Janelas de alumínio, janelas de correr – aluminum sliding windows – are the default residential opening in Brazil and a standard retrofit item in Portugal: two to four leaves running on twin tracks, a mosquito screen mounted on the frame at the factory, and tempered glass as standard. This article documents the Brazilian sizing modules, NBR 15575 performance compliance, thermal-break system construction, U-values, FOB price bands, container loading, and the full import cost stack at a Brazilian port, with data tables for each step.

FOB price
$95–320/m²
U-value (window)
1.6–2.8 W/m²K
Profile wall
1.4 / 1.8 / 2.0 mm
MOQ
20–50 m²
Lead time
30–40 days
Contents
1. ABNT Standards
2. Sizing Modules
3. Thermal Zones
4. Profile & Thermal Break
5. Performance Data
6. Glass Configurations
7. Mosquito Screen & Finish
8. Procurement Terms
9. Import Cost to Brazil
10. São Paulo Case
11. Sliding vs Alternatives
12. RFQ Checklist
13. PT Glossary

ABNT Standards That Govern Janelas de Correr

Brazil does not import frames under loose factory specs. The ABNT (Associação Brasileira de Normas Técnicas) standards below are the reference set a buyer should paste into the purchase order, and every performance number later in this article traces back to one of them.

Standard Scope What the buyer checks
ABNT NBR 10821-1 Window definitions and classification Series, leaf count, type of sliding set (2T/3T tracks)
ABNT NBR 10821-2 Dimensions and dimensional compatibility Nominal opening modules and tolerances
ABNT NBR 10821-3 Laboratory test methods Air, water, wind test setup for the series
ABNT NBR 15575-4 Habitational performance – fenestration Compliance limits: air leakage ≤ 3.0 m³/h·m², water ≥ 100 Pa at ≤ 9 m facade height
ABNT NBR 6123 Wind loads on structures V0 basic wind speed per municipality, used to size pressure class
ABNT NBR 7199 Glass in building – design Glass thickness vs pane size and wind load
ABNT NBR 6484 Concrete – compression tests Referenced for fixing-substrate pull-out checks on site
ABNT NBR 15220 / RTQ-R Thermal performance of buildings Climate-zone U-value and SHGC targets

For Portugal, the export build is CE marked under EN 14351-1 with declared performance for U-value, air permeability and water tightness, so the same frame ships to Lisbon or Porto without re-engineering. Brazilian buyers should ask the factory for the test report numbers behind each declared value – a report issued under NBR 10821-3 with the actual series designation is worth more than a brochure.

Certification and Test Report Package

Sizing Modules and Leaf Count for Brazilian Openings

Standard Opening Modules

Brazilian residential construction works on 10 cm masonry modules, and fenestration follows. The most ordered sliding window sizes for apartments and condomínios are:

Opening W×H (mm) Typical layout Leaves Net vent (2 leaves sliding) Common room
1000×1200 2 leaves, 2 tracks + screen 2 500 mm bedroom, kitchen
1500×1300 2 leaves, 2 tracks + screen 2 750 mm bedroom, living
2000×1400 2 or 3 leaves, 2 tracks 2-3 1000 mm (2L) / 1330 mm (3L) living room
2000×1500 3 leaves, 2 tracks + screen 3 1330 mm living room
2400×1500 4 leaves, 2 tracks 4 1200 mm living room
2000×2100 2 tall leaves, reinforced stile 2 1000 mm balcony access

A three-leaf, two-track window leaves two leaves overlapped on one track; effective ventilation is two thirds of the opening. Four-leaf two-track gives half. If full opening matters, a four-leaf three-track frame clears the entire span but adds frame depth and $18-30/m².

