Blog

Home   >   Sunroom   >   Sunrooms & Glass Houses Manufacturer in China: Roof Load, g-Value, Ventilation

Sunrooms & Glass Houses Manufacturer in China: Roof Load, g-Value, Ventilation

Aluminum glass sunroom and glass house in China - thermally broken frame with insulated glazed roof panels
Thermally broken aluminium sunroom with insulated laminated glazed roof panels, factory-assembled in Foshan, China.
A sunroom is a glazed structure attached to or freestanding near a dwelling, built for seasonal or year-round occupation; a glass house in the export trade covers the same aluminium-framed glazed envelope in its fully glazed form. This article documents the classification, roof load calculations, g-value and solar control data, ventilation sizing, profile specifications, glazing build-ups, USD price tables, certifications, procurement terms, installation method, and delivered project data for sunrooms & glass houses manufactured in China, with configuration comparisons throughout.
FOB price
$95-640/m²
Envelope U
1.2-3.6 W/m²K
Roof rafter
120×60×3 / 6063-T6
g-value
0.36-0.72
MOQ
30 m² / 200 m²
Lead time
32-42 days
Contents
1. Sunrooms vs Glass Houses vs Greenhouses
2. Glazed Roof Loads
3. g-Value and SHGC
4. Ventilation and Overheating
5. Glass Greenhouse Builds
6. Conservatory Packages
7. Aluminium Profile Specs
8. Roof and Wall Glazing
9. FOB Pricing Tables
10. Procurement Data
11. Certifications
12. Installation and Waterproofing
13. Delivered Project Data
14. Material Comparison
15. Specification Failures
16. Related Products

Sunrooms, Glass Houses, Conservatories and Glass Greenhouses: What Each Term Commits You To

Buyers use the words sunroom, glass house, conservatory and glass greenhouse interchangeably in enquiries. On a Chinese factory order sheet they are four different products, with four different glazing ratios, four different heating assumptions and four different price bands. Getting the classification wrong at enquiry stage is the single most expensive mistake in this category, because it is discovered after the profiles have been extruded.

The Three-Variable Test: Occupancy, Heating, Glazing Ratio

Rather than argue about vocabulary, specifiers can separate the four types on three measurable variables. The first is occupancy class — is the space a habitable room (a room people sit in, with furniture and a floor finish) or a growing structure (a room plants live in, with benches, irrigation and 70-95% relative humidity)? The second is heating setpoint — 20-22°C year-round, seasonal 12-18°C, or frost-free only at 4-6°C. The third is glazing ratio, the share of the envelope that is transparent: 45-60% for a conservatory with dwarf walls, 75-90% for a glass room, 95-100% for a greenhouse.

Once those three numbers are on paper, the correct product follows mechanically. A 100% glazing ratio with a 20°C setpoint is physically possible but thermally indefensible — the heating load will exceed 250 W/m² of floor area in a temperate winter, which is roughly three times what a residential room uses. That is why the practical pairings in the table below cluster the way they do.

Type Glazing ratio Setpoint Uw target (W/m²K) Code path FOB USD/m² floor
Glass greenhouse 95-100% Frost-free 4-6°C / seasonal Not regulated Agricultural structure $90-170
Glass room / sunroom (3-season) 80-90% 12-18°C seasonal 2.0-2.6 Exempt or light structure $165-260
4-season sunroom 70-85% 20-22°C year-round 1.4-1.8 EN 14351-1 / IECC $285-395
Conservatory / orangerie 45-60% 18-22°C 1.3-1.7 Part L / EnEV-GEG $450-640

The Cost of Misclassification

A 24 m² lean-to quoted as a 3-season glass room and then used as a 4-season habitable space produces a heating load of roughly 4.4 kW at a -5°C design temperature, against 1.7 kW for a correctly specified envelope. The retrofit is not a matter of changing glass: the wall profiles will have a 14.8 mm thermal break where a 24-30 mm break was needed, the roof rafters will have no condensation channel, and the slab will have no perimeter insulation. Total rebuild cost typically lands at 85-110% of the original kit value.

Budget rule: decide occupancy class before you request a quotation. Changing glazing specification later costs $18-85 per m²; changing the structural depth of the profile system later means a new extrusion die ($1,800-4,500) and 12-18 days of lead time.

Outdoor Glass Rooms: The Sun Room Glass House Outdoor Case

The enquiry phrase sun room glass house outdoor usually describes a freestanding structure in a garden: not attached to the dwelling, no shared wall, four exposed elevations. That changes three things relative to a lean-to. Wind exposure rises from sheltered to open country (basic velocity pressure roughly 1.3-1.6× the sheltered value), the structure has no thermal buffer from the house, and the base has to be a full slab or a ring beam on pad foundations rather than a strip footing against an existing wall.

Practically, freestanding units are built with a 120×60×3 mm perimeter ring beam, M12 cast-in anchors at 900 mm centres, and a 150 mm reinforced slab with 100 mm XPS perimeter upstand. Freight also changes: a freestanding kit has roughly 1.35× the profile length of a comparable lean-to, which raises the FOB figure by 12-18% per m² even though the glass area is nearly identical.

