.2 m spacing the line load is 1.202 kN/m under the moderate case. Aluminium rectangular tube sections, simply supported:

Section I (cm⁴) W (cm³) 0.56 kN/m², L=3.0 m 0.96 kN/m², L=3.0 m 0.96 kN/m², L=4.0 m 1.76 kN/m², L=3.0 m
100×50×3.0 37.4 15.0 σ 54.2 / δ 29.1 FAIL σ 90.3 / δ 48.4 FAIL σ 160.5 / δ 152.9 FAIL σ 162.4 / δ 87.0 FAIL
120×60×3.0 66.4 22.1 σ 36.7 / δ 16.4 OK σ 61.1 / δ 27.3 FAIL σ 108.6 / δ 86.2 FAIL σ 109.9 / δ 49.1 FAIL
150×75×4.0 171.4 45.7 σ 17.8 / δ 6.3 OK σ 29.6 / δ 10.6 OK σ 52.6 / δ 33.4 FAIL σ 53.2 / δ 19.0 FAIL
200×80×4.0 256.1 64.0 σ 12.7 / δ 4.2 OK σ 21.1 / δ 7.1 OK σ 37.5 / δ 22.3 FAIL σ 38.0 / δ 12.7 OK

Reading the table: 120×60×3.0 is sufficient only in the light snow case. A 3.0 m rafter in the moderate case needs 150×75×4.0, and a 4.0 m rafter in the same case is not achievable with a single rectangular tube — it needs a trussed rafter or an intermediate purlin at mid-span, which halves the effective span to 2.0 m and brings 120×60×3.0 back into range (σ 27.1 MPa, δ 5.4 mm). This is why commercial Venlo houses use a truss every 3.2 to 4.5 m with aluminium roof bars spanning only 1.25 to 1.67 m.

Wind and posts

A 3.0 m post carrying 1.2 m of roof tributary width at 0.96 kN/m² takes 20.7 kN axial. With 0.8 kN/m wind on the 3.0 m post, the base moment is 0.90 kN·m. An 80×80×3.0 post gives 140.5 MPa combined stress, over the 70 MPa allowable, and its slenderness is λ = 95, where buckling reduces axial capacity sharply. 100×100×4.0 gives 70.6 MPa at λ = 76. For posts above 2.5 m, specify 100×100×4.0 or add a knee brace.

Aluminium Greenhouse Frame: Alloy, Temper and Coating Data

An aluminium greenhouse frame lives in the worst corrosion environment a building product normally sees: 80 to 95 percent relative humidity, daily wet-dry cycles, fertiliser salts, and in some operations sulfur or chlorine-based fumigation. Alloy and coating selection is a specification decision, not a cosmetic one.

Alloy and temper

Alloy-temper Yield strength Extrudability Anodizing response Corrosion behaviour Where to use
6063-T5 110 MPa High — thin walls, tight tolerances Class I, uniform colour Good; pitting only under chloride deposits Glazing bars, rafters, gutters, standard frames
6060-T66 150 MPa High Class I Good, similar to 6063 Slimmer sightlines at equal load
6061-T6 240 MPa Medium Poor — grey, streaky Lower; copper content raises pitting risk Only long-span beams and posts over 4 m
6082-T6 250 MPa Medium Fair Fair Structural trusses in commercial spans

The default is 6063-T5 with 2.0 mm wall for glazing bars and 2.5 to 3.0 mm for rafters and posts. Moving to 6061-T6 buys strength but costs anodizing quality and corrosion margin, so it is reserved for members whose failure mode is bending rather than surface attack.

Coating system and service life

Finish Typical thickness Salt spray (ISO 9227) UV / chalk resistance Fertiliser and humidity Indicative life
Anodizing AA15 + sealing 15 µm 1,000 h+ Stable, no organic binder Best — oxide is integral to the metal 20–25 yr
Anodizing AA20 + sealing 20 µm 1,500 h+ Stable Best for heated, high-humidity houses 25–30 yr
Polyester powder (Qualicoat Class 1) 60–80 µm 1,000 h Chalking from year 8–10 Good if edge coverage is complete 10–15 yr
PVDF (AAMA 2605) 25–30 µm + primer 3,000 h+ Minimal chalk at 15 yr Good 20–25 yr

For a heated aluminium greenhouse the recommendation is AA20 anodizing on internal members and PVDF or AA20 on external faces. Powder coat is acceptable for cold, unheated houses in mild climates where the humidity load is lower.