Ventilation Area Rules

Climate Zones and Thermal Requirements (RTQ-R)

Brazil is divided into eight bioclimatic zones (Z1 to Z8) under ABNT NBR 15220 and the national efficiency regulation RTQ-R. The window U-value limit tightens as you move south, while SHGC dominates in the tropical north. Typical values applied in specifications:

Zone Representative region Facade U-value limit (residential) Priority for janelas de correr
Z1-Z2 Sul (Curitiba, Caxias do Sul), serrana ≤ 2.5-3.0 W/m²K Thermal break + double glazing mandatory
Z3 São Paulo city, Campinas ≤ 3.0 W/m²K Thermal break recommended; Low-E pays back
Z4 Belo Horizonte, interior SP ≤ 3.5 W/m²K Double glazing; break optional on north faces
Z5-Z6 Rio de Janeiro, Salvador ≤ 4.0 W/m²K Solar control: SHGC ≤ 0.40 on west/north glass
Z7-Z8 Manaus, nordeste equatorial ≤ 4.5-5.5 W/m²K Ventilation sizing and SHGC, not U-value
Solar gain note: in Z5-Z8 the air-conditioner bill is driven by SHGC, not by U. A 5 Low-E + 12A + 5 unit (SHGC 0.38-0.45) on west-facing glass cuts cooling load far more than upgrading the frame from 14 mm to 24 mm thermal break. In Z1-Z3 the order reverses: pay for the break and the glass first.

Condensation and Edge Details

Condensation risk appears only in Z1-Z3 and in air-conditioned interiors everywhere: the frame edge reaches 60-70% of room temperature. The two countermeasures are the warm-edge spacer (cuts edge U by about 0.2-0.3 W/m²K) and continuous EPDM at the glazing rebate. For Z1-Z2 projects, specify 24 mm break minimum plus warm-edge spacer and keep interior RH below 60%.

The sliding windows specified in this article reach whole-window Uw of 2.8 W/m²K with a 14 mm break, 2.1 with a 24 mm break and 1.6 with 34 mm break plus Low-E – every row clears the strictest Brazilian facade limit with margin.

System Construction: Alloy, Thermal Break, Finish, Rollers

Aluminum Alloy and Wall Thickness

Parameter Standard build Reinforced build Spec basis
Alloy / temper 6063-T5 (≥ 160 MPa) 6063-T6 / 6061-T6 (≥ 205-260 MPa) GB/T 5237, mill certificate
Profile wall 1.4 mm 1.8-2.0 mm NBR 10821-2 minimum for leaf stiles
Frame depth 70-90 mm 100-120 mm Thermal-break series
Leaf height limit ≤ 2200 mm ≤ 2700 mm Per stile deflection L/175
Leaf weight 35-50 kg 55-80 kg Calculated at 2.5 kg/m² per glass mm + frame

Thermal Break System

The break strip is PA66GF25 – polyamide 66 with 25% glass fiber – rolled into knurled cavities at 230-250 °C, then crimped. Widths in this article’s series: 14 mm (basic), 24 mm (the volume seller for Z3-Z4), 34 mm (Z1-Z2 and Passivhaus-adjacent builds). Polyurethane-poured breaks are not used on sliding systems: the pour-and-debridge process limits leaf length and complicates the drainage cavities.

Surface Treatment Parameters

Finish Film / layer Standard Salt-spray result
Anodized natural / bronze 10-20 μm (AA10-AA20) Qualanod Passes 1000 h ASTM B117 at AA15+
Powder coat RAL 60-80 μm Qualicoat class 1-2 Passes 1000 h; seaside duplex 120 μm for coastal
Wood-grain sublimation 20-40 μm over 80 μm base Qualicoat + film bond 200 °C / 8 min Passes 1000 h; adds $8-15/m²
PVDF fluorocarbon 25-35 μm AAMA 2605 route Specified for high-UV coastal towers

Brazilian stock colors: natural anodized silver, preto (black), antracite (RAL 7016) and branco (RAL 9016). Dark colors on west faces in Z5-Z8 should carry 80 μm minimum; powder over 100 μm slows production by 1-2 days.

Drainage and Air-Seal Detail

Each track carries two weep channels with a 5° inward slope and a 6 mm slot; the interlock line combines a twin-line brush with an EPDM fin. Frame-to-wall sealing on site uses a butyl tape backer plus one neutral-cure silicone bead outside and one inside. This detail is what keeps the measured air leakage at 1.6-2.2 m³/h·m² instead of the 3.0 m³/h·m² compliance ceiling.

