A veranda is a covered, usually open-sided structure attached to a building. That definition decides everything downstream: which loads apply, whether the roof water has somewhere to go, whether glass above peoples heads needs a safety interlayer, and whether a U-value requirement exists at all. This page is written for buyers specifying veranda kits from a Factory in China: it covers aluminium rafter sizing, conservatory-grade overhead glazing, patio enclosure sunroom retrofits onto existing slabs, and the roof drainage arithmetic that most quotations leave out. Prices, MOQ, lead times and certificate scope are listed with numbers rather than adjectives.
Veranda vs Sunroom vs Conservatory vs Patio Enclosure: Four Load Cases
Suppliers quote these words almost interchangeably, and that is where cost overruns start. The four categories differ in one decisive respect: whether the space is heated. Once a space is heated, the roof and walls become part of the building envelope and every component changes class – U-values, air tightness, condensation control, and usually the planning route.
Functional definitions and their consequences
Type
Heated?
Sides
Roof typical
Water must be…
Sealed / drained
Veranda
No
Open or partial
Glass, PC or louvre, 100-900 mm projection past posts
Collected at the eaves and piped away
Drained and ventilated
Aluminum sunroom
Yes / partly
Fully glazed, opening sashes
Insulated panel or IGU, U 0.35-1.10
Same as veranda plus internal condensation control
Sealed + internally drained
Conservatory
Usually yes
Fully glazed, brick or glazed plinth
Mostly glass, U 1.10-2.60
Piped away, plus roof vents for summer purge
Sealed + ventilated
Patio enclosure sunroom
Sometimes
Existing terrace, closed with frames
Light weight, existing slab limits
Into existing drainage or new linear drain
Retrofit interface dominated
Pergola / louvre roof (for contrast)
No
Open
Rotating blades or slats
Allowed to fall between blades
Not drained, does not need to be
The last row matters. A pergola with rotating blades is designed so water passes through; a veranda roof is designed to catch it. The moment you close the blades and call it a roof, you inherit the whole drainage section below – catchment area, gutter capacity, downpipe count, overflow weir. Buyers comparing a pergola and gazebo quotation against a veranda quotation are comparing two different hydraulic systems.
What actually changes in the load list
Open-sided verandas have the lowest overall load but the worst wind behaviour, because the roof acts as a wing: pressure is applied under the soffit from wind entering the open sides. Closed sunrooms do not see that uplift pattern, they see external pressure distribution on opaque faces. So “closing it in” does not always reduce the structural requirement – it relocates it.
Load case
Open veranda (sk 0.75)
Glazed sunroom (sk 0.75)
Comment
Snow on roof
0.75 kN/m2
0.75 kN/m2
Same if the roof geometry matches
Wind on roof (closed sides)
Up to -1.4 kN/m2 uplift (open)
Typically -0.8 to -1.0
Open structures see net uplift
Internal pressure coefficient
Applies (open sides)
Reduced
Affects net uplift
Rain / drainage
Full catchment
Full catchment
Identical – often forgotten
Maintenance point load
1.0 kN on roof pane
1.0 kN on roof pane
Controls glass thickness, not structure
Ask for the wind uplift and snow load numbers in writing before asking for a price. Two quotations for the same drawing can differ by 20-30% purely because one includes net uplift under an open soffit and the other only checks gravity.
Sunrooms & Glass Houses: Where the Envelope Line Actually Falls
Every glazed extension has one drawing-level decision that everything else follows: which surface is the thermal envelope. Draw it wrongly and no amount of glass upgrading fixes the result. There are only two options, and they produce completely different specifications.
Option A: the veranda stays outside the envelope
The sliding doors between house and veranda are external doors and must meet external door U-value and air-tightness requirements – see the data in our page on heavy-duty aluminium sliding door specifications.
The veranda roof can be single-glazed or polycarbonate: U 1.70-5.60 W/m2K is acceptable because nobody pays to heat the space.
The veranda is ventilated to near-outdoor conditions; internal air does not carry much moisture, so there is no interstitial condensation problem.
Cost consequence: the cheap part stays cheap. A single-glazed roof is roughly a quarter of the price of an IGU roof (see the pricing section).
Option B: the veranda is inside the envelope
The roof and all side walls now have a U-value limit. Practical targets: roof U 0.15-0.35 W/m2K in Northern Europe, walls U 1.0-1.4 W/m2K for windows and doors.
Air tightness becomes a product requirement, not an installation nicety. A 1 mm continuous gap around a seal equals about 0.30% of a panel area but drops acoustic performance from Rw 40 dB to roughly 25 dB, and it is also where air leakage shows up in a blower-door test.
Surface temperature matters: for internal relative humidity of 40% at 20 ℃, dew point sits near 6 ℃. Any framing whose internal surface falls below that will show condensation first on the aluminium, not on the glass.
Cost consequence: everything goes up a class. This is the difference between buying conservatory glazing and buying double-glazed window units for the walls and an insulated roof panel.
Option B is usually chosen verbally (“we will use it as a dining room”) and then specified as Option A to save money. Write the intended use into the enquiry. If the space is heated, say so – otherwise the quote you get back cannot be compared with anything else.
Aluminum Sunroom Structure: Rafters, Spans and Where the Cost Sits
Veranda and sunroom roofs are beams-and-glass problems. The glass sets the rafter spacing; the rafter spacing sets the section; the section drives the aluminium tonnage, which is the single largest variable cost in an aluminium sunroom kit. Three steps, in that order.
Section properties for the seven standard aluminium sunroom profiles
Ref
Rectangular tube
A (mm2)
Ix (mm4)
Wx (mm3)
Mass (kg/m)
R1
60 × 60 × 2.5 mm
575
317448
10582
1.55
R2
80 × 60 × 3.0 mm
804
468972
15632
2.17
R3
100 × 60 × 3.0 mm
924
566532
18884
2.49
R4
120 × 60 × 3.0 mm
1044
664092
22136
2.82
R5
150 × 70 × 3.0 mm
1284
1141772
32622
3.47
R6
180 × 80 × 3.0 mm
1524
1804252
45106
4.11
R7
200 × 80 × 4.0 mm
2176
2561365
64034
5.88
All values are computed from the nominal outer dimensions and wall thickness. Note how poorly width buys you anything: going from R3 (100 × 60 × 3.0) to R4 (120 × 60 × 3.0) adds 1.0 kg of profile per metre and returns only 17% more second moment of area. Depth is what pays: R5 adds 10 mm of depth over R4 and returns 72%.
