Prefab House Export from China: Sandwich Panel U-Values and FOB Pricing
Two-module prefab house with insulated sandwich panel cladding and thermal break aluminium windows.
Prefab house refers to a dwelling whose structure and envelope are manufactured in a factory as cassettes or volumetric modules and assembled on a prepared foundation. The engineering questions that decide the delivered cost are transport geometry, envelope U-value, joint thermal bridging and the window specification. This article documents all four with calculated numbers: sandwich panel U-values per EN 14509, whole-window U-values per EN ISO 10077-1, a 120 m2 reference house heat-load calculation, container loading arithmetic, USD price tables, production parameters, certification paths, procurement terms, the erection sequence and delivered project data for prefab houses sourced from China. Structural checks use E = 210,000 MPa for S350 GD+Z light steel and 69,000 MPa for 6063-T5 aluminium.
Prefab House Structural Systems – Module Grid, Frame and Lifting Loads
A prefab house is dimensioned by the transport envelope before it is dimensioned by the floor plan. Decide the shipping mode first, because a module 100 mm too tall changes the freight cost by a factor of three.
Module Grid and the ISO Transport Envelope
Three shipping modes are available. Volumetric modules ship complete on a flat rack or as breakbulk. Flat-pack cassette sets ship inside standard containers. Container-derived units reuse ISO corner castings. The controlling dimensions are the 40HQ internal height of 2.69 m and the door opening of 2.34 m width.
Mode
Unit size (m)
Payload per 40HQ
Freight $/m2 floor
Typical use
Volumetric module
6.06 x 2.44 x 2.90
1-2 units on flat rack
150-320
Resort, remote site
Flat-pack cassette
6.0 x 3.0 x 0.35
2-3 units (36-54 m2)
41-125
Standard housing
ISO container unit
6.06 x 2.44 x 2.59
2 units, 30 m2
105-210
Site camp, pop-up
The ISO 20 ft module at 2.896 m overall height does not pass a 40HQ door at 2.69 m internal height. This single dimension is the reason most volumetric exporters quote flat rack rates. Flat-pack is the default for a cost-driven project.
Weight, not volume, sets the container count. A 6.0 x 3.0 m module packs to 19.9 m3 (floor cassette 6.30 + roof cassette 6.30 + wall panels 7.29), so a 76 m3 40HQ fits 3.8 modules by volume. At 8 t per module the 26 t payload caps it at 3 units = 54 m2. At 9-11 t it drops to 2 units = 36 m2. Specify the cassette weight before you price the freight.
Light-Steel Floor Joist Check – C200 x 70 x 20
Floor cassettes use S350 GD+Z lipped C-sections at 600 mm centres. For a 3.0 m span carrying EN 1991-1-1 Category A residential loading the check is as follows. Characteristic loads: live 2.0 kN/m2, finishes 0.5 kN/m2, self weight 0.15 kN/m2. At 600 mm centres the line load on one joist is 1.59 kN/m, giving M = wL2/8 = 1.789 kN.m.
Wall
I (mm4)
W (mm3)
sigma (MPa)
delta (mm)
Span ratio
Verdict
2.0 mm
4.077e6
40,770
43.9
1.96
L/1532
Pass
1.5 mm
3.069e6
30,690
58.3
2.60
L/1153
Pass
1.2 mm
2.451e6
24,510
73.0
3.26
L/921
Pass
Allowable stress is 205 MPa and the EN 1993-1-1 deflection limit for floors is L/250 = 12 mm. All three walls pass with a factor of 2.8 to 4.7 on stress and 4 to 12 on deflection. Bending is therefore not the governing case for a prefab house floor cassette.
Four-Point Lifting and Corner Casting Loads
The governing load case is the crane lift, not occupancy. A 12 t module weighs 117.7 kN. With a four-point lift and slings at 60 degrees to horizontal, each sling carries 29.4 kN vertical and the sling tension is T = 29.4 / sin 60 = 34.0 kN. The horizontal component pulled into each top corner is 29.4 / tan 60 = 17.0 kN.
Top side rails must be checked for 17.0 kN axial compression plus the bending from the sling eccentricity, not for residential floor loading.
Corner castings are specified to ISO 1161 and must be welded to a continuous column, not to the panel skin.
Web crippling at the sling bearing point governs the bottom rail: check EN 1993-1-3 clause 6.1.7 with a bearing length of 50 mm.
Transport g-loading adds a 0.3 g horizontal and 0.7 g vertical case for road and sea motion.
Specify the lifting scheme in the contract. A factory can build a cassette that passes every occupancy check and still fails on the first crane lift if the top rail is not continuous.
Prefabricated House Envelope – Cassettes, Air Barrier and Joint Schedule
A prefabricated house only performs to its calculated U-value if the air barrier is continuous across every cassette joint. The insulation thickness matters less than the joint detailing.
Wall, Roof and Floor Cassette Build-Ups
Three cassette types make up the envelope. Each is a closed panel with a structural frame, insulation and both facing layers fitted in the factory, so the site operation is a mechanical fix and a seal, not a wet trade sequence.