Galvanic corrosion and fasteners

Greenhouse Glazing: Glass vs Polycarbonate, Light Transmission and PAR

The glass green house glazing decision is a light decision. Plants respond to photosynthetically active radiation between 400 and 700 nm, and every surface in the optical path removes some of it. The figures below use a December outdoor daily light integral of 11 mol/m²/day at 40° north latitude, a frame shading factor of 0.88 (bars cover 12 percent of the plan area), a dirt factor of 0.92 and a wet-film factor of 0.95.

Measured transmission, not catalogue claims

Glazing τ glazing (PAR) τ structure (all losses) Indoor December DLI U-value Comment
4 mm low-iron single 0.90 0.692 7.6 mol/m²/d 5.8 W/m²K Maximum light, no thermal performance
4-12-4 low-iron double 0.79 0.608 6.7 mol/m²/d 2.7 W/m²K Standard export specification
4-12-4 standard float double 0.72 0.554 6.1 mol/m²/d 2.7 W/m²K Iron oxide in float glass costs 8 percent of light
16 mm PC 3-wall 0.58 0.446 4.9 mol/m²/d 2.4 W/m²K Cheap and tough, but 27 percent less light
4 mm diffuse + AR coating 0.93 0.715 7.9 mol/m²/d 5.8 W/m²K Highest light; diffuse scatter improves canopy penetration

Low-iron glass is not a marketing term in this context. Standard float contains 0.1 percent iron oxide, which absorbs in the red part of the PAR band. Switching from standard float to low-iron adds 7 percentage points of transmission at the double-glazed unit level, and low-iron adds roughly $4 to $6/m² to the glass cost. Against that, replacing 4-12-4 with 16 mm polycarbonate to save $18/m² costs 1.8 mol/m²/day of December light, which is the difference between a crop that overwinterers and one that stalls.

Supplemental lighting arithmetic

Lettuce needs 12 to 17 mol/m²/day; tomato needs 20 to 25. Raising a December DLI of 6.7 to a working 14 mol/m²/day requires 7.3 mol/m²/day from fixtures. At a modern horticultural LED efficacy of 2.8 µmol/J, that is 0.724 kWh/m²/day, or 65.2 kWh/m² over a 90-day winter, about $6.52/m² per season at $0.10/kWh. The same house glazed in 16 mm polycarbonate starts at 4.9 mol and needs 8.5 mol, or 75.9 kWh/m² and $7.59/m² — the polycarbonate saving is consumed by the electricity bill within roughly nine seasons.

Solar-control Low-E does not belong in a production greenhouse. A solar-control coating that cuts g-value to 0.35 also cuts PAR transmission to 0.38–0.60. Keep solar-control coatings for occupancy structures and use low-iron plus diffuse or AR coatings where the crop is the output. See the roof load and g-value discussion in the sunrooms and glass houses article for the occupancy case.

Glass thickness and pane size against wind pressure

Pane stress in a glass green house is computed as σ = β·w·a²/t² for a simply supported rectangular plate, a = short side, β from Timoshenko plate coefficients. Design bending strength: annealed glass 25 MPa, heat-strengthened 40 MPa, tempered (EN 12150) 70 MPa.

Pane Aspect ratio / β 4 mm at 1.0 kPa 4 mm at 1.6 kPa 4 mm at 2.2 kPa 5 mm at 2.2 kPa Verdict
500×1000 mm 2.00 / 0.6102 9.5 MPa 15.3 MPa 21.0 MPa 13.4 MPa Annealed 4 mm adequate
610×1000 mm 1.64 / 0.5172 12.0 MPa 19.2 MPa 26.5 MPa 16.9 MPa Annealed to 1.6 kPa; tempered above
610×1250 mm 2.05 / 0.6102 14.2 MPa 22.7 MPa 31.2 MPa 20.0 MPa Tempered from 1.6 kPa
610×1670 mm 2.74 / 0.7134 16.6 MPa 26.5 MPa 36.5 MPa 23.4 MPa Tempered required
700×1250 mm 1.79 / 0.5688 17.4 MPa 27.9 MPa 38.3 MPa 24.5 MPa Tempered required

Two rules follow. First, pane width drives stress quadratically: moving from 500 mm to 700 mm width at 4 mm thickness raises stress from 9.5 to 17.4 MPa at the same pressure. Second, above 1.6 kPa design pressure — coastal sites, exposed ridges, Miami-Dade wind zones — 610 mm panes must be tempered or heat-strengthened. Tempered glass also satisfies EN 12600 impact and breaks into blunt fragments, which matters where the greenhouse is attached to a house and used by a family.