Allowable rafter span at L/200, glass roof, rafters at 1.50 m centres
Load case / section
Max span (mm)
Bending stress (MPa)
Utilisation
kg roof profile / m
sk 0.75 kN/m2 · R1
1756
57.4
37%
1.55
sk 0.75 kN/m2 · R2
2000
50.4
33%
2.17
sk 0.75 kN/m2 · R3
2130
47.3
31%
2.49
sk 0.75 kN/m2 · R4
2246
44.9
29%
2.82
sk 0.75 kN/m2 · R5
2691
43.7
28%
3.47
sk 0.75 kN/m2 · R6
3134
42.9
28%
4.11
sk 0.75 kN/m2 · R7
3523
38.2
25%
5.88
sk 1.50 kN/m2 · R1
1468
68.7
44%
1.55
sk 1.50 kN/m2 · R2
1671
60.3
39%
2.17
sk 1.50 kN/m2 · R3
1780
56.6
37%
2.49
sk 1.50 kN/m2 · R4
1877
53.7
35%
2.82
sk 1.50 kN/m2 · R5
2248
52.3
34%
3.47
sk 1.50 kN/m2 · R6
2619
51.3
33%
4.11
sk 1.50 kN/m2 · R7
2943
45.7
30%
5.88
sk 2.00 kN/m2 · R1
1352
74.5
48%
1.55
sk 2.00 kN/m2 · R2
1540
65.4
42%
2.17
sk 2.00 kN/m2 · R3
1640
61.4
40%
2.49
sk 2.00 kN/m2 · R4
1730
58.3
38%
2.82
sk 2.00 kN/m2 · R5
2072
56.8
37%
3.47
sk 2.00 kN/m2 · R6
2413
55.7
36%
4.11
sk 2.00 kN/m2 · R7
2712
49.5
32%
5.88
sk 3.00 kN/m2 · R1
1199
84.1
54%
1.55
sk 3.00 kN/m2 · R2
1366
73.8
48%
2.17
sk 3.00 kN/m2 · R3
1454
69.3
45%
2.49
sk 3.00 kN/m2 · R4
1534
65.7
43%
2.82
sk 3.00 kN/m2 · R5
1837
64.0
41%
3.47
sk 3.00 kN/m2 · R6
2140
62.8
41%
4.11
sk 3.00 kN/m2 · R7
2405
55.9
36%
5.88
Two things jump out of that matrix. First, every case is deflection-controlled: even the smallest section R1 carries the load at only 37% of the 154.5 MPa allowable stress of 6063-T6 (Rp0.2 = 170 MPa divided by a partial factor of 1.10). Buying a bigger section for “strength” buys you almost nothing. Second, the span only grows with the cube root of the second moment of area – so doubling I only buys 26% more span. Halving the span by adding a rafter or a mid-purlin is far more effective.
Adding a rafter beats upsizing: the L3 and L4 arithmetic
For a simply supported member under uniform load, deflection is proportional to wL⁴/I. If you halve the span by inserting one intermediate support, the same section carries 16 times the load at the same deflection. Upsizing from R2 to R7 multiplies I by about 5.5, which is a very expensive way to buy something a second support would deliver for the price of one more profile length plus a bracket.
Strategy
Change
Effect on deflection
Cost index
Insert a mid-purlin
Span 3.0 m → 1.5 m
Divides by 16
100
Close rafter spacing 1.50 → 1.20 m
Less glass per rafter too
Load per rafter × 0.80, span unchanged
110-125
Upsize R2 → R5
I × 2.43
Divides by 2.43
165
Upsize R2 → R7
I × 5.46
Divides by 5.46
270
Re-work the glass layout
Smaller panes, more rafters
Same as a purlin, plus thinner glass is possible
90-105
This is the one request worth making early: ask the factory to price the same opening with rafters at 1.50 m and at 1.20 m. On a 30 m2 veranda the tighter grid usually costs USD 180-420 more in profile and saves USD 500-900 in glass thickness.
Panel-roof variant: insulated roofs change which check governs
Ref
Profile
Max span (mm)
Stress (MPa)
Utilisation
R1
60 x 60 x 2.5
1539
65.5
42%
R2
80 x 60 x 3.0
1753
57.5
37%
R3
100 x 60 x 3.0
1867
54.0
35%
R4
120 x 60 x 3.0
1969
51.2
33%
R5
150 x 70 x 3.0
2358
49.9
32%
R6
180 x 80 x 3.0
2747
48.9
32%
R7
200 x 80 x 4.0
3087
43.5
28%
Above: 40 mm insulated sandwich roof at 0.45 kN/m2 self-weight, snow 1.50 kN/m2, rafters at 1.20 m centres. The heavier roof costs you roughly 10% of span compared with the glazed roof at 1.50 m centres, but the insulated panel also replaces the glass cost – which is why a fully insulated sun room package can end up cheaper than a big glazed roof once U-value compliance enters the picture.
Conservatory Roof Glazing: What Changes When Glass Is Overhead
Vertical glass fails inward and is usually caught by the frame. Overhead glass falls down. That one difference dictates the build-up, and it is the reason a conservatory roof cannot simply use the same unit as the side walls. Three checks, in this order: containment, then bending capacity, then the maintenance point load.
Check 1 – containment: what happens after breakage
Position
Minimum accepted practice
Standard reference
Failure consequence
Vertical (sides)
Toughened monolithic, or laminated
EN 12600 pendulum classification
Falls out of frame, contained by floor below
Overhead, sloped up to 75° from horizontal
Laminated glass with PVB or SGP interlayer, OR monolithic toughened with a screen below
EN 12600 class 1(C)2 minimum, plus interlayer retention
Monolithic glass drops fragments into occupied space
Overhead, accessible for cleaning, seated areas
Laminated with SGP or ionoplast, minimum 8-1.52-8
EN 12600 + project risk assessment
Large pane detaches whole
Sloped glazing in roof structures with personnel below during service
Laminated plus documented 1.0 kN point-load check
EN 1991-1-1 cat. H with EN 16612 verification
Pane fails under a person
A “6 mm toughened” roof pane is not automatically wrong, but it is only acceptable in combination with a retention measure below it, and in most European markets a building-control officer will ask for the evidence. Laminated glass is the default because it makes the retention part of the product rather than part of the site work.
Check 2 – allowable panel span under uniform load
Build-up
hef (mm)
1.00 kPa
1.75 kPa
2.50 kPa
3.50 kPa
Mass kg/m2
6 float single
6.00
1.77
1.34
1.12
0.95
15.0
6-1.52-6 PVB clear
8.49
2.50
1.89
1.58
1.34
31.8
6-1.52-6 Low-E + argon
8.49
2.50
1.89
1.58
1.34
32.6
8-1.52-8 PVB
11.31
3.34
2.52
2.11
1.78
42.4
10-1.52-10 SGP
14.14
4.17
3.15
2.64
2.23
53.0
6-12Ar-6 Low-E IGU
10.95
3.23
2.44
2.04
1.73
30.0
Computed from σmax = 0.2874 · q · a² / t² for a square plate with all four edges simply supported (ν = 0.3), against a design strength of 25.0 MPa for annealed glass, which is the characteristically weak layer in these build-ups. The load values on the header row should be read as your governing characteristic combination: self-weight plus snow plus whatever uniform maintenance or wind value your jurisdiction uses.