Glazed Roof Loads: Snow, Wind Uplift and Self-Weight on a Glass House

A glass roof is a structural element that happens to be transparent. The failure mode in the field is rarely breakage — it is deflection. A rafter that sags 20 mm over a 2.4 m span will not collapse, but it will load the insulating glass unit in bending, and IGUs tolerate very little of that before the edge seal starts to leak.

The Three Load Cases and Their Usual Magnitudes

Take a representative module: rafter span 2.4 m, rafter spacing 0.9 m, dead 0.42 kN/m² plus snow 1.00 kN/m². Line load w = 1.42 × 0.9 = 1.28 kN/m. Bending moment M = wL²/8 = 0.92 kN·m.

Rafter Sizing: Why 100×50×3 Fails and 120×60×3 Passes

6063-T6 extrusion has a characteristic yield of 170 MPa. With a partial factor of 1.65 the allowable stress is about 103 MPa. Both candidate sections clear the stress check easily — the governing criterion is stiffness, not strength.

Section (6063-T6) Ix (mm⁴) Wx (mm³) Stress (MPa) δ mid-span (mm) Span ratio Verdict
100×50×3 3.74×10⁵ 14,976 61.5 21.1 L/114 Fails
120×60×3 6.64×10⁵ 22,136 41.6 11.9 L/202 Passes L/180
150×75×4 1.71×10⁶ 45,718 20.2 4.6 L/521 Over-spec

The 100×50×3 rafter is at 61.5 MPa — 60% of allowable — and still unusable. Anyone sizing a glazed roof on stress alone will specify a section that sags L/114. Note also that 120×60×3 at L/202 clears the common L/180 limit but would fail a specification written as L/200, which is why the limit has to be stated in the enquiry, not assumed.

Uplift: Where the Fixing, Not the Glass, Governs

Net uplift on a 20 m² glazed roof at -1.2 kN/m² wind minus 0.42 kN/m² dead is 0.78 × 20 = 15.6 kN. That load is carried entirely by the fixings into the wall plate or slab, because the roof weighs less than the wind trying to remove it. Six M10 chemical anchors in C25/30 concrete at 100 mm embedment give roughly 12-14 kN allowable tension each, or 75-84 kN total — a utilisation of about 20%, which is the correct order of magnitude once you account for edge distance and cracked-concrete reduction factors.

The glass itself is retained against uplift by pressure plates or structural silicone, not by gravity. For roof glazing, specify a continuous mechanically fixed pressure plate system with a captive gasket; a heel-bead-only silicone installation has no defined uplift resistance and is not accepted by most European notified bodies.

g-Value and SHGC: Solar Control Data for Sunrooms & Glass Houses

Every enquiry for a glass room eventually turns into the same argument: the client wants maximum daylight and a low heating bill, and those two pull in opposite directions. The number that resolves it is the g-value (EN 410) — total solar energy transmittance — called SHGC in the NFRC system. U-value tells you what happens at night; g-value tells you what happens at 14:00 in July.

The Trade Nobody Puts on the Quotation

A clear double-glazed unit has a g-value of about 0.72 and a light transmittance of 0.79. Aggressive solar-control coatings will take g down to 0.30-0.36, but light transmittance falls to 0.48-0.60 and the glass visibly tints. The selectivity index (LT/g) is the honest way to compare: 0.79/0.72 = 1.10 for clear glass, 0.60/0.36 = 1.67 for a modern selective coating. A coating with a selectivity index above 1.4 is worth the surcharge; below 1.25 you are buying darkness, not control.

Glazing Options and the Resulting Numbers

Build-up Ug (W/m²K) g-value LT Selectivity LT/g USD/m² glass
6 + 12A + 6 clear 2.8 0.72 0.79 1.10 $28-38
6 + 12Ar + 6 Low-E (ε=0.04) 1.1 0.61 0.74 1.21 $36-48
6 + 12Ar + 6 solar-control selective 1.0 0.36 0.60 1.67 $48-64
4 + 16Ar + 4 + 16Ar + 4 triple Low-E 0.6 0.52 0.68 1.31 $78-104
Roof: 6 + 1.52 PVB + 6 laminated, solar interlayer 5.4 0.52 0.55 1.06 $62-86
Roof: 6 + 12Ar + 6.38 laminated Low-E 1.2 0.38 0.58 1.53 $88-118

Note the roof rows. A single laminated roof pane has a Ug of 5.4 W/m²K — worse than single glazing in a wall, because it is horizontal and warm air sits against it. Where the space is heated, the roof must be an insulating unit with a laminated inner pane, not a single pane. Where the space is a growing structure, the 5.4 figure is irrelevant, which is exactly the classification point from the first section.