Cassette
Frame
Insulation
Facings
Thickness
Weight kg/m2
U W/m2K
Wall
C140x50x1.5 @600
140 mm rock wool
0.5 steel + 12.5 board
180 mm
38
0.255
Roof
C200x70x2.0 @600
200 mm PIR + 40 mm
0.6 steel + 15 mm OSB
280 mm
46
0.120
Floor
C200x70x2.0 @600
200 mm PIR
18 mm cement board both sides
260 mm
52
0.108
Party wall
C140x50x1.5 @600
2 x 60 mm rock wool
2 x 15 mm board
200 mm
54
0.193
The roof cassette carries the highest insulation load because it is also the stiffest diaphragm. Floor cassettes use cement board rather than OSB in wet rooms; specify this explicitly because the substitution costs 4-6 USD/m2 and is rarely offered by default.
Air Tightness – n50 Targets and Blower-Door Arithmetic
Measured air permeability is reported as n50 in air changes per hour at 50 Pa. For the 120 m2 reference house with V = 324 m3 and a total envelope area of 410 m2, the conversion between n50, the leakage flow and the area-normalised q50 is:
n50 (1/h)
Q50 (m3/h)
q50 m3/(h.m2)
Average ACH (n50/20)
Infiltration W/K
0.6
194
0.47
0.030
3.2
1.0
324
0.79
0.050
5.3
2.0
648
1.58
0.100
10.7
3.0
972
2.37
0.150
16.0
5.0
1620
3.95
0.250
26.7
The Passive House Institute limit is n50 of 0.6 h-1. Most national building codes accept q50 of 5.0 m3/(h.m2). Factory-built envelopes reach n50 of 0.6 to 1.5 routinely because the joints are made on a bench rather than on scaffolding. Going from n50 5.0 to n50 1.0 removes 21.4 W/K of infiltration loss, which at a 2,700 K.d heating season is 1,387 kWh/a.
Write the n50 number into the contract as a testable value. Specify a blower-door test to EN ISO 9972 at handover with a measured n50 not exceeding 1.0 h-1, and hold 5 percent of the contract value against it. Without a test clause the number is marketing, not a specification.
Cam-Lock Joint Thermal Bridge
Cassette joints use cam-lock fasteners that pull both steel facings into contact. Where the two 0.5 mm steel faces touch, the insulation is bypassed by a highly conductive path. The linear thermal transmittance of that joint is the psi value, and over 100 m of joint line it is significant.
Joint detail
psi (W/mK)
Loss over 100 m (W/K)
Share of house UA
Steel-to-steel cam-lock
0.15
15.0
13.8%
Standard sealed spline
0.10
10.0
9.2%
Insulated cam-lock + pad
0.05
5.0
4.6%
Thermal isolator spline
0.03
3.0
2.8%
Against a reference total of 108.6 W/K, an unbroken steel cam-lock joint adds 13.8 percent to the whole house heat loss. The fix is a 6 mm aerogel or rigid PU isolator pad at each cam-lock, which costs 0.8-1.5 USD per fastener and returns 10 W/K.
Container Houses – Cut-Out Reinforcement and Window Integration
Container houses reuse an ISO freight container as the primary structure. The corrugated side panel is a stressed skin, so every opening is a structural intervention and must be framed.
Side-Wall Shear Loss and Header Sizing
A 20 ft container side wall is 12.192 x 2.591 m = 31.59 m2. A 2400 x 1200 mm window opening removes 2.88 m2, which is 9.1 percent of the diaphragm. The 1.6 mm SPA-H corrugated panel (yield 345 MPa) provides shear stiffness for racking; the corner posts carry the vertical load. Removing panel area therefore reduces racking resistance, not gravity capacity. The header over the opening must be sized for the load above it.
For a 2.4 m header carrying one roof plus one stacked unit at an upper-bound line load of 2.0 kN/m, the mid-span moment is M = wL2/8 = 1.44 kN.m and the required section modulus at 215 MPa allowable is 6,698 mm3.
Header section
Ix (mm4)
Wx (mm3)
sigma (MPa)
Utilisation
RHS 100 x 50 x 3.0
1.121e6
22,424
64.2
30%
RHS 120 x 60 x 4.0
2.552e6
42,533
33.9
16%
RHS 150 x 100 x 4.0
6.173e6
82,308
17.5
8%
RHS 100 x 50 x 3.0 is sufficient at 30 percent utilisation, so the constraint is not stress but the weld detail: the header must be continuously welded to the surviving corrugation on both faces, and the vertical jamb members must run full height to the bottom rail to restore the load path.
Window and Door Cut-Out Detailing
Cut with plasma or laser, not oxy-fuel: the heat-affected zone on 1.6 mm Corten reduces the local yield and seeds corrosion.
Frame the opening with RHS welded to the corrugation crest, never to the valley.
Allow a 10 mm reveal between the container steel and the aluminium window frame to break the thermal and galvanic path.
Fit a compression gasket rather than silicone: a container flexes during transport and silicone tears.