Read the columns left to right and the message is clear: going from 1.00 kPa to 3.50 kPa cuts the allowable span by 46% for every build-up. A snow region does not need a better piece of glass – it needs a smaller pane, which means more rafters, which means that the drainage and the rafter grid have to be designed together, not separately.
Check 3 – the maintenance point load, which usually governs
Maintenance access puts 1.0 kN (some jurisdictions 1.5 kN) on the worst point of a pane. Uniform load equations do not capture this, so it has to be checked separately. Using an effective-width strip approximation – the load travels to the supports across a width proportional to the short span – the resulting maximum stress reduces to σ = 1.5 · F / t² with F in newtons and t in millimetres, independent of span.
Build-up
hef (mm)
Stress, 1.0 kN (MPa)
Verdict
Stress, 1.5 kN (MPa)
Verdict
6 float single
6.00
41.7
FAIL
62.5
FAIL
6-1.52-6 PVB clear
8.49
20.8
PASS
31.2
FAIL
6-1.52-6 Low-E + argon
8.49
20.8
PASS
31.2
FAIL
8-1.52-8 PVB
11.31
11.7
PASS
17.6
PASS
10-1.52-10 SGP
14.14
7.5
PASS
11.3
PASS
6-12Ar-6 Low-E IGU
10.95
12.5
PASS
18.8
PASS
This single check explains why monolithic 6 mm is never specified overhead even though it passes every uniform-load check in the previous table. It also explains why quoting by “mm of glass” is misleading: 6-1.52-6 laminated and 12 mm monolithic have identical nominal thickness and very different behaviour.
Two further points that belong on the purchase order rather than in the drawing: ask for heat-soak testing to EN 14179 on any toughened pane destined for a roof (budget USD 4-7/m2, it removes most of the nickel-sulphide breakage that otherwise shows up as unexplained failures in year one or two), and specify SGP instead of PVB where panes sit over seating areas or where butt joints between panes carry load.
Roof Build-ups: U-Values, Solar Gain and Rain Noise
Roof glazing is specified by what it does to heat, not by what it costs per square metre. The two numbers that matter are U for winter loss and g for summer gain, and on a near-horizontal surface they pull in opposite directions far harder than they do on a facade.
Build-up comparison
Roof build-up
U W/m2K
g value
Mass kg/m2
Acoustic / use
Expected service life
16 mm polycarbonate multiwall
2.40
0.62
2.9
19 dB
10-15 yr
25 mm polycarbonate multiwall
1.70
0.55
3.8
21 dB
12-18 yr
6-1.52-6 laminated clear
5.60
0.72
31.8
Rw 33 dB
20-25 yr
6-1.52-6 Low-E + argon cavity
2.60
0.48
33.0
Rw 34 dB
20-25 yr
6-12Ar-6 Low-E IGU (unit 24 mm)
1.10
0.32
32.0
Rw 34 dB
25+ yr
40 mm PU sandwich roof panel
0.48
0.00
11.5
Rw 30 dB
25+ yr
Insulated aluminium + gypsum ceiling
0.35
0.00
26.0
Rw 38 dB
25+ yr
The useful cross-read here is choice versus consequence. A clear laminated roof (U 5.60) costs about USD 15-22/m2 less than the IGU equivalent but adds a heat loss that no heating system recovers cheaply. Conversely, dropping from g 0.72 to g 0.32 removes more than half the summer solar input through the same area – often the whole overheating problem.
Solar gain: numbers for a real roof, not a sample coupon
Roof glazing area (m2)
g value
Peak summer gain (kW)
Clear winter gain (kW)
Ratio / swing (kW)
12
0.72
7.8
1.7
6.0
12
0.48
5.2
1.2
4.0
12
0.32
3.5
0.8
2.7
20
0.72
13.0
2.9
10.1
20
0.48
8.6
1.9
6.7
20
0.32
5.8
1.3
4.5
32
0.72
20.7
4.6
16.1
32
0.48
13.8
3.1
10.8
32
0.32
9.2
2.0
7.2
Computed at 900 W/m2 incident on a horizontal surface in summer and 200 W/m2 in winter. On a 32 m2 veranda roof, going from clear glass to a solar-control coating removes 11.5 kW of peak summer gain. No mechanical cooling capacity is cheap at that scale – which is why the coating, not the HVAC line item, is the usual answer. Detail: see the discussion of g-value choice in double and triple glazed unit selection.
Rain noise and the case for one damp layer
Impact noise on polycarbonate multiwall is the single most common occupant complaint. A 16 mm PC sheet at U 2.40 has almost no acoustic mass; adding a 6 mm layer or moving to laminated glass changes the sound character completely.
A practical compromise: glass over the seated area, PC over the planted or circulation area. This is a purely acoustic decision and should be made before the rafter grid is fixed because the two materials do not share the same support spacing.
For mixed roofs, note that the two materials do not age the same way. PC yellows and loses transmission over 10-15 years; glass does not. On a long project either accept a visible mismatch later or use glass throughout.
Veranda Roof Drainage: Catchment, Gutter and Downpipe Sizing
This is the section most veranda quotations skip, and it is the one that generates callback traffic. A roof that holds water is not a roof that is slightly wet – it is a roof carrying an accidental live load, staining its own fascia, and, after one freeze cycle, leaking at the joints. The arithmetic below takes about ten minutes and it is entirely deterministic.
Step 1 – catchment area and flow rate
Roof plan area (m2)
Q at 75 mm/h (L/s)
Q at 110 mm/h (L/s)
Q at 150 mm/h (L/s)
12
0.25
0.37
0.50
20
0.42
0.61
0.83
30
0.62
0.92
1.25
45
0.94
1.38
1.88
60
1.25
1.83
2.50
90
1.88
2.75
3.75
140
2.92
4.28
5.83
Q = A · r / 3600 with A in m2 and r in mm/h. The “75 mm/h” column is the conventional continuous-rainfall figure for temperate Europe; 110 and 150 mm/h are used where short high-intensity storms drive the design, or where local code requires it. Where a vertical wall discharges onto the roof, add half of that wall area to the catchment in line with EN 12056-3 – this is the adjustment that gets forgotten on returns and against parapets.
Step 2 – what the gutter can carry
Box gutter (w × d)
Cap. at 0.25% slope (L/s)
at 0.5% (L/s)
at 1.0% (L/s)
Velocity at 0.5% (m/s)
Full storage (L/m)
100 x 70 mm
1.54
2.17
3.07
0.52
7.0
125 x 80 mm
2.46
3.48
4.93
0.58
10.0
150 x 90 mm
3.66
5.18
7.33
0.64
13.5
200 x 110 mm
6.99
9.88
13.98
0.75
22.0
Manning uniform flow with n = 0.011 for smooth aluminium, filled to 60% of depth to leave freeboard. Note what the velocity column tells you: even a large box gutter runs at well under 1 m/s at ordinary falls, so grit and leaves do not self-clean. If the site has trees overhanging, the gutter will need mechanical cleaning regardless of how generously it is sized – specify access rather than capacity.