Sensitivity: What One g-Value Step Is Worth

Solar gain is linear in g: Q = A × g × I. Using a 32 m² glazed area facing the equator and a design irradiance of 700 W/m², clear glass gives 32 × 0.72 × 700 = 16.1 kW of instantaneous gain. Moving to a 0.36 coating cuts that to 8.1 kW — a 8.0 kW reduction for a glass surcharge of $640-830 on a 32 m² project. Mechanical cooling to remove 8 kW of gain costs roughly $2,400-3,600 in equipment and 3,000-4,500 kWh per season. The coating pays for itself inside one cooling season in any climate with a design temperature above 30°C.

Ventilation Rate and Overheating Control in a Glass Room

The persistent myth in this category is that a glass room overheats because it is under-ventilated, and that more opening area solves it. The arithmetic says otherwise, and this is worth showing before a client spends money on motorised vents they do not need.

Stack Effect: What You Can Actually Move

Driving pressure difference Δp = g · h · (ρout − ρin). With a 2.5 m stack height and an 8 K indoor-outdoor difference (ρ = 1.197 and 1.165 kg/m³), Δp = 9.81 × 2.5 × 0.032 = 0.78 Pa. Theoretical velocity v = √(2Δp/ρ) = 1.16 m/s; after discharge and inlet losses, the realistic figure is 0.55-0.70 m/s. With 1.5 m² of low-level inlet and 1.5 m² of ridge outlet, the effective area is A = 1.5/√2 = 1.06 m², giving roughly 0.7 m³/s.

That airflow removes Q = ρcV̇ΔT = 1.2 × 1005 × 0.7 × 5 = 4.2 kW at a 5 K indoor-outdoor differential. Set that against the 16.1 kW of clear-glass solar gain and the conclusion is unavoidable: ventilation cannot fix a clear-glazed sunroom. It is off by a factor of nearly four.

The Three-Lever Sequence

  1. Lever 1 — reduce g-value: 16.1 kW → 8.1 kW. Cost $20-26/m² of glass.
  2. Lever 2 — external shading (fixed louvre or motorised roof blind, shading coefficient 0.55): 8.1 → 4.5 kW. Cost $95-160/m² of roof area.
  3. Lever 3 — ventilation: removes 4.2 kW at ΔT = 5 K. Now roughly in balance.

Applied in that order the three levers cost about $4,300-6,100 on a 32 m² room and bring peak temperature within 4-6 K of ambient. Applied in reverse — vents first, glass last — the same budget produces a room that is still 12-15 K above ambient at peak, because the ventilation lever is capped by physics while the g-value lever is not.

Openable Area by Floor Area

Floor area Habitable sunroom — openable area Growing structure — openable area Suggested configuration
12 m² 0.7-1.2 m² 1.8-2.4 m² 2 casements + 1 ridge vent
20 m² 1.2-2.0 m² 3.0-4.0 m² 3 casements + 2 ridge vents
32 m² 1.9-3.2 m² 4.8-6.4 m² 4 casements + 2 ridge + 1 gable fan
50 m² 3.0-5.0 m² 7.5-10.0 m² 6 casements + 3 ridge + 2 gable fans
80 m² 4.8-8.0 m² 12.0-16.0 m² 8 casements + 4 ridge + 2 gable fans

Habitable spaces use 6-10% of floor area as openable area; growing structures use 15-20% because the humidity load, not the temperature, is what has to be removed. A gable-mounted exhaust fan rated at 1.2-1.8 m³/s adds forced ventilation for the 6-10 weeks per year when stack effect alone is insufficient.

Glass Greenhouse Builds: When the Room Is Really a Growing Structure

Roughly one in six enquiries for a glass house turns out to be a horticultural build. The frame geometry is similar, so it is tempting to ship the same kit. It should not be: three specification items diverge sharply, and the warranty claims come from them.

Horticultural Glazing vs Residential Glazing

Horticultural glass is 4 mm float with a high light transmittance (0.88-0.90) and deliberately low solar reflectance; it is not an insulating unit and not safety glass by default. Residential glazing is a sealed IGU with a Low-E coating. Where a growing structure is glazed with residential Low-E units, photosynthetically active radiation drops by 12-18% and measured yield follows. Where a habitable room is glazed with 4 mm float, the U-value is 5.8 W/m²K and the heating bill is roughly 4×.

Humidity, Condensate and the 1.5% Fall

Inside a growing structure, relative humidity sits at 70-95% and the glass is the coldest surface in the enclosure, so condensation is continuous rather than occasional. The roof needs a minimum fall of 1.5% (about 0.86°) so condensate runs to the gutter rather than dripping onto the crop; a glazed roof with integrated condensation channels allows the fall to drop to 1.0%. Gutter capacity should be sized for 100% of roof area draining in one hour at the local rainfall intensity — for 80 m² at 60 mm/h that is 4.8 m³/h, which needs a 100 × 75 mm gutter and two 63 mm downpipes.

All aluminium in contact with that environment must be either powder-coated to Qualicoat Class 2 (or AAMA 2604) or anodised to 15 µm minimum. Mill-finish extrusion in a greenhouse will show white oxide bloom within 18-24 months and the claim will be rejected as an environment issue, not a product defect.