Rollers, Tracks and Cycle Life

Hardware Specification Selection rule
Single-bearing roller 60-90 kg per pair, nylon rim + steel bearing Use when leaf ≤ 45 kg
Double-bearing roller 100-130 kg per pair Leaf 45-80 kg; tall 2100 mm units
Track Stainless-capped or hard-anodized rail Stainless cap doubles cycle life on sand-heavy sites
Cycle rating 50,000 open-close cycles tested (EN 12400 route) ≈ 34 years at 4 cycles/day
Interlock Twin-line brush + EPDM fin Air leakage ≤ 2.0 m³/h·m² at 100 Pa
Lock Hook lock with push button, optional cylinder Cylinder + key adds $4-7 per leaf

Roller selection rule: divide the calculated leaf weight by the roller pair rating and keep the result at ≤ 0.6-0.77, i.e. a 30-40% dynamic reserve. A 2.0×1.4 m leaf with 5+12A+5 glass weighs about 38 kg; the single-bearing 60 kg pair leaves 37% reserve – acceptable. The 2.0×2.1 m leaf at 55 kg forces the double-bearing set.

Mosquito Screen Options

NBR 15575 Performance: Compliance Table

ABNT NBR 15575-4 sets the minimum fenestration performance for habitational buildings: air permeability ≤ 3.0 m³/h·m², water tightness ≥ 100 Pa for facades up to 9 m (recommended 150 Pa in coastal exposure), wind-load safety checked against NBR 6123 wind speeds, and resistance to repeated opening loads. The table compares the compliance floor with measured values of the 24 mm thermal-break sliding series:

Indicator NBR 15575-4 requirement Series measured value Result
Air permeability at 100 Pa ≤ 3.0 m³/h·m² 1.6-2.2 m³/h·m² Pass
Water tightness ≥ 100 Pa (≤ 9 m facade) 300-450 Pa Pass (2-3× margin)
Water tightness (coastal rec.) ≥ 150 Pa 300-450 Pa Pass
Wind-load safety (V0 40 m/s zone) resist design pressure 2000-2500 Pa test (P class) Pass
Resistance to repeated load no functional damage 10,000 cycles, no change Pass
Sound insulation Rw no fixed minimum (site driven) 30-33 dB double / 35-38 dB laminated ISO 10140 route

Reading the Compliance Numbers

Acoustic Data (Rw)

Build Rw (dB) Use case
5 + 12A + 5 clear 30-31 Quiet suburban sites
5 + 12A + 5 Low-E 31-33 Traffic at 30-50 m
6 laminated + 12A + 5 35-36 Avenida / BRT frontage
6 laminated + 9A + 5 asym. 37-38 Airport / rail proximity

For comparison across other opening types, see the sliding door wholesaler spec sheet and the acoustic configuration tables in the windows-and-doors pack article.

Glass Configurations and Solar Control

IGU Options

Configuration Center Ug (W/m²K) SHGC Weight (kg/m²) FOB adder (USD/m²)
4 + 12A + 4 clear 2.8 0.76 20 base
5 + 12A + 5 clear 2.7 0.74 25 +6
5 Low-E + 12A + 5 clear 1.9 0.42 25 +18
5 Low-E + 12A + 5 (argon) 1.6 0.40 25 +24
6 lamin. + 12A + 5 Low-E 1.8 0.38 32 +34
5 + 9A + 5 + 9A + 5 triple 1.2 0.52 35 +52

Tempered Glass and Edge Work

Solar Control by Orientation

West and north glass in Z4-Z8 should be specified with SHGC ≤ 0.42 (Low-E or spectrally selective coating). Reflective glass (SHGC 0.25-0.35) works on tower facades but darkens interiors and is discouraged at residential scale. Roof-facing or heavily shaded openings can stay at clear double glazing and save $18-24/m².