A level gutter carries nothing. Many installers set the gutter visually level so the fascia line looks clean against the house. At zero slope the conveyance column above becomes zero and the gutter only stores water – 7.0 to 22.0 L per metre depending on size. A 30 m2 roof catching 150 mm/h generates 1.25 L/s, which is 450 L in six minutes, so even a 12 m long 200 × 110 gutter (264 L stored) overflows in under four minutes. Design for at least 0.25% fall and set the fascia to suit, or use a hidden structural fall and a level-looking fascia trim.
Step 3 – how many downpipes
Nominal pipe
Internal dia.
Flow at 20 mm head (L/s)
at 40 mm (L/s)
at 60 mm (L/s)
Litres per minute at 40 mm
⌀ 50 mm
ID 45 mm
0.62
0.87
1.07
0.1
⌀ 63 mm
ID 58 mm
1.03
1.45
1.78
0.1
⌀ 75 mm
ID 70 mm
1.49
2.11
2.59
0.1
⌀ 90 mm
ID 84 mm
2.15
3.04
3.73
0.2
⌀ 110 mm
ID 104 mm
3.30
4.67
5.71
0.3
⌀ 160 mm
ID 152 mm
7.05
9.97
12.21
0.6
Q = Cd · A · √(2 g h) with Cd = 0.62 for the sharp-edged entry formed at the gutter sole. Take the head as the water depth over the outlet – conservatively 20-40 mm for a gutter working at its designed fill. Two consequences follow directly from the table:
Never specify fewer than two downpipes on a veranda, whatever the arithmetic says. One blocked leaf is not an inconvenience, it is an overflow directly over the threshold.
Capacity rises only with the square root of head. Doubling the water depth buys 41% more flow – so deepening the gutter is a weak lever, whereas increasing outlet count is linear.
A ⌀ 110 downpipe at 40 mm head handles 4.67 L/s. Against the table in step 1, that is a 140 m2 roof even at 110 mm/h – so for domestic verandas the binding constraint is rarely pipe size, it is the number and position of outlets.
Size the outlet to match the pipe, not the other way round. A ⌀ 110 pipe fitted to a 60 mm stamped outlet performs like a 60 mm outlet.
Step 4 – what to write into the order
Item
Minimum requirement
Why it fails if omitted
Gutter fall
0.25% minimum (0.5% preferred), set structurally
Zero conveyance, standing water, staining
Outlet spacing
Two per run, ≤ 12 m apart, both ≥ ⌀ 75
Single-point blockage = internal overflow
Overflow provision
Front lip lower than the upstand flashing
Water goes backwards into the building instead of outwards
Expansion joint
Every 12-15 m of aluminium gutter
See the table below – 11 mm of movement at 12 m
Leaf guard
Removable perforated cover or brush strip
Velocity is sub-self-cleansing everywhere
Discharge termination
To a gully, not onto the paving
Erosion of the joint sand, splash staining on the wall
Aluminium moves 23 × 10-6 per K. On a long veranda that is not a detail:
Gutter run length
ΔT 20 K (mm)
ΔT 30 K (mm)
ΔT 40 K (mm)
ΔT 55 K (mm)
3 m
1.4
2.1
2.8
3.8
6 m
2.8
4.1
5.5
7.6
9 m
4.1
6.2
8.3
11.4
12 m
5.5
8.3
11.0
15.2
15 m
6.9
10.3
13.8
19.0
A dark powder-coated gutter on a south-facing elevation in a European summer easily sees ΔT of 40 K against a cold night, so 11 mm per 12 m is a realistic working number. The joint has to take that movement while remaining watertight, which means a sliding joint in the gutter itself and brackets that allow movement rather than pinning it.
Eaves, Fascia and the Wall Interface
The connection between a new veranda roof and an existing house wall carries more project-specific risk than anything else in the kit. It is also the least visible part of the quotation, frequently described in one line as “flashings included”.
Upstand and counter-flashing geometry
Minimum upstand: 150 mm above the finished roof surface at the abutment, measured after the roof covering is laid, not before.
Chase the flashing at least 25-30 mm into a masonry joint and wedge-and-point; surface-stuck flashing to render relies entirely on sealant adhesion and typically fails in 3-5 years.
Never use acetic-cure silicone against aluminium or against any galvanised or anodised component – it corrodes the anodised layer and attacks zinc. Specify neutral cure.
Where the wall is externally insulated, standard detailing does not apply at all – see below.
Fixing through external wall insulation: the trap
Externally insulated facades are now the default across much of Europe, and their insulation layer has effectively zero pull-out strength. A veranda ledger board or a post console screwed into EPS will move. The load has to reach the structural substrate through stand-off brackets with resin or mechanical anchors, and every one of those brackets is a point thermal bridge.
χ per bracket (W/K)
Number of brackets
Heat loss at ΔT 20 K (W)
Equivalent annual loss (kWh/yr)
0.12
8
19.2
168
0.12
12
28.8
252
0.12
18
43.2
378
0.18
8
28.8
252
0.18
12
43.2
378
0.18
18
64.8
568
0.25
8
40.0
350
0.25
12
60.0
526
0.25
18
90.0
788
Typical published χ values for aluminium consoles through 100-200 mm of insulation range from about 0.12 to 0.25 W/K per fixing. Twelve brackets therefore cost roughly 378 kWh/yr against a ΔT of 20 K – a real number, but small compared with the consequence of not fixing properly. The correct answer is always to fix structurally and accept the bridge; the wrong answer is to fix into insulation and claim it is “only a veranda”.
Substrate fixing matrix
Existing wall
Preferred fixing
What usually goes wrong
Solid brick / block masonry
M10-M12 chemical anchor, ≥ 100 mm embedment
Drilling into hollow brick without a sleeve – anchor pulls out under uplift
Concrete / reinforced concrete
Torque-controlled expansion anchor or resin
Hitting reinforcement; requires relocation and a larger bracket spacing
Externally insulated render (EWI)
Stand-off console with resin anchor to substrate
Screwing through the insulation; also compresses the render and cracks it
Timber frame with cladding
Locate studs, fix to sole/top plate or a new trimmer
Missing studs; adding load to cladding battens that carry only cladding
Steel frame / light gauge
Self-drilling screws to a verified section thickness
Thin gauge (< 1.5 mm) gives no thread engagement; needs a backplate
Tile hanging or rainscreen
Remove tiles locally and fix to the substrate, then re-detach
Fixing through tiles leaks behind the rainscreen invisibly
Ask the installer to record which of these six cases applies on site, with a photograph of the exposed substrate before the console is fitted. That photograph is the cheapest Evidence available if anything later moves.
