An aluminium green house supplied from China: 6063-T5 glazing bars, tempered safety glass side walls, twin-wall polycarbonate roof panels and continuous ridge ventilation.
A green house is a plant-production enclosure, and that single fact changes almost every specification decision. A conservatory is sized for human comfort on winter evenings; a green house is sized for photons per square metre in February and for the snow load that sits on the roof while it does it. This page works through the engineering of an aluminium-framed green house: snow and wind actions under EN 1991, glazing bar spans for seven extrusion sizes, glass pane sizing to EN 16612, twin-wall polycarbonate expansion, PAR transmission, a worked heating calculation for an 8 x 12 m house, ventilation areas, condensation control, and the fertiliser and sulphur chemistry that attacks aluminium frames. FOB prices, MOQ, container loading and installation failure points are at the end.
Green House, Conservatory, Orangerie and Sunroom: Four Different Design Targets
Buyers use these four words interchangeably, and suppliers quote them from the same catalogue. They are not the same product. The difference shows up in four numbers: the winter internal design temperature, the target light transmission, the ventilation rate, and the glazing safety class required overhead. Get those four wrong and the structure will be either over-specified for its use or non-compliant.
Four structures, four design targets
Type
Primary purpose
Winter setpoint
Typical covering
Ventilation
Overhead glazing
Green house
Plant production: light and yield
12-18 deg C by crop
4 mm horticultural glass or 6-16 mm PC
15-25% of floor area
Horticultural glass or PC
Glass greenhouse
Production with maximum PAR
12-18 deg C by crop
Diffuse AR glass 4 mm, low iron
15-25% + ridge
Tempered or PC
Conservatory
Occupied living space
19-21 deg C
IGU 4-12-4 walls, 6-16-6 roof
Background + purge
Laminated inner pane, EN 14449
Orangerie
Living space with solid ceiling
19-21 deg C
Solid roof perimeter + glazed lantern
Background + purge
Laminated, limited area
Sunroom
Occupied, mostly 3-season
18-21 deg C
IGU walls, insulated roof panels
Windows + roof vents
Laminated
A green house and a conservatory can look identical from the garden and differ by a factor of three in heating demand. The green house is deliberately leaky and single-glazed because ventilation and light matter more than heat retention; the conservatory is sealed and double-glazed because the occupant, not the plant, sets the comfort target. If you are specifying a structure that will be sat in, follow the same rules as for a four-season sunroom or a Wintergarten conservatory, not the rules on this page.
Reading a specification: which standard applies to which
EN 13031-1:2019 covers the design and construction of commercial production greenhouses. It is the reference for the frame, and it sends you to the EN 1990 / EN 1991 series for the actions. Hobby and domestic green houses sit outside its formal scope, so for those the loads have to be stated explicitly in the order.
EN 1090-1 / EN 1090-3 applies when the aluminium frame is placed on the market as a load-bearing construction kit. Execution class EXC1 is typical for a single-storey greenhouse; expect a Declaration of Performance and a CE mark on the frame, not on the glazing.
CPR 305/2011: there is no harmonised product standard for a complete greenhouse kit, so a whole-house CE mark generally does not exist. Any supplier offering one is either marking the frame under EN 1090 or misusing the mark.
Glass: EN 12150 (thermally toughened), EN 12600 (pendulum impact), EN 14449 (laminated), EN 1279 (insulating glass units).
ASCE 7-22 for US ground snow and wind, NBCC 2020 for Canada, EN 1991-1-3 / -1-4 for Europe.
Order-writing note: state the design code, the ground snow load, the basic wind velocity and the roof shape coefficient in the purchase order. “Standard greenhouse” is not a load case, and the difference between sk = 0.75 and sk = 2.20 kN/m2 roughly halves the permissible glazing bar span.
Aluminium Greenhouse Frames: Alloy, Wall Thickness and Glazing Bar Span
Ninety per cent of a green house frame is one repeated member: the glazing bar that runs from eave to ridge and carries the covering. Its span is set by snow, and its size is set by deflection rather than strength. The tables below are computed for 6063-T5 with E = 70 GPa and a design strength of 118 MPa (Rp0.2 = 130 MPa divided by gammaM1 = 1.10 per EN 1999-1-1).