Re-apply zinc-rich primer and a two-coat polyurethane system to all cut edges before the frame goes in.
Container steel is Corten SPA-H, which is cathodic to aluminium. Direct contact drives galvanic corrosion of the window frame. The 10 mm reveal plus a nylon or EPDM isolator shim is not optional detail, it is the difference between a 5-year and a 25-year window life.
Corrosion and Coating Specification
Element
Preparation
System
DFT (micron)
Life to first maintenance
Container shell
Sa 2.5 blast
Zn-rich epoxy + PU topcoat
240
15-20 yr
Cut edges
Grind St 3
Zn-rich primer + 2 PU coats
200
10-15 yr
RHS frame
Mill scale removal
Epoxy zinc phosphate
120
15 yr
Aluminium frame
Chrome-free pre-treat
Powder coat Qualicoat Class 1
60-80
25 yr
Aluminium frame (coastal)
Chrome-free pre-treat
PVDF 70 percent
40-50
30 yr
Sandwich Panels – EPS, PU/PIR and Rock Wool Compared
Sandwich panels are the standard prefab house cladding and the single largest lever on envelope U-value per dollar spent. The choice between core materials is a fire and acoustics decision as much as a thermal one.
U-Value by Core and Thickness – EN 14509 / ISO 6946
Values below are calculated as U = 1 / (Rsi + d/lambda + Rse) with Rsi = 0.13 and Rse = 0.04 m2K/W, insulation core only, facings ignored. EN 14509 additionally requires a joint factor for cam-lock panels.
Core (lambda W/mK)
50 mm
75 mm
100 mm
150 mm
200 mm
EPS (0.038)
0.673
0.466
0.357
0.243
0.184
PU / PIR (0.022)
0.409
0.279
0.212
0.143
0.108
Rock wool (0.040)
0.704
0.489
0.375
0.255
0.193
PU/PIR reaches U 0.212 at 100 mm where EPS needs 175 mm and rock wool needs 185 mm. The practical consequence is floor area: at a 120 m2 house with 140 m2 of wall, moving from 100 mm EPS to 100 mm PIR reduces the wall heat loss from 50.0 W/K to 29.7 W/K and adds roughly 1.1 m2 of internal floor area on a 6 x 3 m module because the wall is 75 mm thinner.
Reaction to Fire and Fire Resistance
Core
Reaction to fire (EN 13501-1)
Fire resistance 100 mm
Smoke
Habitable approval
EPS
E (B-s1,d0 with FR additive)
None – melts at 100 C
s2-s3
Rarely accepted
PU
B-s2,d0
EI 20-30 min
s2
Conditional
PIR
B-s1,d0
EI 30-45 min
s1
Commonly accepted
Rock wool
A2-s1,d0
EI 60-120 min
s1
Accepted all uses
Rock wool is the only core that is non-combustible. For a habitable two-storey prefab house, and for any unit within 1 m of a boundary, specify A2-s1,d0. The cost premium over PIR is 4-7 USD/m2 of panel, and the U-value penalty at equal thickness is offset by moving from 100 mm to 150 mm.
Wind Uplift, Snow and the Fastener Schedule
Roof panels must resist net uplift. Velocity pressure is q = 0.613 v2; with an external pressure coefficient of -1.2 in the corner zone and an internal coefficient of +0.2, the net factor is 1.4.
Gust speed
q (kPa)
Net uplift (kPa)
Fastener load @300×600 (N)
Note
30 m/s
0.55
0.77
139
Inland temperate
35 m/s
0.75
1.05
189
Exposed inland
40 m/s
0.98
1.37
247
Coastal / typhoon
45 m/s
1.24
1.74
313
Miami-Dade HVHZ
50 m/s
1.53
2.15
387
Cyclone region
Panel self weight for a 100 mm PIR roof with 0.5/0.5 mm steel facings is about 0.14 kPa, so at 1.37 kPa net uplift the panel is being pulled off with roughly ten times its own weight. Anchorage is not optional. A self-tapping screw into 2.0 mm steel has a pull-out capacity of 1.5-2.5 kN against a demand of 247 N, so the fastener is not the weak link – the steel purlin flange thickness is. Specify 2.0 mm minimum purlins and do not let the value engineering stop at 1.5 mm.
Panel thickness
60 mm
80 mm
100 mm
120 mm
150 mm
Max roof span (1.25 kPa)
1.8 m
2.4 m
3.0 m
3.5 m
4.2 m
Max wall span (1.0 kPa)
2.6 m
3.4 m
4.2 m
5.0 m
6.0 m
Acoustic Performance and Flanking
Sandwich panels are mass-spring systems. Two 0.5 mm steel facings (3.9 kg/m2 each) separated by a low dynamic stiffness core produce a resonance typically between 60 and 100 Hz. Below that frequency the sound reduction falls away sharply, which is why lightweight prefab envelopes transmit road and aircraft rumble that the Rw number does not predict.