Patio Enclosure Sunroom: Building on an Existing Slab
A patio enclosure sunroom is a retrofit job, and retrofit jobs fail at the interface rather than in the product. The aluminium kit will arrive correct; what decides the outcome is what was already there. Three checks have to happen before anything is ordered.
Existing slab survey – four numbers
Check
How to measure
Acceptable
If it fails
Surface fall away from the building
Straightedge and level, several directions
1:80 minimum (12.5 mm per metre)
Grind or lay a self-levelling screed with a fall; otherwise water tracks to the wall
Damp proof membrane below slab
Core sample or record drawing
Continuous membrane lapped to the wall DPC
New must not trap moisture; use a ventilated perimeter detail instead of sealed
Slab thickness & reinforcement
Local break-out or cover meter
≥ 100 mm for point loads from posts
Local pad foundations (below)
Existing drainage position
Locate gullies, note invert levels
Gully below the future gutter outlet level
Linear channel drain along the front edge, or a pumped sump
The third row is the one that gets skipped, because the slab looks solid. A domestic patio slab is normally designed only to carry its own weight plus people. Adding a point load from a veranda post changes the load case completely.
Post reactions and pad sizing
Roof footprint (m2)
Snow (kN/m2)
Total vertical load (kN)
Posts
Reaction per post (kN)
12
0.75
12.6
4
3.2
12
0.75
12.6
6
2.1
12
2.00
27.6
4
6.9
12
2.00
27.6
6
4.6
18
0.75
18.9
4
4.7
18
0.75
18.9
6
3.2
18
2.00
41.4
4
10.3
18
2.00
41.4
6
6.9
24
0.75
25.2
4
6.3
24
0.75
25.2
6
4.2
24
2.00
55.2
4
13.8
24
2.00
55.2
6
9.2
36
0.75
37.8
4
9.5
36
0.75
37.8
6
6.3
36
2.00
82.8
4
20.7
36
2.00
82.8
6
13.8
48
0.75
50.4
4
12.6
48
0.75
50.4
6
8.4
48
2.00
110.4
4
27.6
48
2.00
110.4
6
18.4
Now convert each reaction into a pad. For a 300 mm thick concrete pad (24 kN/m3) the pad self-weight is 7.2 kN per square metre of base, so the required base area is A ≥ N / (σallow – 7.2), all in kN and kN/m2:
Post reaction
Soft clay 75 kPa
Firm clay 100 kPa
Stiff clay / dense sand 150 kPa
Gravel 300 kPa
2.5 kN
0.04 m2 (192 × 192 mm)
0.03 m2 (164 × 164 mm)
0.02 m2 (132 × 132 mm)
0.01 m2 (92 × 92 mm)
4.0 kN
0.06 m2 (243 × 243 mm)
0.04 m2 (208 × 208 mm)
0.03 m2 (167 × 167 mm)
0.01 m2 (117 × 117 mm)
6.3 kN
0.09 m2 (305 × 305 mm)
0.07 m2 (261 × 261 mm)
0.04 m2 (210 × 210 mm)
0.02 m2 (147 × 147 mm)
10.0 kN
0.15 m2 (384 × 384 mm)
0.11 m2 (328 × 328 mm)
0.07 m2 (265 × 265 mm)
0.03 m2 (185 × 185 mm)
15.0 kN
0.22 m2 (470 × 470 mm)
0.16 m2 (402 × 402 mm)
0.11 m2 (324 × 324 mm)
0.05 m2 (226 × 226 mm)
Note the floor at the bottom of that table: even at 300 kPa allowable bearing, no pad works out smaller than about 300 × 300 mm, for a mundane reason – anything smaller cannot be dug, levelled and concreted reliably by hand. Specifying “200 × 200 pads” saves nothing and produces a pad with no edge distance around the post base.
Enclosure sequence for a retrofit
Survey and photograph the existing substrate at every intended fixing point – see the matrix in the eaves section above.
Set out and cast any new pads; allow a minimum of 7 days before loading if using C25/30.
Install the wall ledger or console brackets with the correct anchors, and record torque.
Erect posts and beams dry, without final fixing, and check the roof fall before glass.
Fit the gutter and check fall with a level – do this before the roof is glazed.
Glaze the roof. Sequence matters: always from the low edge upward so laps shed correctly.
Fit side frames and doors, then the verge and upstand flashings last.
Flood-test the gutter for at least 10 minutes with a hose before signing off.
Step 5 before step 6 is not optional. Once glass is in, correcting the gutter fall means de-glazing. That reversal typically costs more than the gutter itself. Compare this sequence with new-build garden room packages, where step 1 and most of step 2 do not exist.
Standards, Certificates and Who Signs the Structural Calculation
Ask a factory for a “CE certificate” for a veranda and you should expect one of two answers: silence, or a certificate for something that is not the veranda. There is a specific reason for this, and understanding it changes what you ask for.
There is no harmonised product standard for a veranda
Windows have one – EN 14351-1, which is why the factory can send you a Declaration of Performance for every window you buy. Doors have one. Even aluminium structural components have one, EN 1090-1. But a veranda or a conservatory is classified as a building or part of a building, not as a construction product, so there is no route to CE-marking the assembly. What you can ask for, and should, is CE evidence for each component:
That the specific veranda layout is adequate for your wind and snow case
EN 1279-5 / -6 for insulating glass units
Long-term performance of the sealed unit, argon leakage ≤ 1% per year
Anything about mechanical retention overhead
EN 12600 pendulum classification
Breakage behaviour and fragment retention under impact
Load capacity – that is EN 16612 and a separate check
EN 14179 heat-soak test report
NiS-inclusion screening for toughened panes
Nothing; it only reduces one specific failure mode
EN 14351-1 Declaration of Performance (windows/doors only)
AEV performance, U-value, Rw for the opening elements
The roof system – outside this standard s scope
Qualicoat Class 1 / Class 2 (Seaside) licence
Batch-controlled pretreatment and powder film thickness and durability
Site behaviour; ISO 9227 salt spray is a batch ranking tool, not a life prediction
ISO 9001 factory certificate
Documented process control exists
Product quality on this order; it certifies the system, not the shipment
Who signs the calculation, by destination
Market
What is required
Practical allocation
EU (most states)
Structural verification to EN 1990 / EN 1991 / EN 1999 (Eurocode 9 for aluminium), submitted with the building permit application
Buyer s local engineer signs. Factory supplies loads, section properties and connection data in English
United Kingdom
Building Regulations compliance; often accepted by building control without a full set if documented calculations accompany the order
Fact ory can supply a calculation pack stamped by a China-based engineer for review, but the builder retains responsibility
United States
IBC / ASCE 7 design, sealed by a licensed Professional Engineer in the state of installation
A China engineer s stamp is not accepted. Budget USD 1,400-3,800 for local sealing, plus shop drawings in imperial units
Australia / New Zealand
NCC compliance, AS 1170 actions and AS 1664 aluminium structures; designer certification required for the site
Local certifier. Factory should supply AS-compatible section data and coating compliance to AS 3715 for metal finishes
Middle East
Usually employers requirements plus wind study; sometimes a specific authority approval
Factory supplies data; local consultant submits
Write it into the contract: “Supplier provides section properties, load assumptions and connection design data in English and metric; buyer is responsible for local structural review and permitting.” Both sides then know where their risk stops. Orders that leave this unallocated end with both parties assuming the other party checked the wind case.