Greenhouse Configurations and Delivered Pricing

Configuration Frame Glazing Vent area FOB USD/m²
G1 hobby greenhouse, 12-24 m² 40×40×2, mill or powder 4 mm horticultural 18% $90-125
G2 polycarbonate, 40-150 m² 50×50×2, powder 10 mm twin-wall PC 20% $105-150
G3 glass greenhouse, 150-400 m² 100×50×3 + 120×60×3 rafters 4 mm horticultural, tempered ridge 22% $130-170
G4 orangerie hybrid, 40-120 m² Thermal break 24 mm 6 + 12Ar + 6 Low-E walls / laminated roof 14% $420-580

The G3-to-G4 jump is not a pricing anomaly — it is the difference between an unheated growing structure and a heated, thermally broken, safety-glazed habitable envelope. For buyers who need both, the usual answer is a partition: a G3 growing bay with a G4 seating area, sharing one ridge but with separate drainage and separate glazing specs. See the glass greenhouse build data for the horticultural side and the veranda and patio enclosure drainage detail for the habitable side.

Conservatory Packages: Dwarf Walls, Bases and Thermal Bridges

A conservatory is a glass room with its lower 500-900 mm replaced by a solid wall. That one change moves the glazing ratio from 85% to about 55%, cuts the heating load by 30-40%, and — more importantly for European compliance — brings the structure within reach of Part L / GEG limits that a full-height glazed room cannot meet.

Dwarf Wall vs Full-Height Glazing: The Numbers

Variant (24 m² floor) Glazing ratio Envelope U-value (W/m²K) Design heat loss at -5°C FOB USD
Full-height glass room, double glazed 86% 2.35 5.9 kW $4,600-6,200
Dwarf wall 600 mm, insulated (U 0.20) 58% 1.72 4.3 kW $6,300-8,100
Dwarf wall 900 mm + triple glazed roof 46% 1.35 3.4 kW $9,400-12,800

The price rises 37-89% while the heat loss falls 27-42%. Whether that is worth it depends entirely on the heating degree-days and the local energy price; at 3,400 HDD and $0.19/kWh the 900 mm dwarf wall pays back in 7-9 years on heating alone, at 1,800 HDD it does not. This is a calculation the buyer should do with their own energy price, not a spec the factory should impose.

Base Detail: Where Glass Rooms Actually Fail

Conservatory Package Breakdown

Package item Specification Included
Frame system Thermal break 24-30 mm PA66GF25, 6063-T5/T6 Yes
Wall glazing 5 + 12Ar + 5 Low-E, EN 1279-5 sealed unit Yes
Roof glazing 6 + 12Ar + 6.38 laminated Low-E, or 50 mm sandwich panel U 0.28 Yes
Ridge and tie bars 150×75×4 ridge for spans above 3.6 m Yes
Dwarf wall Masonry or insulated panel, U 0.18-0.22 No — local build
Slab and perimeter insulation 150 mm RC slab + 100 mm XPS upstand No — local build
Fixings and sealants M10 anchors, EPDM gasket, neutral-cure silicone Yes
Electrical, heating, blinds — Optional

Aluminium Profile Specs: Alloy, Wall Thickness and Thermal Break Width

Sunroom and glass house frames are extruded from the 6xxx series. The three variables the factory needs confirmed before cutting a die are alloy temper, nominal wall thickness and thermal break width.

Alloy and Temper

Alloy / temper Yield (MPa) Tensile (MPa) Where used
6063-T5 110 160 Wall frames, mullions, non-structural trim
6063-T6 170 215 Rafters, purlins, ridge beams — all roof members
6061-T6 240 290 Only where a span exceeds 5 m or for concealed steel-free posts
6060-T66 140 180 Complex multi-hollow thermal break profiles (extrudability)

6063 is chosen over 6061 for almost everything despite the lower strength, because its extrusion speed is 2-3× higher and its surface quality after anodising is better. Using 6061 in a sunroom frame adds roughly 30-40% to the profile cost for no benefit unless a member is genuinely span-limited.

Wall Thickness by Member and Span

Thermal Break Width and the Resulting Uf

The break is a polyamide strip, PA66 with 25% glass fibre (PA66GF25), crimped between the inner and outer aluminium halves. Its width is the single strongest lever on frame U-value.

Strip width Frame depth Uf (W/m²K) Typical Uw with 5+12Ar+5 Low-E Surcharge vs 14.8 mm
14.8 mm 60 mm 3.0-3.4 2.3-2.6 —
18.6 mm 65 mm 2.6-2.9 2.1-2.3 +$8-14/m²
24 mm 75 mm 2.0-2.3 1.7-1.9 +$22-35/m²
30 mm + foam insert 85-90 mm 1.5-1.8 1.4-1.6 +$42-62/m²
Supply note: PA66GF25 strip must be the extruded polyamide specified in EN 14024, not PVC. PVC strip softens above 70°C, which is reachable on a dark-colour frame in summer sun; the shear failure that follows is progressive and appears 2-4 years after installation. Ask for the strip supplier name and the EN 14024 test report on any order above 200 m².