Extrusion sections used in greenhouse frames
Ref
Section (mm)
I (cm4)
W (cm3)
Mass (kg/m)
Typical use
P1
40 x 30 x 1.5
2.9
1.95
0.54
Glazing bar, short spans only
P2
50 x 40 x 1.8
8.0
4.01
0.84
Glazing bar, mild snow
P3
60 x 40 x 2.0
10.2
5.11
1.04
Glazing bar, standard
P4
80 x 50 x 2.0
21.7
8.67
1.36
Glazing bar, snow regions
P5
100 x 50 x 2.5
32.0
12.81
1.96
Ridge / purlin
P6
120 x 60 x 3.0
66.4
22.14
2.82
Gutter beam, 4-5 m bays
P7
150 x 80 x 3.0
153.7
38.43
3.63
Valley beam, multi-span
Wall thickness in a greenhouse frame runs 1.5-2.0 mm on glazing bars, 2.0-2.5 mm on posts and ridge, and 2.5-3.0 mm on gutters and valley beams. Anything thinner than 1.5 mm on a load-bearing bar will not survive the thread-forming screws used to fix the glazing clips, and will not meet the local buckling check in EN 1999-1-1 for a Class B section in this depth range.
Load cases: ground snow to roof snow
EN 1991-1-3 converts ground snow sk to roof snow with a shape coefficient mu. For a duo-pitch greenhouse roof at 22 degrees, mu = 0.8. For multi-span Venlo types the valleys collect drift and sliding snow and mu can reach 2.0-3.0, which is why a Venlo gutter is a much heavier member than a domestic gutter. Add a dead load of 0.30 kN/m2 for 4 mm glass plus bar self-weight plus fixings. Asymmetric load (full snow on one slope, half on the other) must also be checked on spans over 4 m.
Case
Ground snow sk
mu
Roof snow
+ dead
Total q
Typical region
LC1
0.50 kN/m2
0.8
0.40
0.30
0.70 kN/m2
Coastal UK, mild winter
LC2
1.00 kN/m2
0.8
0.80
0.30
1.10 kN/m2
Central Europe, Netherlands
LC3
1.50 kN/m2
0.8
1.20
0.30
1.50 kN/m2
Scandinavia, Alpine foothills
LC4
2.20 kN/m2
0.8
1.76
0.30
2.06 kN/m2
Quebec, NBCC 2020
LC5
1.50 kN/m2
2.0
3.00
0.30
3.30 kN/m2
Multi-span valley drift
Maximum glazing bar span, glass covering (deflection L/150, 12 mm cap)
The 12 mm absolute cap comes from the glass engagement depth in the bar channel: standard greenhouse glazing bars hold the pane on a 12-15 mm land with an EPDM gasket. Beyond roughly 12 mm of bar deflection the pane can walk out of the channel or the edge stress rises enough to crack it during a frost. Span below is for a simply supported bar; values in metres.
Case
Bar spacing
P1
P2
P3
P4
P5
P6
P7
LC1 (0.70)
0.60 m
1.35
1.87
1.98
2.40
2.64
3.17
3.91
LC1 (0.70)
0.75 m
1.25
1.76
1.88
2.27
2.50
3.00
3.70
LC1 (0.70)
1.00 m
1.14
1.60
1.73
2.11
2.33
2.79
3.44
LC2 (1.10)
0.60 m
1.16
1.63
1.76
2.14
2.36
2.83
3.50
LC2 (1.10)
0.75 m
1.08
1.51
1.64
2.02
2.23
2.68
3.31
LC2 (1.10)
1.00 m
0.98
1.37
1.49
1.88
2.08
2.49
3.08
LC3 (1.50)
0.60 m
1.04
1.47
1.59
1.98
2.18
2.62
3.23
LC3 (1.50)
0.75 m
0.97
1.36
1.48
1.87
2.06
2.48
3.06
LC3 (1.50)
1.00 m
0.88
1.24
1.34
1.73
1.92
2.31
2.85
LC4 (2.06)
0.60 m
0.94
1.32
1.43
1.83
2.02
2.42
2.99
LC4 (2.06)
0.75 m
0.88
1.22
1.33
1.71
1.91
2.29
2.83
LC4 (2.06)
1.00 m
0.80
1.11
1.21
1.55
1.77
2.13
2.63
Two things jump out. First, spacing matters more than it looks: going from 600 mm bar centres to 1000 mm costs about 15 per cent of the allowable span, because the load on each bar scales with the tributary width while the section stays the same. Second, the step from P3 to P4 (60 x 40 x 2.0 to 80 x 50 x 2.0) roughly doubles I for a 36 per cent mass increase, and that is the single cheapest way to buy 40-50 per cent more span. I scales with the cube of the section depth, so a deeper bar always beats a thicker wall.