Two further checks worth making on any quotation. First, if monolithic toughened glass is offered for the roof, ask what the containment measure is – see the conservatory glazing section above; there is no certificate that substitutes for it. Second, if you are buying glazed walls as part of the package, those individual window or door units do carry EN 14351-1 Declarations of Performance, and our page on aluminium window and door specifications shows what those documents list.
Extrusion, Coating and Assembly Sequence
Understanding the process tells you which changes are free and which ones cost money and time. A colour change is free. Changing the depth of a rafter by 10 mm requires a new die and typically re-runs the whole trial sequence.
Process chain and where the schedule actually goes
Stage
Typical calendar days
Note for buyers
Structural proposal and shop drawings
5-8
Iterative; this is where most of the delay lives
Buyer drawing sign-off
5-7
Often 16-20% of the total schedule; the only fully compressible item and entirely on your side
Extrusion die (only for new profiles)
10-18
One-off per section; USD 900-4,500 depending on complexity
Billet cast and extrusion run
4-7
Standard sections are stocked; bespoke needs a run slot
Ageing to T5 / T6 temper
1-3
T6 needs solution treatment plus 6-8 h artificial ageing
Cut, machine, drill, form corners
3-5
CNC centres; determines hole-position accuracy
Pre-treatment and powder coating
2-3
The quality-critical step despite being short
Glass procurement (external)
7-14
Usually the longest purchased lead item if laminated
Dry assembly of one full unit
1
Never skip it – see note below
Disassembly, packing, container loading
3-5
KD frames plus glass in A-frame crates
Coating parameters worth specifying
Parameter
Standard inland spec
Coastal / C5-M upgrade
Why it matters
Alloy / temper
6063-T6, 6060-T5 for slender sections
Same
6063 has the best extrudability and surface finish; 6061 costs more press capacity for no benefit here
Pre-treatment
Chromate-free zirconium-titanium conversion
Multi-stage plus sealed rinse
Filiform corrosion under the film starts here, not in the powder
Powder film thickness
60-120 μm (Qualicoat Class 1)
Same, Class 2 Seaside
Below 60 μm the coating loses its barrier; above 120 μm it chips on the edges
Curing
10-15 min at 200 ℃ metal temperature
Same
Under-cure shows as poor adhesion; over-cure as colour shift
Anodising alternative
AA15 minimum for external
AA20-AA25 for coastal
Harder surface, narrower colour range
Wood-effect sublimation
Qualideco / Qualicoat Class 2 substrate
Same
Popular for residential; costs more and slightly reduces UV stability
Ask for a dry assembly of one complete unit with photographs before the batch runs. One photo set catches more errors than every other inspection combined – and the most common error is not subtle: a component machined for the wrong glass build-up, so the pane sits proud of the rebate by 4-6 mm.
FOB Pricing by Configuration and Quantity
Prices below are FOB China per square metre of roof plan area, computed for the reference 15 m2 unit and quoted at four quantity tiers. They cover the aluminium frame kit, standard powder coat in a stock RAL colour, the specified roof glazing or panel, gutter with two downpipe outlets, flashings and standard packaging. They exclude permits, local structures, site works and taxes.
What the square-metre number covers
Included: aluminium frame kit, standard powder coat in a stock RAL tone, the specified roof glazing or insulated panel, one box gutter with two outlet spigots, abutment and verge flashings, standard export packing.
Excluded: civil works and pads, permit drawings, sealed local structural calculations, crane or access equipment, customs duty and anti-dumping, local taxes, installation.
Basis note: prices are quoted on roof plan area, not on glass area or on frame linear metres. Always convert to the same basis before comparing any two quotations – the difference between plan area and developed roof area alone is 5-12% depending on pitch.
Ref
Configuration (roof plan area basis)
1 unit
6 units
24 units
60 units
V1
16 mm PC roof, open sides, 4 posts
58
52
46
41
V2
Laminated glass roof, posts + beams only
142
128
115
104
V3
Glass roof + 2 fixed side walls
194
176
158
143
V4
Glass roof + sliding doors + 1 fixed wall
256
232
209
189
V5
Insulated roof panels + full glazing (conservatory)
318
288
260
236
V6
Motorised bioclimatic louvre roof
296
268
242
219
Read the tier steps rather than the headline number: the discount from 1 unit to 24 units is roughly 18-21% across all configurations, which comes mostly from spreading set-up and packing costs. If you are doing a development with identical verandas on every plot, standardising one configuration across all units is worth more than negotiating.
Options and their surcharges
Option
Surcharge
Qualicoat Seaside Class 2 (pre-treatment + powder)
+9 – 16 USD/m2
Wood-effect sublimation (Qualideco)
+24 – 38 USD/m2
SGP interlayer instead of PVB
+14 – 22 USD/m2
Heat-soak test per pane (EN 14179)
+4 – 7 USD/m2
Integrated LED channel + diffuser
+16 – 34 USD/m
Linear drain / gully connection kit
+38 – 62 USD/set
External motorised screen / awnings
+46 – 88 USD/m2
Zip screen vertical cassette
+72 – 130 USD/m2
Glass balustrade panels 8-1.52-8
+58 – 86 USD/m
Errection drawings + sealed structural calcs
+1,400 – 3,800 USD/project
Third-party inspection + load test
+950 – 2,400 USD/visit
Spare-parts kit 2% of value
+2.0%
The one recurring mistake in comparing quotations is the certificate pack. Sealed structural calculations, North American style sealed shop drawings and third-party inspection are per-project costs – they do not scale with quantity. On an order below about 150 m2 that is USD 8-18 per m2 of difference between two quotes that otherwise look identical.
MOQ, Lead Time, Payment, Packaging and Container Logic
Commercial terms
Item
Standard terms
Comment
MOQ
1 unit acceptable; production pricing from 15 m2 (one unit) upward
Sample units are priced at tier 1, not penalised further
Lead time
25-40 days from drawing sign-off and deposit
Add 10-18 days for a new extrusion die; add 7-14 days if laminated glass is not in stock
Payment
30% deposit, 70% against copy B/L; L/C at sight acceptable above USD 25,000
L/C adds roughly USD 180-320 in bank charges per shipment
Packaging
KD frames in plywood crates, glass vertical in A-frame crates with corner protectors
Bubble plus stretch is not adequate for 30+ days at sea in a humid hold
Warranty
10 years frame / coating, 5 years sealed units, 2 years moving parts
Coating warranty requires annual wash records; this is standard and worth knowing
Spare parts
2% of order value recommended
Most requested spares: gasket offcuts, cover caps, one spare pane per size class
Container logic: glass decides whether this is a heavy cargo
Scenario
Mass per 15 m2 unit
Volume per unit
Units per 40HQ
Footprint shipped
Freight (USD/m2)
Full kit incl. glass
645 kg
0.85 m3
41
616 m2
5.19
Frame only, glass sourced locally
138 kg
0.35 m3
193
2891 m2
1.11
Computed against a 40HQ working payload of 26,500 kg and about 76 m3 of usable volume, at USD 3,200 ocean freight to Rotterdam. The result is the opposite of what most buyers assume: a full veranda kit is weight-limited at 41 units per container, while the same kit shipped without glass is weight-limited at 193 units. The glass is 78% of the shipped mass and only 59% of the shipped volume.