Build-up
Rw (dB)
tau
Indoor level at 70 dB(A) road
Comment
100 mm PIR panel
25
3.16e-3
45 dB(A)
Above WHO 40 dB night limit
100 mm rock wool panel
30
1.00e-3
40 dB(A)
At the limit
150 mm rock wool panel
32
6.31e-4
38 dB(A)
Acceptable
Panel + decoupled inner leaf
48-52
–
18-22 dB(A)
Flanking limited
A decoupled inner leaf of two 12.5 mm plasterboard layers on a 50 mm stud with 50 mm wool raises the composite from 25 dB to 48-52 dB. In practice the achieved value is capped by flanking at the floor and ceiling junctions, so the resilient detail must continue across those junctions or the measured result will land near 42 dB.
Passive House Windows – Uw Arithmetic, Glazing and psi-Install
Passive house windows are the component that decides whether a prefab envelope meets its energy target. On the 120 m2 reference house, glazing is 7.3 percent of the envelope area but was 57 percent of the heat loss before the window was upgraded.
Whole-Window U-Value – EN ISO 10077-1
Uw is an area-weighted sum of frame, glazing and the spacer edge effect: Uw = (Af x Uf + Ag x Ug + lg x psig) / (Af + Ag). For a 1500 x 1500 mm window the reference geometry is Af = 0.63 m2, Ag = 1.62 m2, lg = 5.08 m, total 2.25 m2.
Build-up
Uf
Ug
psi_g
Uw (W/m2K)
Aluminium, no break, 6-12-6 air, alu spacer
5.90
2.80
0.080
3.849
14 mm PA66, 5-12A-5 Low-E, alu spacer
3.00
1.40
0.060
1.983
24 mm PA66, 5-12Ar-5 Low-E, alu spacer
2.20
1.10
0.050
1.521
34 mm PA66 + foam, 5-12Ar-5 Low-E, warm edge
1.50
1.10
0.040
1.302
44 mm foam break, 4-12-4-12-4 argon, warm edge
0.80
0.60
0.030
0.724
44 mm foam break, 4-14-4-14-4 krypton, warm edge
0.75
0.44
0.030
0.595
The Passive House Institute certified component limit is Uw of 0.80 W/m2K for a cool-temperate climate. Only the last two rows reach it. The single biggest step is not the glass: moving from no break to a 24 mm PA66 strip cuts Uw from 3.849 to 1.521, a 60 percent reduction driven entirely by the frame. Going from argon triple to krypton triple only moves Uw from 0.724 to 0.595.
Glazing Options – Argon, Krypton and Warm-Edge Spacers
Argon fills at 90 percent purity give Ug 0.60 in a 4-12-4-12-4 build. Krypton allows a narrower cavity and reaches Ug 0.44, but krypton costs roughly 8-12 USD/m2 more and the fill retention over 20 years is less well documented. A warm-edge spacer moves psi_g from 0.080 to 0.030, worth about 0.10-0.13 W/m2K on Uw – the cheapest single upgrade in the whole window.
Purchase order sequence. Spend in this order: (1) thermal break width, (2) warm-edge spacer, (3) Low-E coating, (4) triple glazing, (5) krypton fill. Buyers who order the krypton triple before the 34 mm break are paying for glass that the frame will waste.
Installation Thermal Bridge and psi-Install
Uw describes the window in the laboratory. The installed performance adds psi_install, the linear transmittance of the junction between the window and the wall. In a panel wall the window should sit in the insulation plane, strapped to the cassette frame, with the outer insulation overlapping the frame by 20-30 mm.
Installation position
psi_install (W/mK)
Effect on 30 m2 glazing
Verdict
Frame flush with outer face
0.10
+15.0 W/K
Fail
Frame at mid-insulation
0.05
+7.5 W/K
Marginal
Frame in insulation plane + 25 mm overlap
0.02
+3.0 W/K
Pass
PHI certified installation detail
0.01
+1.5 W/K
Pass
At 0.10 W/mK over 30 windows with 5 m of perimeter each, the installation bridge alone is 15 W/K, comparable to the entire window transmission loss at Uw 0.72. The detail is specified on the shop drawing, not on site.
Condensation Check – EN ISO 13788
Internal surface temperature is theta_si = Ti – (Rsi / Rtot) x (Ti – Te). With Ti = 20 C and Te = -5 C, the dew point at 20 C is 9.3 C at 50 percent RH, 12.0 C at 60 percent, 13.2 C at 65 percent, 14.4 C at 70 percent and 16.4 C at 80 percent.
Local resistance (m2K/W)
theta_si (C)
Safe to indoor RH
Condition
0.30
9.2
50%
Condensation above 50 percent RH
0.40
11.9
58%
Marginal
0.50
13.5
65%
Acceptable for housing
0.65
15.0
72%
Good
0.80
15.9
78%
Passive house range
A through-metal panel joint with a local resistance of 0.50 gives theta_si = 13.5 C, which survives normal residential humidity but fails in a bathroom or kitchen at 70 percent RH. The fix is the same isolator pad that solves the psi problem, plus mechanical extract at 30 m3/h in wet rooms.