Mosquito Screen and Finish Differences: Brazil vs Portugal

Brazil: Screen on the Frame, Always

The Brazilian janela de correr is ordered as a system: frame, leaves, glass, and a fiberglass mosquito screen mounted on the frame at the factory. The screen typically runs on its own small track or clips inside the outer frame flange. Importing windows without screens is a specification error for Brazil – the local fabricator retrofit costs 2-3× the factory adder and delays the deliverable.

Portugal: Shutters and Blinds Instead

Portuguese openings pair with estores (roller shutters) or persianas (venetian blinds) in a dedicated box above the frame; sliding windows there are specified with a reinforced head to carry the shutter box or with a separate blackout box. Mosquito screens are optional, ordered mostly for ground floors. The same aluminum sliding window serves both markets – the difference is the head detail, the finish palette (RAL 7016 and oak wood-grain dominate in Portugal) and the screen decision.

Procurement Terms, Packing and Container Loading

Commercial Terms

Item Term
MOQ 20-50 m² per model (sample orders accepted at 10-15 m²)
Lead time 30-40 days after deposit + shop-drawing sign-off
Payment T/T 30% deposit / 70% against BL copy; L/C at sight for 1×40HQ+ orders
Drawings PDF shop drawing + DXF on request; 5-7 days first round
Sample 1 window 1500×1300 in 18-20 days, credited back at 200 m²+
Warranty 10 years profile and coating; 2 years hardware; glass per SELO data

Packing Specification

Documents for Import

Sample First, Then Scale

Run a 10-15 m² sample order (one of each opening type on the schedule) before the container. Check on the sample: corner squareness ≤ 1.5 mm over 2 m, leaf gap 3 ± 0.5 mm, roller feel under full glass load, screen fit, and the gasket continuity at all four corners. Sample cost is credited back at 200 m²+ orders with most factories.

Import Cost Stack: FOB to a Brazilian Port

Brazilian taxes stack on CIF (FOB + freight + insurance). The table runs a mid-build sliding window (24 mm break, 5+12A+5, FOB $165/m²) through Santos with 18% ICMS and the cumulate PIS/COFINS rates:

Cost line Rate / basis USD per m²
FOB China quoted 165.00
Ocean freight (40HQ, Santos) ≈ $130/m² of container ÷ load 22.00
Marine insurance 0.3% of CIF 0.60
II – Import duty 14% of CIF 26.30
IPI 5% of CIF + II 10.70
PIS/COFINS (cumulate) 9.25% of CIF 19.80
ICMS 18% (SP) 18% / (1 – 0.18) on above subtotal 54.60
Port, SISCOMEX, despachante lump sum ≈ $35/m² at container scale 35.00
Total landed, before state VAT credit – ≈ 334
Budget note: the landed figure above is a planning number. Real ICMS treatment, PIS/COFINS credits and the Simples regime depend on the importer’s tax profile – most buyers land sliding windows between 1.9× and 2.1× FOB, i.e. $315-350/m² for this build. Even at the high end it compares with R$ 1,900-2,400/m² quoted by local mid-market fabricators for the same 24 mm thermal-break spec.

Landed Cost per Window

Convert to per-window terms for budgeting: the 1500×1300 bedroom set (1.95 m²) lands at about $655 per unit including taxes and port fees; the 2000×1400 living set (2.8 m²) lands at about $940. Compare against local fabricator quotes at R$ 4,200-5,400 and R$ 6,000-7,800 respectively for the same 24 mm series with Low-E glazing.

Retail Margin Reality Check

Case Study: 118 Windows, Campinas Residential Tower

A 12-floor residential tower in Campinas (Z3, V0 ≈ 40 m/s) ordered 118 sliding windows – 286 m² – split between 1500×1300 bedroom sets (64 units) and 2000×1400 living sets (54 units), all in the mid build: 1.8 mm wall, 24 mm PA66GF25 break, 5 Low-E + 12A + 5, factory-mounted screens, anodized silver frames.