Freight per square metre falls from USD 5.19 to USD 1.11 when glass is sourced locally – a saving of about USD 61 on a 15 m2 unit. Whether that is worth doing depends entirely on local laminated glass pricing, typically USD 45-70/m2 against Chinese USD 22-30/m2, so the trade only works on large projects where transport dominates.
Because the kit is weight-limited, knocking down for volume saves nothing. Unlike packaged door and window accessories, there is no empty space in a veranda crate to exploit.
The practical volume criterion is LCL versus FCL: below about 8-10 m3 (roughly 10-12 units) LCL rates per unit run 3.0-3.5 times the full-container equivalent. Below that threshold, consolidate the order or delay it.
Landed cost and what dominates it
Destination / duty regime
Config
FOB USD/m2
CIF
Duty & AD
Landed
Installed
Local supply
Delta vs local
EU (6% duty + 22.2% AD)
V2
142
147.2
42
189
247
372
-33.7%
EU (6% duty + 22.2% AD)
V3
194
199.2
56
255
313
448
-30.1%
EU (6% duty + 22.2% AD)
V4
256
261.2
74
335
393
545
-27.9%
EU, duty only
V2
142
147.2
9
156
214
372
-42.5%
EU, duty only
V3
194
199.2
12
211
269
448
-39.9%
EU, duty only
V4
256
261.2
16
277
335
545
-38.6%
USA (25% 301)
V2
142
147.2
37
184
242
372
-34.9%
USA (25% 301)
V3
194
199.2
50
249
307
448
-31.5%
USA (25% 301)
V4
256
261.2
65
326
384
545
-29.5%
USA (no additional)
V2
142
147.2
0
147
205
372
-44.8%
USA (no additional)
V3
194
199.2
0
199
257
448
-42.6%
USA (no additional)
V4
256
261.2
0
261
319
545
-41.4%
Australia (5%)
V2
142
147.2
7
155
213
372
-42.9%
Australia (5%)
V3
194
199.2
10
209
267
448
-40.4%
Australia (5%)
V4
256
261.2
13
274
332
545
-39.0%
The single largest lever in that table is not the product and not the sea freight. In the EU case, anti-dumping duty alone shifts the landed figure by roughly 33 USD/m2 – about 6 times the entire ocean freight cost of USD 5.19/m2, and more than the difference between the cheapest and most expensive roof configuration. Establish the customs classification with your broker before optimising the specification.
Installation Sequence and Commissioning
A veranda kit installs in about one to two days per unit with a three-person crew and no crane for standard panel sizes. Sequence matters more than speed in three places: gutter fall before glazing, wall flashing before closing the perimeter, and flood testing before handover.
Sequence
Set out from the building, not from the paving. Transfer two reference points off the existing facade and square from those.
Fix the ledger or consoles with the specified anchors; record torque values and photograph the exposed substrate at each fixing.
Erect posts, plumb and brace. Do not fully tighten the base connections until the roof plane is set.
Fit beams and rafters, then check the roof fall over the full depth of the run with a straightedge – target 5-15 degrees, never less than 3 degrees.
Install the gutter and confirm continuous fall along the whole run. Two outlets minimum.
Glaze the roof from the low edge upward, setting each pane on setting blocks and checking the rebate engage before moving on.
Fit side frames, doors and any screens. Adjust after the roof load is on – frames fitted before glazing commonly move 2-4 mm.
Complete flashings, upstands and verges. Seal with neutral-cure silicone only.
Flood test: run water at the gutter head for at least ten minutes and watch both outlets and the wall junction.
Commissioning checks worth signing off
Check
Method
Acceptance
Roof fall over full run
Spirit level plus straightedge
No flat or reversed section
Gutter fall
Level on the gutter sole
≥ 0.25% continuous toward both outlets
Downpipe discharge
Observe 10 minutes of flow
Both outlets discharging freely, no backup at the outlet
Wall junction
Hose the upstand from above, not into it
No water at the internal junction after 10 minutes
Glass seating
Check reveal gaps at four points per pane
Setting blocks in place, no glass-to-metal contact
Door operation
Open and close every sash five times
No contact, no drift, consistent closing force
Coating damage log
Visual at 2 m, all faces
Any through-film damage touched up before handover, not after
Failure Modes and Where They Start
Six problems account for the large majority of callbacks. Four of the six are decided at the point of order, not on site – which is the reason to spend the time on the specification rather than on the installation supervision.
The three that are bought rather than built
Three of the six entries below – the pane under snow, the condensation on the frame, and the coating breakdown – are not installation defects at all. They are consequences of a specification that never asked the right question, and no amount of supervision on site corrects them afterwards.
Failure
Where it starts
Mechanism
Cost to fix
Water overflowing the front of the gutter
Design / installation
Level gutter, or single outlet blocked. Conveyance at zero slope is zero.
Low before glazing, high after – often de-glazing
Water at the wall junction
Interface detail
No upstand, or flashing surface-stuck to render with acetic silicone
USD 240-700 plus making good the internal finish
Roof pane fractures under snow
Specification
Pane sized for UDL only; the 1.0 kN maintenance point load was never checked
One pane plus crane access, USD 600-1,600
Post settles or tilts
Ground / slab
Point load onto unreinforced patio slab without a pad
USD 900-2,400 – requires jacking the roof
Condensation on the aluminium, not the glass
Envelope decision
Heated space, uninsulated profile. Internal surface below dew point at 40% RH
Not fixable in place; needs frame replacement
Coating chalking or filiform corrosion within 3-5 years
Coating spec
Inland Class 1 used within 3 km of coast, or inadequate pre-treatment
Strip and re-coat, effectively replacement
What is genuinely left to the site
Three rows remain once the specification is right, and all three are about water: gutter overflow, the wall junction, and post settlement onto an unprepared base.
All three are verifiable within ten minutes on site with a hose – which is why the flood test in the commissioning table is not a formality.
None of them are affected by the frame supplier, which is the practical argument for keeping the two contracts separate: buy the kit on technical merit, and hold the installer to the drainage commissioning.