Price Table (USD) – Envelope, Windows and Complete Packages
All prices are FOB Shenzhen or Foshan, valid for a minimum order of two 6.0 x 3.0 m modules, excluding windows unless stated. Ranges reflect 2025 aluminium ingot and steel coil pricing.
Envelope and Window FOB Price Bands
Item
Specification
Unit
USD Low
USD High
Note
Wall cassette
140 mm rock wool, 180 mm
m2
58
96
Excludes linings
Roof cassette
200 mm PIR, structural
m2
72
128
Includes OSB deck
Floor cassette
200 mm PIR, cement board
m2
68
115
Wet-room grade +8
Sandwich panel
100 mm PIR, 0.5/0.5
m2
19
34
Cladding only
Sandwich panel
100 mm rock wool A2
m2
26
44
Non-combustible
Window, double
24 mm break, 5-12Ar-5
m2
95
165
Uw 1.52
Window, triple
44 mm foam, argon triple
m2
185
310
Uw 0.72
Window, PH grade
Krypton triple, warm edge
m2
260
420
Uw 0.60
Sliding door
2-panel, 2400 x 2400
set
420
880
Hardware class dependent
Entry door
Aluminium, thermal break
set
280
640
With multipoint lock
Light steel frame
S350 GD+Z, cut to length
t
980
1,450
Z275 coating
Complete House Package Pricing
Package
Envelope spec
Windows
USD/m2 floor
120 m2 house (USD)
Shell only
100 mm EPS panels
Not included
120-190
14,400-22,800
Standard
100 mm PIR + board lining
Uw 1.52 double
320-480
38,400-57,600
Enhanced
150 mm PIR, A2 lining
Uw 1.30 warm edge
450-620
54,000-74,400
Passive
200 mm PIR, isolator joints
Uw 0.72 triple
620-780
74,400-93,600
Passive +
250 mm, krypton glazing
Uw 0.60 PH grade
740-960
88,800-115,200
The jump from Standard to Passive is 300 USD/m2 of floor area, of which 55-75 USD/m2 is the glazing upgrade and the remainder is insulation thickness and joint detailing. On 30 m2 of glazing the triple upgrade costs 30 x (185-95) = 2,700 USD at the low end.
Budget guidance. Freight, foundation and site works are not in these numbers. At 41-125 USD/m2 of freight, 90-180 USD/m2 for a piled or slab foundation and 150-320 USD/m2 for erection and finishing, add 280-625 USD/m2 to any FOB figure to reach a realistic delivered cost.
What Moves the Price
Aluminium ingot: +/- 10 percent on ingot moves the window price by 4-6 percent.
Panel thickness: 100 to 150 mm PIR adds 6-9 USD/m2 of panel.
Fire rating: A2 rock wool instead of PIR adds 4-7 USD/m2 of panel and 75 mm of thickness.
Powder coat: a Qualicoat Class 2 marine pre-treatment plus PVDF topcoat adds 8-14 USD/m2 of window.
Order size: below two modules a 12-18 percent setup premium applies to the roll-forming line.
Glazing cavity: argon to krypton adds 8-12 USD/m2 of glass.
Production Process – From Coil to Loaded Container
Roll Forming, Panel Lamination and Cutting
Steel coil S350 GD+Z Z275 is roll formed to C and U sections at 12-18 m/min with in-line punching for service penetrations.
Sandwich panels are laminated on a continuous double-belt line at 40-60 C with a PIR pour density of 38-42 kg/m3; line speed 3-6 m/min.
Rock wool panels use a lamella mat rotated 90 degrees to the facings to reach the bond strength required by EN 14509.
Panels cure for 24-48 h before cutting to length on a flying saw with a 0.5 mm tolerance.
Cassettes are assembled on a jig with a 1.0 mm positional tolerance on the cam-lock axis.
Aluminium Extrusion, Thermal Break and Coating
Billet 6063 is homogenised at 560 C, extruded at 450-500 C, press quenched and artificially aged at 175-185 C for 4-6 h to T5.
The polyamide strip is PA66 GF25, knurled and rolled into the profile channel under a calibrated pressure to reach a shear bond above 24 N/mm per EN 14024.
Foam-filled breaks inject a two-part polyurethane into the strip cavity, which lifts Uf from 2.2 to 1.5 W/m2K.
Powder coating is a chrome-free pre-treatment plus a 60-80 micron polyester coat to Qualicoat Class 1; coastal specification adds the Class 2 pre-treatment and a PVDF topcoat.
Anodising to 15-20 micron AA15/AA20 remains available for projects specifying a metallic finish.