Surface Finish

Powder coating is applied after chrome-free pre-treatment (zirconium/titanium conversion, or chrome passivation where the client accepts it). Film thickness 60-80 µm measured per ISO 2360, cured at 190-200°C metal temperature for 12-15 minutes. Qualicoat Class 1 gives 1,000 h neutral salt spray and 1 year Florida exposure; Class 2 (or AAMA 2605 for the US) gives 2,000 h and 5-year gloss retention above 50%. Anodising to 15-20 µm (AA15/AA20) is used for coastal and greenhouse environments because it does not chalk.

Roof and Wall Glazing Build-Ups: Safety Standards and Condensation

Walls and roofs of a glass house do not follow the same glazing rules. A wall unit is a vertical insulating element; a roof unit is a horizontal element that must also carry a person, shed water, and survive impact from above.

Which Standard Applies Where

Requirement Wall glazing Roof glazing Standard
Safety glass below 1.5 m / accessible Tempered or laminated Laminated required EN 12150 / EN 14449, ANSI Z97.1
Impact classification EN 12600 1B1 / 2B2 EN 12600 1B1 minimum EN 12600
Post-breakage retention Not required Required — PVB/SGP holds fragments EN 356 P2A / P4A
Insulating unit durability EN 1279-5 Class C EN 1279-5 Class C + higher moisture load EN 1279
Walk-on / maintenance load n/a 1.0 kN point load if access anticipated EN 1991-1-1 / local code

The laminated interlayer thickness matters: 0.76 mm PVB is the common minimum, but roof units in snow regions should be 1.52 mm or SGP (ionomer), which retains roughly 5× the stiffness of PVB at 50°C. SGP adds $14-22 per m² of roof glass.

Condensation: Surface Temperature, Not Humidity, Is the Variable

Condensation forms when the internal glass surface drops below the dew point. At 21°C and 50% RH the dew point is 10.2°C. Internal surface temperature is Tsi = Ti − (U/Rsi)(Ti − To) with Rsi = 0.13 m²K/W. For clear double glazing at U = 2.8 and To = 0°C: Tsi = 21 − (2.8/0.13 × … ) — more usefully, Tsi = 21 − (0.13 × 2.8 × 21) = 13.4°C, above dew point. For single roof laminate at U = 5.4: Tsi = 21 − (0.13 × 5.4 × 21) = 6.3°C, below the 10.2°C dew point — the roof will run with water. That is the arithmetic behind the common complaint “my sunroom roof drips”.

Glass Retention on the Roof

Two systems are used. Mechanically retained: an aluminium pressure plate screwed to the rafter at 250-300 mm centres, with EPDM gaskets both sides and a snap cover. Structurally bonded: neutral-cure silicone (usually two-part, e.g. a 2-part structural silicone to ETAG 002) bonding the unit to the rafter with a temporary mechanical restraint. Bonded systems look cleaner but require documented substrate adhesion testing and a defined cure regime; for export projects with local installers, mechanical retention is the lower-risk choice and costs $9-16/m² more.

FOB Pricing: Sunrooms & Glass Houses Price Table (USD)

Quotations in this category are normally given per m² of floor area for a complete kit, and per m² of glass for glazing upgrades. All figures below are FOB Foshan / Guangzhou, in USD, for orders of 60 m² or more, on a 30/70 T/T basis, excluding tooling for new profiles.

Package Tiers

Tier Frame Wall glazing Roof Envelope U FOB USD/m² floor
C1 glass room Non-break 40/50 series, 1.8 mm 5 + 9A + 5 10 mm PC twin-wall 3.1-3.6 $95-140
C2 sunroom Break 18.6 mm, 2.0 mm 5 + 12A + 5 Low-E 50 mm sandwich panel U 0.28 2.0-2.4 $165-235
C3 4-season sunroom Break 24 mm, 2.0-2.2 mm, 6063-T6 roof 5 + 12Ar + 5 Low-E 6 + 12Ar + 6.38 laminated 1.6-1.9 $285-395
C4 orangerie / glass house Break 30 mm + foam, 2.2-2.5 mm 5 + 12Ar + 5 + 12Ar + 5 triple 6 + 16Ar + 6.38 laminated Low-E 1.2-1.5 $450-640

Price Drivers: What Each Upgrade Actually Costs

Upgrade Delta USD/m² Effect
Air fill → argon fill + Low-E +$18-28 Ug 2.8 → 1.1
Double → triple glazing +$55-85 Ug 1.1 → 0.6; +4 kg/m² glass weight
Sandwich roof → glazed laminated roof +$70-120 Roof U 0.28 → 1.2; daylight +, solar gain ++
Thermal break 14.8 → 24 mm +$22-35 Uf 3.2 → 2.1
Standard powder → Qualicoat Class 2 / AAMA 2605 +$12-20 Salt spray 1,000 → 2,000 h
Motorised ridge vent / louvre roof +$95-160 per m² roof Vent area +12-18%; shading SC 0.30-0.45
Hurricane / impact upgrade (Miami-Dade) +$45-90 Laminated impact glazing, heavier sections, more fixings
Reading a quotation: two suppliers quoting C2 at $175 and $228 are usually not quoting the same thing. Ask for the line items: thermal break width in mm, wall thickness in mm, glass build-up with fill gas, roof U-value, and finish class. A $53/m² gap on a 30 m² room is $1,590, and it is almost always the glazing spec.