Orangerie Greenhouse: Heating Load and Overwintering Data

An orangerie greenhouse is a heated glass structure kept at a setback temperature, traditionally 5 to 10 °C, to overwinter citrus and tender perennials. Its performance metric is the seasonal heating bill, which is dominated by glazing U-value because the glazed area is four to six times the floor area.

Heat loss calculation, 6 × 4 m lean-to

Take a 6 × 4 m lean-to, 24 m² floor, glazed area 56 m², internal setpoint 10 °C, external design −10 °C, ΔT = 20 K, infiltration 0.5 air changes per hour. Envelope loss is U × A × ΔT; infiltration loss is 0.5 × V/3600 × 1.2 × 1.006 × ΔT.

Glazing U-value Envelope loss Infiltration Total peak load 120-day season Season cost at $0.12/kWh
Single 4 mm float 5.8 W/m²K 6.50 kW 0.20 kW 6.70 kW 19,288 kWh $2,315
4-12-4 air fill 2.7 W/m²K 3.02 kW 0.20 kW 3.23 kW 9,289 kWh $1,115
16 mm PC 3-wall 2.4 W/m²K 2.69 kW 0.20 kW 2.89 kW 8,321 kWh $999
4-12-4 Low-E argon 1.6 W/m²K 1.79 kW 0.20 kW 1.99 kW 5,740 kWh $689

Going from single to double glazing saves 10,080 kWh per season, $1,210 at $0.12/kWh. The glazing upgrade costs about $38/m² more on 56 m², or $2,128, so the payback is 1.8 heating seasons. Low-E argon saves a further $426 per season for about $14/m² more, a 1.8-season payback as well. Polycarbonate looks competitive on heat but, as the transmission table shows, it is the wrong choice where winter light is the limiting factor — it is the right choice for an orangerie used only for dormant overwintering.

Setback temperature and crop limits

Setback temperature Suitable contents Seasonal cost, 4-12-4 Risk
2 to 4 °C Hardy alpines, dormant bulbs, tender perennials $780 Frost pocket at glazing edges
5 to 7 °C Citrus, olive, bay, camellia, overwintering standard $1,115 Below 4 °C citrus drops fruit and leaf
10 to 12 °C Continuous herb and salad production $1,690 Botrytis risk above 85 percent RH
15 to 18 °C Tender ornamentals, orchids, propagation $2,470 Heating cost dominates; needs thermal break frame
Thermal break is not optional above 12 °C setpoint. Without a polyamide break the frame U-value stays at 5.9 W/m²K and condensation forms on the internal frame face, running down onto the floor. A 20 mm PA66 GF25 break reduces frame U-value to 3.2 W/m²K and raises the internal frame surface temperature enough to keep it dry at 70 percent RH.

Condensation, Humidity and Condensate Management

Greenhouse glazing condenses. That is not a defect to be eliminated by specification; it is a condition to be collected and drained. The internal surface temperature is θsi = Ti − (Rsi/Rtotal)·(Ti − To), with Rsi = 0.13 m²K/W.

Surface temperature against dew point

Glazing U-value R total θsi at 20 °C / −5 °C Dew point at 85 % RH Result
Single 4 mm 5.8 0.342 10.5 °C 17.4 °C Condenses
4-12-4 air 2.7 0.540 14.0 °C 17.4 °C Condenses
4-12-4 Low-E argon 1.6 0.795 15.9 °C 17.4 °C Condenses
4-12-4-12-4 Low-E 1.1 1.079 17.0 °C 17.4 °C Condenses marginally
16 mm PC 3-wall 2.4 0.587 14.5 °C 17.4 °C Condenses

To stay dry at 20 °C and 85 percent RH the internal surface must exceed 17.4 °C, which requires U < 0.8 W/m²K — triple glazing plus thermal break, which no production greenhouse uses because it would cut light below the economic threshold. The engineering response is therefore collection: every glazing bar carries an integral condensate channel of at least 12 cm² cross-section, sloped at 0.5 percent to a gutter, and the gutter discharges outside the foundation line.

Humidity control sequence

Glass House Garden Siting, Ventilation and Drainage

A glass house garden structure performs according to where it stands. Siting decisions change the light received by more than any glazing upgrade, and ventilation area changes summer temperature by more than any frame decision.