Delivered Numbers

Line item Local quote Import build
FOB / list price R$ 2,150/m² (≈ $400) $165/m² FOB
Landed at São Paulo state – ≈ $335/m²
Installation (local crews) R$ 140/m² (both routes) R$ 140/m² (both routes)
Total installed ≈ $455/m² ≈ $372/m²
Project total (286 m²) ≈ $130,100 ≈ $106,400

Warranty and Service Model

The warranty in the PO covered 10 years on profile and coating, 2 years on hardware and rollers, and the declared glass data. Service was handled by the installing contractor with a parts box shipped inside the container: 4 spare roller pairs, 2 handle sets and 10 m of brush gasket. That parts box cost $90 and covered every site call in the first year – order it as a standard line.

Sliding vs Casement vs Maxim-Ar vs Fixed

Criterion Sliding (correr) Casement Maxim-Ar (projected) Fixed
Air tightness Good (brush seals) Best (EPDM compression) Good Best (no moving part)
Water tightness 300-450 Pa 500-700 Pa 350-500 Pa 600+ Pa
Ventilation 50-100% of opening Max 90° sash swing ≈ 50% (fixed glass top) 0%
Cost (USD/m² FOB) $95-320 $130-340 $120-260 $80-180
Screen integration Factory-fitted, standard Retrofit magnetic screen Retrofit n/a
Maintenance Rollers every 3-5 y Hinges every 5-8 y Friction stays 5-8 y None
Best use Living, balcony access, wide bays Bedrooms needing seal Bathrooms, kitchens Composition, light

Choose sliding where the opening is wide and ventilation must span the full bay; choose casement where the opening is narrow and sealing leads; maxim-ar splits the difference at mid cost. The aluminum sliding window supplier page lists the full series chart, and the sliding door selection guide covers the door-side equivalents.

When Not to Choose Sliding

RFQ Checklist for Janelas de Correr

Technical Lines (paste into the RFQ)

  1. Opening schedule: width × height × quantity × room, per floor plan module.
  2. Series: 2-track or 3-track; leaf count per window; screen type (fixed perimeter / rolling).
  3. Profile: alloy 6063-T5/T6, wall 1.4 / 1.8 / 2.0 mm, frame depth 70-120 mm.
  4. Thermal break: PA66GF25 width 14 / 24 / 34 mm (or non-broken for Z7-Z8 interior walls).
  5. Glazing: build from the IGU table, Low-E on which faces, tempered and laminated positions.
  6. Finish: anodized AA15 / RAL code / wood-grain; film class for coastal exposure.
  7. Hardware: roller class per leaf weight; hook lock; cylinder option; handle finish.
  8. Performance: air ≤ 2.0 m³/h·m², water ≥ 300 Pa, wind per NBR 6123 design pressure, Rw target if any.

Commercial Lines

  1. Incoterm and port: FOB Yantian / Shekou or CIF Santos / Itajaí / Lisboa.
  2. Packing: ISPM-15 crates, per-window labeling, hardware boxes inside crates.
  3. Payment 30/70 or L/C; deposit after drawing sign-off.
  4. Delivery date against deposit date; partial shipment allowed or not.
  5. Spare parts kit: 2 rollers + 1 set gaskets per 100 windows.
  6. Warranty letter: 10 years profile/coating, 2 years hardware, glass per declared data.

Mini-Glossary: Portuguese Terms That Move Orders

Portuguese English Where it appears
Esquadria de alumínio Aluminum frame/fenestration PO and drawing title block
Janela de correr Sliding window This article’s core term
Vidro temperado Tempered glass All leaves and large panes
Vedação Gasket / sealing EPDM or brush line items
Película de controle solar Solar-control film / coating Low-E or reflective options
Mosqueiro / tela Mosquito screen / mesh Brazilian standard adder
Estor / persiana Roller shutter / venetian blind Portugal head detail
Régua de corte térmico Thermal break strip PA66GF25 width spec
Puxador Handle Hardware kit list
Ua / coeficiente de transmitância U-value / transmittance RTQ-R compliance sheets

For the full platform view – shared extrusion dies, hardware and seal profiles across windows and doors – see the brand systems article, the aluminum doors and windows overview, and the sliding-system construction detail in the slide systems manufacturer post.

[footer_contact_form]