Freight and Landed Sensitivity

Sunroom kits are light for their volume: 22-28 kg/m² of floor area against a container payload of about 26 t. A 40HQ (68 m³ usable) fills at 420-560 m² of kit, weighing 13-17 t — volume-limited, using 92-96% of the box and 55-65% of the payload. Ocean freight on a Foshan-to-Rotterdam or Foshan-to-Houston move therefore lands at $16-31 per m² of floor area at recent rate levels, but swings to $52-78/m² in a peak season. On a $250/m² kit, freight is 6-12% of FOB in a normal market and up to 31% in a bad one — a far bigger swing than any glazing upgrade in the table above.

Procurement Data: MOQ, Lead Time, Payment and Packing

Sunroom orders are engineering projects rather than catalogue purchases. The commercial terms below are what a Foshan factory will normally agree to on a repeat basis.

MOQ and Why It Exists

Lead Time Breakdown

Stage First order (days) Repeat order (days) Note
Shop drawings / structural check 7-10 3-5 Client sign-off gates the rest
Extrusion 10-14 8-12 Billet 6063 lead + press schedule
Powder coating / anodising 3-5 3-5 Batch scheduling for custom colour
Insulating glass unit production 7-10 7-10 Tempering + laminating often subcontracted
Fabrication and assembly 12-18 10-14 Cutting, crimping, hardware, pre-assembly
QC and packing 3-4 2-3 100% inspection, not sampling
Total ex-works 32-42 26-33 Add 2-5 days inland to port

Payment, Packing and Container Loading

Certifications: CE, NFRC, AAMA, ISO and Miami-Dade NOA

A complete glass house is a structure, so it sits awkwardly between two regulatory worlds: the load-bearing aluminium frame falls under construction products rules, and the opening windows and doors inserted into it fall under fenestration rules. Many suppliers mark the whole assembly CE and hope the inspector does not look closely.

Which Mark Applies to Which Part

Mark / scheme Standard Covers Typical cost Lead time
CE — structural aluminium EN 1090-1, EXC 1-2 Rafters, ridge, posts — factory production control + welds $6,000-14,000 initial; FPC audit yearly 3-5 months
CE — windows and doors in the walls EN 14351-1, AVCP system 3 Watertightness, air permeability, wind resistance, U-value $2,200-4,800 per family 6-10 weeks
CE — external blinds / shading EN 13561 Wind class 1-6 for awnings and roof blinds $1,800-3,600 5-8 weeks
NFRC label (US) NFRC 100 / 200 / 400 U-factor, SHGC, VT, air leakage — simulation + validation $900-2,400 per configuration 3-6 weeks
AAMA / WDMA / CSA 101/I.S.2/A440 Performance class R/LC/CW/AW, DP rating, forced-entry $7,500-19,000 3-6 months
Miami-Dade NOA TAS 201 / 202 / 203 Large-missile impact + cyclic pressure, HVHZ only $18,000-45,000 6-9 months
ISO 9001 / 14001 / 45001 — Factory management system, not product performance $3,000-8,000 initial 2-4 months
Qualicoat / GSB / AAMA 2604-2605 Qualicoat specification Powder coating durability and licence to use the mark $2,500-6,000/year licence 2-4 months

What a Test Report Does Not Cover

Three gaps appear repeatedly. First: EN 14351-1 test results are size-dependent. A window tested at 1,200 × 1,500 mm and reported at Class 4 air permeability and Class E900 watertightness does not carry those classes to a 2,400 × 2,400 mm unit of the same series; the standard permits extrapolation only within defined limits, and most buyers never check. Second: NFRC simulations are per-configuration — change the spacer or the glass thickness and the label is void. Third: EN 1090-1 covers the aluminium members but says nothing about the glazing infill, so a “CE-marked sunroom” may have a certified frame and uncertified glass.

Ask for three documents with any quotation above 100 m²: the DoP (Declaration of Performance) with its declared values and the standard cited, the raw test report with test specimen dimensions, and the certificate’s validity dates. Ten minutes with those three will tell you more than any brochure.

Installation Sequence and Waterproofing for Glass Room Structures

Site problems outnumber factory problems in this category by a wide margin. The sequence below is the one used on export projects with local installation crews, and it is ordered deliberately: nothing that is difficult to reach is installed early.