Orientation and shading check

Factor Effect on December DLI Effect on summer peak Action
Ridge running east–west Baseline 6.7 mol/m²/d Baseline Both roof slopes receive winter sun
Ridge running north–south −12 to −18 % Better summer distribution Only where summer cropping dominates
Deciduous tree within 6 m south −5 % in winter, −30 % in summer Reduces overheating Acceptable; useful shading
Evergreen or wall within 4 m −35 to −50 % Raises summer shading Re-site or raise the ridge above the obstacle
Attached to a heated house wall n/a −1.5 to −2.5 kW heat loss Best winter economics; insulate the shared wall to U 0.3

Natural ventilation sizing by stack effect

Airflow through a ridge and side vent pair is Q = Cd·A·√(2·g·Δh·ΔT/T), with Cd = 0.6. Vent area is sized at 15 percent of floor area, split evenly between ridge and side. The table uses Δh from side vent centre to ridge and ΔT the indoor-outdoor difference.

Floor area Total vent area Ridge area Δh ΔT Airflow Air changes per hour
24 m² (residential) 3.6 m² 1.8 m² 1.6 m 8 K 0.99 m³/s 49.6 /h
100 m² (market garden) 15.0 m² 7.5 m² 1.8 m 8 K 4.38 m³/s 52.6 /h
2,400 m² (Venlo) 360 m² 180 m² 4.5 m 6 K 144.0 m³/s 72.0 /h

The target for summer cooling is 45 to 60 air changes per hour. All three configurations land in or above that band, which means the limiting factor is usually not vent area but the control system: ridge vents must open progressively from 5 °C above setpoint and reach full travel at 10 °C above, driven by a motor with at least 600 N thrust per 3 m of vent.

Rainwater and gutter capacity

Design the gutter for the local 2-minute, 10-year rainfall intensity. At 100 mm/h on a 24 m² footprint the instantaneous flow is 0.67 L/s. A 100 × 75 mm aluminium gutter at 0.5 percent slope carries 1.9 L/s, so capacity is comfortable; the usual failure is the downpipe, where one 63 mm outlet handles 1.2 L/s. Two downpipes per 24 m² house, plus a leaf strainer, are the specification.

FOB Pricing, MOQ, Lead Time and Packing Data

Prices below are FOB Foshan or Shenzhen, in USD, for complete kits — aluminium frame, glazing, gaskets, vents, doors, fixings and assembly documentation. They exclude heating, lighting, benching and irrigation.

Price bands by configuration

Configuration Frame Glazing FOB per m² floor 24 m² example Typical use
Cold house, single glazed 6063-T5, 2.0 mm, powder coat 4 mm horticultural glass $96–133 $2,300–3,200 Seasonal home growing, mild climates
Tempered single, coastal 6063-T5, 2.5 mm, AA20 4 mm tempered low-iron $118–162 $2,830–3,890 Wind-exposed and family gardens
16 mm PC 3-wall 6063-T5, 2.0 mm, powder coat 16 mm polycarbonate $121–171 $2,900–4,100 Budget overwintering, impact risk
4-12-4 double low-iron 6063-T5 thermal break, 2.5 mm 4-12-4 low-iron, one face tempered $154–217 $3,700–5,200 Year-round hobby and market garden
Orangerie with insulated base 6063-T5 thermal break, 3.0 mm 4-12-4 Low-E argon $208–321 $5,000–7,700 Heated overwintering, attached to house
Venlo commercial, ≥3,000 m² 6082-T6 truss, 3.0 mm 4 mm tempered diffuse, AR $58–92 — Production horticulture

Commercial terms

Item Residential kit Commercial project
MOQ 1 set sample; 5 sets for OEM branding 500 m²; 3,000 m² for Venlo pricing
New extrusion die $600–1,200 per profile, one-off Waived above 3,000 m²
Lead time 25–35 days ex-works 40–55 days; +12 days for a new die
Payment 30 % deposit, 70 % before shipment 30 % deposit, 70 % against B/L copy; L/C at sight above $50,000
Packing A-frame glass crate, 12–16 panes; profiles in PE foam + woven bag, 6 m bundles Flat-rack or 40HQ, bar-coded bundle list
Container load 30–38 kits of 24 m² per 40HQ (volume-limited, ~18 t) 1,100–1,400 m² of structure per 40HQ
Warranty 10 years frame, 5 years coating 15 years structure to EN 13031-1 Class A
Why the residential kit is volume-limited. A 24 m² kit packs at about 1.8 m³ and weighs 520 kg. Thirty-eight kits fill 68 m³ but only 19.8 t against a 26 t payload, so freight is billed on volume. Consolidating two models into one 40HQ is the single biggest landed-cost lever for distributors.

Standards, Certification and Structural Declaration

Structure and CE marking