Assembly, Pre-Installation and QC Gates
Gate
Check
Method
Tolerance
Record
G1 Incoming
Coil certificate, coating mass
Mill cert + weigh
Z275 min
Batch file
G2 Profile
Wall thickness, temper
Micrometer + hardness
+/- 0.05 mm
Extrusion log
G3 Break
Shear bond of PA66
EN 14024 pull test
> 24 N/mm
Weekly coupon
G4 Panel
Core density, bond
Weigh + drum peel
38-42 kg/m3
Panel map
G5 Cassette
Squareness, cam-lock torque
Diagonal + torque gun
1.0 mm
Unit card
G6 Glazing
IGU seal, gas fill
Spark test + gas analyser
> 90% Ar
IGU serial
G7 Pre-fit
Dry assembly of one unit
Full trial build
Zero rework
Photo pack
G8 Load
Container plan, lashing
Weighbridge + photos
+/- 2%
Loading report
Gate G7 is the one that saves money. A complete dry trial assembly of the first unit before the run starts costs 400-900 USD and typically finds three to six interference problems that would otherwise be solved with a grinder on site.
Technical Indicators – Envelope, Window and Whole-House Data
Envelope and Structural Data Sheet
Parameter
Standard value
Enhanced value
Test standard
Wall U-value
0.212 W/m2K
0.108 W/m2K
EN 14509
Roof U-value
0.160 W/m2K
0.090 W/m2K
EN 14509
Floor U-value
0.220 W/m2K
0.110 W/m2K
ISO 6946
Air tightness n50
1.0 h-1
0.6 h-1
EN ISO 9972
Joint psi
0.10 W/mK
0.03 W/mK
EN ISO 10211
Floor live load
2.0 kN/m2
3.0 kN/m2
EN 1991-1-1
Wind load
1.0 kPa
2.15 kPa
EN 1991-1-4
Snow load
1.0 kN/m2
2.5 kN/m2
EN 1991-1-3
Seismic
0.2 g
0.4 g
EN 1998-1
Frame steel
S350 GD+Z Z275
S390 GD+Z Z350
EN 10346
Bending span
3.0 m
4.2 m
EN 1993-1-3
Window Performance Classes
Property
Class / value
Test standard
Export market requirement
Air permeability
Class 4 (600 Pa)
EN 12207
EU, AU, ME
Water tightness
E900 (900 Pa)
EN 12208
EU, typhoon zones
Wind resistance
C5 / 2000 Pa
EN 12210
EU high rise
Wind resistance (US)
DP 50 / 2400 Pa
AAMA/WDMA 101/I.S.2
North America
Impact (HVHZ)
Large missile, TAS 201/203
Miami-Dade NOA
Florida, Gulf coast
Thermal (AU)
Uw 1.30-0.72
AS 2047 / WERS
Australia
Thermal (US)
U 0.28-0.18 Btu/h.ft2.F
NFRC 100
North America
Acoustic
Rw 32-42 dB
EN ISO 717-1
Urban, airport
Whole-House Heat Load – 120 m2 Reference
Reference house: 120 m2 floor, V = 324 m3, envelope 410 m2 of which 30 m2 is glazing (7.3 percent). Ventilation is 0.4 ACH mechanical with 85 percent recovery (6.4 W/K) plus infiltration at n50 1.0 (5.3 W/K), total air term 11.8 W/K. Heating season 2,700 K.d = 64.8 kKh.
Envelope spec
UA opaque
UA window
UA total
Season kWh/a
Design load W/m2
Basic, Uw 3.85
226.2
115.5
353.5
22,904
54.1
Basic, Uw 0.72
226.2
21.7
259.7
16,829
54.1
Mid, Uw 3.85
75.3
115.5
202.5
13,123
22.7
Mid, Uw 0.72
75.3
21.7
108.8
7,048
22.7
High, Uw 0.72
52.4
21.7
85.9
5,566
17.9
Max, Uw 0.72
39.1
21.7
72.6
4,705
15.1
Two results matter. First, at the Mid envelope the windows are 7.3 percent of the area but 57.0 percent of the heat loss at Uw 3.85, falling to 20.0 percent at Uw 0.72 – the window is the dominant term in a well-insulated envelope. Second, the design heat load at delta T = 25 K falls from 54.1 to 22.7 W/m2 between the Basic and Mid envelopes, which halves the heat pump capacity from roughly 6.5 kW to 2.7 kW.
The 10 W/m2 Passive House limit is not reached by these envelopes. Even the Max specification gives 15.1 W/m2. At 25 percent glazing with Uw 0.72 the windows alone contribute 21.7 of 72.6 W/K. Reaching 10 W/m2 needs a more compact form, a warmer climate, or glazing at Ug 0.4 with a 300 mm envelope. State this before a client budgets for certification.
Certifications and Test Reports
CE, EN 1090 and EN 14509
EN 1090-1 execution class EXC2 for the light-steel frame, with a factory production control certificate and welding coordination to EN ISO 3834.
EN 14509 for self-supporting double-skin metal faced insulating panels, covering mechanical properties, thermal transmittance and fire behaviour.
CE marking of the windows under EN 14351-1 with a Declaration of Performance listing Uw, air, water and wind classes.
ISO 9001 quality management and ISO 14001 environmental management on the factory.
ISO 45001 occupational health and safety where the client audit requires it.