Same table for polycarbonate covering (L/100, 20 mm cap)
Case
Bar spacing
P1
P2
P3
P4
P5
P6
P7
LC1 (0.70)
0.75 m
1.43
2.01
2.13
2.58
2.84
3.41
4.21
LC2 (1.10)
0.75 m
1.23
1.73
1.88
2.30
2.54
3.05
3.76
LC3 (1.50)
0.75 m
1.11
1.56
1.69
2.13
2.35
2.82
3.48
LC4 (2.06)
0.75 m
1.00
1.40
1.52
1.96
2.17
2.60
3.21
Polycarbonate tolerates more deflection than glass, so allowable spans are 12-16 per cent longer for the same section. That is not a free win: PC sheets also need an expansion gap that glass does not, and the sheet pulls out of a shallow channel long before the bar actually fails. The governing condition for PC is usually sheet retention, not bar deflection.
Deflection, not strength: in every row above the bending stress utilisation is under 45 per cent when the deflection limit is reached. If a supplier sizes a green house frame on “strength”, the structure will be stiff enough only by accident.
Glass Greenhouse Glazing: Pane Size, Thickness and Safety Overhead
A glass greenhouse is the reference against which every other covering is measured, because glass holds its light transmission for 30 years and polycarbonate does not. The engineering question is simply how big a pane a given thickness will carry.
Maximum pane short span by thickness and load
For a pane with an aspect ratio of 2:1 or longer, the plate behaves as a one-way strip and the edge stress is sigma = 0.75 x p x a-squared / t-squared, where a is the short span. Design bending strengths below are EN 16612 characteristic values divided by a material factor of 1.8: 25.0 MPa annealed, 38.9 MPa heat-strengthened, 66.7 MPa fully tempered. Spans are in metres; the second column is the resulting pane area at 2:1.
Total load p
Glass type
t = 3 mm
t = 4 mm
t = 5 mm
t = 6 mm
t = 8 mm
t = 10 mm
0.70 kN/m2 (LC1)
Annealed
0.65
0.87
1.09
1.31
1.75
2.18
0.70 kN/m2 (LC1)
Tempered
1.07
1.43
1.78
2.14
2.85
3.56
1.10 kN/m2 (LC2)
Annealed
0.52
0.70
0.87
1.04
1.39
1.74
1.10 kN/m2 (LC2)
Tempered
0.86
1.14
1.42
1.71
2.27
2.84
2.06 kN/m2 (LC4)
Annealed
0.38
0.51
0.64
0.76
1.02
1.27
2.06 kN/m2 (LC4)
Tempered
0.62
0.83
1.04
1.25
1.66
2.08
3.30 kN/m2 (LC5)
Tempered
0.49
0.66
0.82
0.99
1.31
1.64
The 4 mm annealed row at LC1 gives 0.87 m, which is why traditional Dutch horticultural glass is cut at roughly 730 mm wide: that is the number the physics gives you, not a tradition. Move to 4 mm tempered and the same load allows 1.43 m, which is why modern wide-pane greenhouses are tempered as standard. In Quebec at 2.06 kN/m2, 4 mm tempered drops to 0.83 m, so the standard 4 mm pane is no longer workable and the spec has to move to 5 or 6 mm, or to a narrower bar spacing.
Safety glazing overhead and hail
Horticultural glass is annealed float, typically 4 mm, and it breaks into long shards. Where a structure is a workplace or is accessible to the public, overhead glazing has to be safety glazing: EN 12150 thermally toughened, or EN 14449 laminated if post-breakage retention is required. ANSI Z97.1 and CPSC 16 CFR 1201 apply in the US. For a domestic green house the practical options are tempered glass, laminated glass, or a safety film applied to the inside face of annealed glass.
Hazard
4 mm annealed
4 mm tempered
6 mm tempered
16 mm PC
Note
Human impact
Fail (shards)
Pass
Pass
Pass
EN 12600 1B1 / 1C1
Post-breakage retention
None
None (crumbles)
None
High
Laminate or film if required
Hail 20 mm
Marginal
Pass
Pass
Pass
Terminal velocity ~ 14 m/s
Hail 30 mm
Fail
Marginal
Pass
Pass
Terminal velocity ~ 17 m/s
Hail 45 mm
Fail
Fail
Marginal
Pass
Alpine / Great Plains regions
NiS spontaneous break
Rare
1 in 8-10 t
1 in 8-10 t
n/a
Heat-soak to EN 14179
Heat-soak testing to EN 14179 costs 4-7 USD/m2 and reduces the spontaneous nickel-sulphide breakage rate of tempered glass by roughly an order of magnitude. On a large glass greenhouse roof it is worth specifying, because a pane that lets go in February over a cropped bed does more damage than the pane costs.