Sequence: Twelve Steps

  1. Set out from the house wall, not from the slab edge. Check diagonal equality to 3 mm over 6 m.
  2. Verify slab level: 3 mm over 3 m. Anything worse needs a levelling compound or a shimmed sole plate — shimming the frame itself transfers the error into the glazing rebate.
  3. Fix the sole plate with M10 anchors at 600 mm centres, 100 mm embedment, 60 mm minimum edge distance, on a 10 mm EPDM compressible gasket.
  4. Install the wall posts and the wall plate; brace temporarily. Plumb to 2 mm over 2.5 m.
  5. Fit the ridge beam and tie bars; this is the only member that must be mechanically complete before any glazing is loaded.
  6. Fit rafters at the specified centres, checking deflection with a string line before glass goes on.
  7. Install roof glazing with pressure plates, working from eaves to ridge, gaskets dry (no silicone at this stage).
  8. Fit ridge capping and the ridge vent; test vent operation manually before the motor is connected.
  9. Install wall frames and opening sashes; adjust hardware and check sash parallelism within 1.5 mm.
  10. Apply the silicone weather seal — see the notes below on sealant type.
  11. Fit flashings: head flashing lapping the wall by 100 mm, sill flashing with a 10 mm drip, both bedded in neutral-cure silicone.
  12. Water test: 2 L/min per m² of facade for 15 minutes from a spray bar at 300 mm, with the interior inspected from inside. Do this before the client signs anything.

Sealant and Waterproofing Details

Commissioning Checklist

Before handover: every opening sash operates with a force under 60 N (EN 13115 class 2); every locking point engages with the handle at 90°; weeps run free when tested with 200 ml of water; ridge vent opens and closes through full travel with a current draw within 10% of the motor rating; all glass units are free of edge defects visible at 1 m in reflected light; drainage carries 100% of roof area at design rainfall for 10 minutes with no ponding deeper than 2 mm. Documenting these eight items takes 45 minutes and removes most post-handover disputes.

Project Data: Three Delivered Builds with Measured Results

The following are representative export builds shipped from Foshan in the last 24 months, with the specification that was ordered and the performance that was measured afterwards.

Case A — 32 m² Lean-to 4-Season Sunroom, Bavaria

C3 specification: 24 mm PA66GF25 thermal break, 2.0 mm walls, 5 + 12Ar + 5 Low-E walls, 6 + 12Ar + 6.38 laminated roof with a 0.38 g-value, 150 mm RC slab with 100 mm XPS upstand. Kit FOB $10,240 ($320/m²); freight and duty to Munich $3,180; local base and installation $8,900. Envelope U-value measured in situ by heat-flux meter: 1.71 W/m²K. Auxiliary heating demand at the -12°C design point was 2.1 kW against the 5.9 kW the client’s previous full-height double-glazed room needed. Annual heating consumption 2,140 kWh at 3,600 HDD, i.e. 67 kWh/m²·yr — about half the German single-family average, which is what a 4-season classification is supposed to deliver.

Case B — 96 m² Freestanding Glass House, Texas

C4 specification with a motorised louvre roof over 24 m² (shading coefficient 0.42 when closed) and 0.32 g-value selective glazing throughout. Kit FOB $52,800 ($550/m²); the louvre roof alone was $3,600 of that. Monitored over one August: peak interior temperature 29.1°C at 38.4°C ambient and 940 W/m² horizontal irradiance. Without the louvre closed the same day reached 36.8°C — so the shading lever was worth 7.7 K, against 4.2 K from the ventilation package (4 ridge vents + 2 gable fans, 0.9 m³/s measured). Combined cooling load 2.4 kW, which a single mini-split handles.

Case C — 210 m² Glass Greenhouse, Netherlands

G3 configuration: 100×50×3 posts, 120×60×3 rafters at 2.4 m span, 4 mm horticultural glass with tempered ridge panes, 22% vent area (46 m², of which 14 m² motorised ridge), 1.5% roof fall, AA20 anodised finish rather than powder. Kit FOB $29,400 ($140/m²); 40HQ shipped 210 m² at 62 m³ and 5.8 t — 91% of volume, 22% of payload. Measured annual heating 41 kWh/m² against the 58 kWh/m² of the previous polycarbonate structure it replaced, a 29% reduction attributable to the higher light transmittance and the tighter gasket system rather than to the U-value, which barely differs.

Cost Comparison Across the Three

Metric A — 32 m² sunroom B — 96 m² glass house C — 210 m² greenhouse
Kit FOB $10,240 $52,800 $29,400
USD/m² FOB $320 $550 $140
Freight + duty $3,180 (LCL) $7,400 (40HQ share) $4,900 (40HQ)
Local base + install $8,900 $31,600 $18,200
Landed USD/m² $697 $959 $250
Measured energy 67 kWh/m²·yr heat 2.4 kW peak cooling 41 kWh/m²·yr heat
Container utilisation LCL 3.1 m³ 40HQ 34 m³ in shared box 40HQ 62 m³ / 5.8 t

Two patterns are consistent across all three. Freight per m² is 4.6-8.4× higher on the LCL move (Case A) than on the consolidated container (Case C), which is why orders below 8-10 m³ should be consolidated with other product lines. And local base plus installation runs at 62-87% of kit FOB — buyers who budget only for the kit will be roughly 70% short.