NFRC, AAMA, Miami-Dade NOA and AS 2047
Certificate
Scope
Lead time
Cost (USD)
Validity
NFRC 100/200
U-factor, SHGC simulation
6-10 weeks
1,800-3,400
Per product line
AAMA/WDMA 101
DP rating, air, water
10-16 weeks
9,000-18,000
4 yr + audit
Miami-Dade NOA
TAS 201/202/203 impact
20-32 weeks
26,000-48,000
1 yr + audit
AS 2047 (AU)
Wind, water, infiltration
8-14 weeks
4,500-9,000
3 yr
PHI component
Uw 0.80 or better
12-20 weeks
3,200-6,500
Per geometry
CE / DoP
EN 14351-1
4-8 weeks
Included
Ongoing
Certification cost is per product line, not per order, so it belongs in the first unit price. A Miami-Dade NOA at 26,000-48,000 USD cannot be amortised over a two-module order; either the client commits to volume or the project specifies a different impact route.
Passive House Institute Component Database
A window with Uw of 0.80 W/m2K or better for a cool-temperate climate can be listed in the PHI component database. Listing requires a certified calculation to EN ISO 10077-1 including the frame cavity, the spacer and the installation detail, plus a PHPP-compatible data set. The 44 mm foam break with argon triple at Uw 0.724 qualifies; the 34 mm build at 1.302 does not.
Procurement Data – MOQ, Lead Time, Payment and Packing
MOQ and Order Structure
Item
MOQ
Reason
Below MOQ surcharge
Prefab house module
2 units
Roll-form setup
12-18%
Cassette set only
6 units
Jig amortisation
10-15%
Sandwich panels
300 m2
Continuous line run
8-12%
Windows and doors
50 m2 / 20 units
Extrusion batch
15-25%
PH grade glazing
30 m2
Krypton fill batch
20-30%
Lead Time and Production Slots
Stage
Days
Cumulative
Note
Drawings and sign-off
7-12
12
Client approval gate
Material procurement
5-10
22
Coil and billet lead
Roll forming and lamination
8-14
36
Runs in parallel
Window fabrication
12-18
36
Parallel line
Dry trial assembly
2-3
39
Gate G7
Disassembly and packing
3-5
44
Container planning
Inland haul and loading
2-4
48
To port
A quoted 35-45 day lead time is achievable only when drawing sign-off happens in the first week. In practice the drawing gate absorbs 2-4 weeks of client-side revision; the factory portion is rarely the critical path.
Payment Terms and Incoterms
Standard: 30 percent deposit with the order, 70 percent against a copy of the bill of lading.
Letters of credit at sight are accepted for orders above 60,000 USD; confirmed LC adds 0.9-1.4 percent.
Open account terms are available from the third repeat order, net 30 from bill of lading date.
FOB Shenzhen or Foshan is the default; CIF and DAP are quoted on request with a 4-8 percent uplift.
Price validity is 30 days from quotation because of aluminium ingot and steel coil volatility.
Packing, Container Loading and Freight
Item
Packing
40HQ load
Weight per unit
Freight USD/m2
Floor cassette
Steel stillage, strapped
3 units
2.6 t
41-125
Roof cassette
Steel stillage, strapped
3 units
2.1 t
–
Wall panel pack
Timber crate, 15 per crate
4 crates
2.3 t
–
Windows
Foam + carton + crate
380 m2
1.4 t/100 m2
6-14
Hardware kit
Boxed, one per unit
12 boxes
0.3 t
–
Freight per square metre of floor area ranges from 41 USD at three 8 t modules on a 2,200 USD lane to 125 USD at two modules on a 4,500 USD lane. Because the payload limit binds before the volume limit, every kilogram removed from the cassette specification converts directly into freight. A 1.1 t reduction per module is worth roughly one additional module per container on a 26 t limit.
Installation Method – Foundation, Erection and Commissioning
Foundation and Anchor Setting
Set a reinforced concrete slab or screw piles to a level tolerance of +/- 3 mm over the whole footprint; cassette alignment cannot absorb more.
Cast or drill in M16 hold-down bolts at 1.2 m centres to match the bottom rail punching.
Lay a 10 mm bitumen-impregnated damp-proof course strip under every bottom rail; steel-to-concrete contact wicks moisture into the cassette.
Install the perimeter drain before erection, not after, because the cassette envelope makes later excavation difficult.
Cassette Erection and Joint Sealing
Crane the floor cassettes first and bolt through the bottom rail into the hold-downs before any wall goes up.
Stand wall cassettes from a corner and work out; engage the cam-locks progressively rather than tightening each fully in turn.
Fit the isolator pad at each cam-lock at the same time – retrofitting after the joint is closed is not possible.
Apply the primary seal as a pre-compressed butyl tape on the inner face and a backer rod plus a neutral-cure silicone on the outer face.
Place the roof cassette and fix within the same day; an open box without a diaphragm has no racking resistance.
Apply the air barrier membrane across every joint with a 100 mm lap and roll it to a continuous bond.
Window Installation, Waterproofing and Commissioning
Strap the window into the insulation plane with the outer insulation overlapping the frame by 25 mm.