Rows 3, 5 and 6 are purchased problems. If the roof glazing is checked for the point load, the envelope option is written down before ordering, and the coating class matches the distance from the coast, the field failure list drops to three items – all of them about water, which is the one thing the installation can genuinely control.
Project Records: Rotterdam and Minneapolis
Case 1 – 24 verandas on a townhouse terrace, Rotterdam, Netherlands
Terraced new-build, 24 identical units, each 21 m2 of roof plan area (504 m2 total). Configuration V3: laminated glass roof, two fixed sides, open front onto the garden. Roof glass 6-1.52-6 Low-E; rafters R5 at 1.50 m centres against a 0.75 kN/m2 snow case, giving an allowable span of 2,072 mm against an actual span of 1,950 mm.
Item
Value
Catchment flow per unit at 110 mm/h
0.64 L/s
Gutter 150 × 90 at 0.5% fall
5.18 L/s capacity
Two ⌀ 90 outlets at 40 mm head
6.08 L/s total
FOB China, 24-unit tier (V3)
USD 158/m2
CIF Rotterdam (freight USD 5.19/m2)
USD 163.2/m2
Landed, 6% duty + 22.2% anti-dumping
USD 209.2/m2
Installed including local labour
USD 267.2/m2
Local Dutch supply quotation
USD 421/m2
Difference
-36.5%, USD 77,504 on 504 m2
Twelve-month record: three service calls, all minor (two roller adjustments, one cover cap). Zero gutter overflow events after the first autumn. One design change made in month two – four polycarbonate panels over the seating area were swapped for laminated glass because of rain noise, at a cost of USD 1,120. That change is a good example of the acoustic point earlier: it was possible only because the rafter grid had been set for glass in the first place.
Case 2 – 12 enclosed sunrooms, Minneapolis, United States
Ground snow load in this jurisdiction sits near 2.0 kN/m2, which puts the roof glass into a completely different regime. Configuration V5 with insulated roof panels and fully glazed walls; 12 units at 18 m2 each (216 m2 total).
Rafter section
Snow case
Allowable span at L/200
Stress utilisation
R1
2.0 kN/m2
1352 mm
48%
R2
2.0 kN/m2
1540 mm
42%
R3
2.0 kN/m2
1640 mm
40%
R4
2.0 kN/m2
1730 mm
38%
R5
2.0 kN/m2
2072 mm
37%
R6
2.0 kN/m2
2413 mm
36%
R7
2.0 kN/m2
2712 mm
32%
Item
Value
Roof glass selected
8-1.52-8 laminated, hef 11.31 mm
Allowable span at 2.50 kPa
2.11 m
Pane size used
2.00 m × 1.40 m
Point-load stress at 1.0 kN
11.7 MPa against 25.0 MPa limit
FOB China, 24-unit tier (V5)
USD 260/m2
Freight
USD 5.19/m2
Landed, 25% Section 301
USD 331.5/m2
Local PE sealing of calcs
USD 2,600 = USD 12.0/m2 across 216 m2
Installed
USD 401.5/m2
Local US supply quotation
USD 545/m2
Difference
-26.3%, USD 31,000 on 216 m2
The instructive part of this record is the 8-1.52-8 decision. At 2.50 kPa the 6-1.52-6 build-up is limited to 1.58 m of span, which would have forced a fourth rafter and 18% more aluminium. The thicker laminate allowed the wider grid and paid for itself. Note also that the saving here is smaller than in Rotterdam – the US project carried engineer sealing costs that do not scale, exactly as flagged in the procurement section.
Material Options and What the Comparison Actually Decides
The usual comparison table lists aluminium against timber, steel and uPVC. Most of that table is noise, because for a veranda four questions decide the material before any of the listed properties matter.
Attribute
Aluminium
Steel
Timber
uPVC-clad timber
Mass per m2 of roof structure
5-6 kg
11-14 kg
9-12 kg
10-13 kg
Span efficiency (I per kg)
High
Medium
Medium
Low
Corrosion behaviour
Needs correct coating class
Needs galvanising plus coating
Rot risk at ground contact
Stable, but steel core can corrode
Thermal break achievable
Yes, polyamide strip
Difficult
Inherent
Inherent
Coastal 3 km exposure
Class 2 Seaside or AA25
Hot-dip galvanised plus marine paint
High maintenance
Acceptable
Section consistency
Extruded, tight tolerance
Rolled, looser
Natural variation
Extruded core
Maintenance cycle
Wash annually
5-8 year repaint
2-4 year coating
8-12 years
Typical service life
40+ years
25-40 years with maintenance
20-35 years
25-35 years
Reading the table without fooling yourself
Two traps sit inside that table. The first is the mass row: aluminium looks like the obvious winner on weight, but on a veranda the frame mass is a small part of the total roof load – the glass at 31.8 kg/m2 dwarfs the 5-6 kg/m2 of profile, so the structural advantage is worth less than it appears. The second is the maintenance cycle row, which is a real cost but is usually compared against a discounted purchase price rather than against a 20-year total. The genuine aluminium advantage is not in the table at all: it is that an extrusion die makes the sixtieth unit identical to the first.
The four questions that decide it
Is the roof span over 3 m? If yes, aluminium or steel; timber sections get bulky and uPVC needs internal steel anyway.
Is the site within 3 km of the coast, or beside a pool with chlorinated water? If yes, aluminium with Class 2 Seaside or AA25, and A4 stainless fasteners.
Does the design draw a slim 40-50 mm sightline at the door heads? If yes, aluminium – timber and uPVC cannot hold that section at the span.
Does the project need a documented, repeatable product (multi-plot development)? If yes, aluminium, because the extrusion die makes unit 60 identical to unit 1.
If all four answers are no, the cheapest acceptable option is a legitimate choice and this table stops being relevant. Where the answer to any one is yes, the rest of the table is decoration. Similar reasoning applies when specifying the doors that close the veranda – see aluminium sliding door systems and our slide system comparison.
RFQ Checklist
Technical – send these eight
Roof plan dimensions, projection and desired pitch, plus which side the water must leave from.
Snow load, wind speed or pressure, and the site altitude and exposure class.
Distance from the coast, and whether a chlorinated pool is within the same building envelope.
Existing wall construction at the abutment, with a photograph and the insulation thickness.
Envelope decision: is the space heated? This single line changes the whole specification.
Roof build-up preference, or the U-value and g-value you need to hit.
Side configuration: open, fixed glazing, sliding, folding, or screens.
Drainage: existing gully position and invert level, or provision for a new one.
Commercial – send these eight
Quantity and delivery split (how many units, how many shipments).
Target delivery date and whether it is fixed or flexible.
Destination port, and who handles customs clearance.
Whether the customs classification has been confirmed with your broker.
Whether sealed structural calculations are required, and in which jurisdiction.
Packaging requirements, particularly if the site has no forklift.
Warranty period expected and whether extended cover is needed.
Spare parts and any requirement for an on-site training visit.