Material Comparison: Aluminium, uPVC, Timber and Steel Frames

Aluminium dominates the export market for glass houses, but it is not the right answer everywhere. The comparison below uses delivered frame cost, not glazing, and holds the glazing specification constant so the frame differences are visible.

Four Frame Materials on Measurable Criteria

Criterion Aluminium thermal break uPVC multi-chamber Engineered timber Steel (thermally broken)
Frame Uf (W/m²K) 1.5-3.4 1.2-1.8 1.3-1.6 1.8-2.4
Max unsupported rafter span 3.6 m 2.4 m (steel-cored) 3.0 m 5.0 m
Profile sightline at equal strength 50-75 mm 70-120 mm 60-95 mm 35-60 mm
Recoat / maintenance interval 25-40 yr (finish) 15-20 yr (chalking) 3-5 yr 8-12 yr
Reaction to fire A1 (melts 660°C) B-s1,d0 self-extinguishing D-s2,d0 combustible A1
Recycled content, typical 60-75% secondary 5-25% (limited passes) 0% (FSC chain of custody) 70-90%
Frame cost index 100 62 145 130
Freight weight index 100 155 118 240

uPVC wins on frame U-value and on price, and it is the correct answer for a small 3-season glass room in a temperate climate where nobody needs a 3.6 m rafter. It loses on sightline width and on freight weight — 155% of the aluminium figure means a 40HQ hits the payload limit before the volume limit, which quietly raises the freight per m². Steel is the only material that reaches 5 m spans with a 40 mm sightline, which is why it appears in orangerie lantern roofs, but at 240% of the freight weight it is expensive to ship.

When Not to Specify Aluminium

Specification Failures: Seven Defects and the Fix

These are the recurring items in post-installation claims on glass room projects, in rough order of frequency, with the specification change that prevents each one.

1. Roof Dripping (Reported as a Leak)

Mechanism: internal roof surface below dew point, as calculated in the glazing section — single laminate at U 5.4 gives Tsi = 6.3°C against a 10.2°C dew point. Fix: insulating roof unit to Ug 1.2, warm-edge spacer, and 0.3-0.5 ACH background ventilation. A genuine leak, by contrast, wets the same spot every time it rains regardless of indoor humidity; a condensation complaint appears on cold still mornings with no rain.

2. Ridge Sag and Consequent Glass Cracking

Mechanism: rafter or ridge sized on stress instead of deflection, giving L/114 rather than L/180 or better. Fix: state the deflection limit in the enquiry; require the supplier to return Ix and the calculated mid-span deflection for the governing load case, not just “complies with the standard”.

3. Anchors Too Close to the Slab Edge

Mechanism: concrete breakout cone. An M10 at 30 mm edge distance retains only 45-60% of the capacity it has at 60 mm. Fix: 60 mm minimum edge distance, 100 mm embedment, and a perimeter thickening to 300 × 300 mm where fixings land near the slab border.

4. Acetoxy Silicone Against Laminated Glass

Mechanism: acetic acid released during cure migrates into the PVB interlayer and produces edge haze and eventual delamination, typically visible 6-18 months after handover. Fix: specify neutral-cure (alkoxy or oxime) silicone in writing on the glazing schedule, and reject any tube on site that is not labelled.

5. PVC Thermal Strip Instead of PA66GF25

Mechanism: shear creep above 60-70°C, which a dark powder-coated frame reaches in summer. The two aluminium halves progressively separate; the symptom is a door that drops and will not latch. Fix: require the EN 14024 report and the strip manufacturer’s name, and add a 1.5 kN/m shear test to the incoming inspection for orders above 200 m².

6. Undersized Drainage

Mechanism: gutter sized for half the roof area, or a downpipe sized for the average rainfall rather than the 2-minute design intensity. Fix: size for 100% of plan area at the local 1-in-5-year 5-minute intensity; on a 40 m² plan in a 60 mm/h zone that is 2.4 m³/h, needing 75 × 50 mm gutter and one 63 mm downpipe per 20 m of eaves.

7. Clear Glass Specified on the Equator-Facing Elevation

Mechanism: 16.1 kW of peak gain against 4.2 kW of achievable ventilation removal. Fix: g-value 0.30-0.38 on the equator-facing and roof planes, 0.55-0.65 on the polar-facing plane where winter gain is useful, and external shading before internal blinds. Internal blinds reject 20-35% of the energy; external shading rejects 55-70%, because the heat never enters the room.

A glass room is assembled from the same component families as the rest of the fenestration package. The links below point to the specification data for each part, so the wall openings, the roof glazing and the shading can be specified consistently.

Ordering checklist. Before requesting a quotation for sunrooms & glass houses from a China manufacturer, confirm these six: (1) occupancy class — growing structure or habitable room; (2) glazing ratio and roof type; (3) design snow and wind uplift values for the site; (4) thermal break width in mm and wall thickness in mm; (5) g-value per elevation, not per project; (6) deflection limit for the roof members. Six answers, and the quotation will be comparable between suppliers. Without them, two quotes that differ by 30% are usually the same product with different assumptions.
[footer_contact_form]