Fit the EPDM or nylon isolator shim at every fixing point where aluminium meets container or panel steel.
Set the sill on a 5 mm packer with a 5 percent fall and a drained cavity to the outer face.
Seal the outer perimeter with a Class 25 silicone and the inner with an airtight tape bonded to the membrane.
Blower-door test to EN ISO 9972 at handover and record n50; repair any leak above 0.5 m3/h per joint.
Commission the HRV to 0.4 ACH, balance supply and extract to within 10 percent, and log the fan curve.
Retorque cam-locks and re-check door clearances at 30 days and again at 12 months.
Project Data – Delivered Houses and Measured Results
Two-Module House, 120 m2, Northern China
Two 6.0 x 3.0 m modules with a 200 mm PIR roof cassette, 140 mm rock wool walls and 30 m2 of glazing at Uw 0.724. Site erection took 4 days with a 50 t crane and a five-person crew. Design heat load came in at 22.7 W/m2 and the installed heat pump is 3.5 kW.
Item
Value
Unit
Note
Floor area
120
m2
Two modules
Envelope area
410
m2
7.3% glazed
Design heat load
2,719
W
delta T 25 K
Seasonal demand
7,048
kWh/a
58.7 kWh/m2a
Heat pump size
3.5
kW
Sized at 22.7 W/m2
Erection time
4
days
5 crew, 50 t crane
Measured n50
0.9
h-1
Blower door EN ISO 9972
Envelope cost FOB
62,400
USD
520 USD/m2
Cost Comparison Against Site-Built
Metric
Factory prefab
Site-built masonry
Delta
Envelope programme
4 days
11 weeks
-10.4 weeks
Design heat load
22.7 W/m2
48-62 W/m2
-55%
Heat pump capacity
3.5 kW
8-10 kW
-58%
Air tightness n50
0.9 h-1
3.5-5.0 h-1
-78%
Envelope FOB cost
520 USD/m2
330-410 USD/m2
+27-58%
Site labour days
95
380
-75%
Weather delay risk
Low
High
–
The prefab envelope costs 27-58 percent more FOB but removes 285 site labour days and cuts the heating plant by more than half. The crossover depends entirely on local labour rates: above roughly 35 USD per hour the factory route wins on total cost, below 18 USD per hour it does not.
24-Unit Container House Camp
Twenty-four 20 ft container units converted to single-occupancy accommodation, each with a 2400 x 1200 mm window opening framed in RHS 100 x 50 x 3.0 and a 900 x 2100 mm entry door. Header stress came in at 64.2 MPa against 215 MPa allowable. Units were stacked two high, so every cut-out was re-checked for the upper unit load path.
Units delivered: 24 over four 40HQ moves at 6 units per move (flat-pack kit form).
Cut-out framing: RHS 100 x 50 x 3.0, continuous weld to the corrugation crest on both faces.
Window specification: 24 mm PA66 break, 5-12Ar-5 Low-E, Uw 1.521, 10 mm reveal isolator shim.
Coating: Sa 2.5 blast, zinc-rich epoxy plus polyurethane topcoat at 240 micron DFT.
Measured internal noise with the door closed: 41 dB(A) against 68 dB(A) outside.
Configuration Comparison – Which Upgrade to Buy First
Three Specification Levels
Parameter
Standard
Enhanced
Passive
Wall core
100 mm PIR
150 mm PIR
200 mm PIR
Wall U
0.212
0.143
0.108
Roof U
0.160
0.120
0.090
Window
24 mm break, double
34 mm foam, double
44 mm foam, triple
Uw
1.521
1.302
0.724
Spacer
Aluminium
Warm edge
Warm edge
Joint psi
0.10
0.05
0.03
n50
1.5 h-1
1.0 h-1
0.6 h-1
Design load
31.5 W/m2
25.4 W/m2
22.7 W/m2
FOB USD/m2
320-480
450-620
620-780
Envelope Against Window – Upgrade Priority
Step
Measure
UA saved (W/K)
Cost (USD)
USD per W/K
Rank by cost
1
Warm-edge spacer on all glazing
0.6
180
300
5
2
Joint isolator pads
7.0
320
46
1
3
24 to 34 mm thermal break
1.6
1,050
656
6
4
Air tightness 1.5 to 1.0 n50
5.3
480
91
2
5
Double to triple glazing
11.6
2,700
233
3
6
100 to 200 mm wall insulation
14.6
3,900
267
4
7
Argon to krypton fill
1.5
1,080
720
7
Ranked by cost per W/K the joint isolator pads at 46 USD per W/K are the cheapest measure in the whole building, followed by the air tightness work at 91, then triple glazing at 233 and wall insulation at 267. The warm-edge spacer, the 34 mm thermal break and the krypton fill rank 5, 6 and 7. This ordering is only visible if the psi and n50 terms are on the schedule at all – they usually are not.
Related Systems from the Same Production Line
The window, door and glazed extension packages below are built on the same extrusion and glazing lines as the prefab house envelope, so finishes, hardware and glass build-ups match across the whole project.