Specify toughened to EN 12150 with fragment count verified; ask for the test report, not the catalogue page.
Over growing beds, specify laminated (EN 14449) or a safety film so that a broken pane does not fall onto the crop.
Edge work: arrised or polished edges only. A seamed edge on toughened glass is the most common cause of in-service breakage at the glazing bar.
Do not use mirror or coated glass in a production green house: the coating that cuts solar gain also cuts PAR, which is the opposite of what you want.
Twin-Wall Polycarbonate: U-Value, Light and the Expansion Gap
Twin-wall and multi-wall polycarbonate is the default roof covering on domestic and hobby structures because it is light, does not shatter and takes impact. The trade-offs are lower light transmission, a shorter service life, and a coefficient of thermal expansion seven times that of glass.
Sheet specification comparison
Sheet
Structure
Mass
U (wall)
U (roof)
Light trans.
Expected life
FOB USD/m2
4 mm float glass
Monolithic
10.0 kg/m2
5.8
6.9
90%
30+ yr
6-9
4 mm diffuse AR glass
Monolithic, etched
10.0 kg/m2
5.8
6.9
91%
30+ yr
14-18
6 mm twin-wall PC
2 wall
1.3 kg/m2
3.0
3.3
82%
10 yr
7-10
8 mm twin-wall PC
2 wall
1.5 kg/m2
2.7
3.0
80%
10 yr
9-12
10 mm twin-wall PC
2 wall
1.7 kg/m2
2.5
2.8
79%
10-12 yr
11-15
16 mm 3-wall PC
3 wall
2.5 kg/m2
2.0
2.3
78%
10-12 yr
15-20
16 mm 5-wall PC
5 wall
3.0 kg/m2
1.7
2.0
76%
12-15 yr
18-24
25 mm 5-wall PC
5 wall
3.8 kg/m2
1.3
1.6
72%
12-15 yr
26-34
200 um PE film
Double inflated
0.4 kg/m2
2.5
2.8
80%
4 yr
1.5-2.5
Note the U-value split between wall and roof. EN 673 uses an internal surface resistance of 0.13 m2K/W for horizontal heat flow and 0.10 for upward heat flow, so the same sheet is measurably worse on a roof than on a wall: 4 mm glass goes from 5.8 to 6.9 W/m2K. Any heat-loss calculation that uses one number for the whole envelope under-estimates the roof by 15-20 per cent, and the roof is half the envelope.
Thermal expansion: PC moves 7x as much as glass
Material
Alpha (1/K)
1 m sheet, dT 40 K
2 m sheet, dT 40 K
2 m sheet, dT 60 K
4 m sheet, dT 60 K
Glass
9e-6
0.36 mm
0.72 mm
1.08 mm
2.16 mm
Aluminium
23e-6
0.92 mm
1.84 mm
2.76 mm
5.52 mm
Polycarbonate
65e-6
2.60 mm
5.20 mm
7.80 mm
15.60 mm
Steel
12e-6
0.48 mm
0.96 mm
1.44 mm
2.88 mm
A 2 m PC sheet spanning a 60 K swing wants to grow 7.8 mm. Fit it tight between two glazing bars and that movement has nowhere to go, so the sheet buckles, pulls out of the channel, or cracks around its fixing holes. The rules that follow from the table are simple and are the most common cause of warranty claims on polycarbonate roofs.
Drill fixing holes oversize: hole diameter = screw diameter + 3-4 mm, and never tighter. Use a shoulder washer so the screw cannot clamp the sheet.
Leave an end gap of 3-4 mm per metre of sheet length at the top and bottom, filled with a breathable anti-dust tape, not silicone.
Never silicone the sheet into the channel. It has to be able to slide.
Cut sheets with the flutes vertical on walls so condensate drains out of the bottom; seal the bottom with breather tape and the top with aluminium tape.
Fit the UV-protected face outwards. Both faces look identical on delivery; the UV layer is marked on the protective film, and fitting it inside voids the 10-year warranty.
Anti-drip (hydrophilic) coating goes on the inside face. It is not the same side as the UV layer, and getting them swapped is a one-way error.
Which thickness to buy
Cold Climate, heated: 16 mm 5-wall on the roof, 10 mm twin-wall or glass on the walls. The roof is where half the heat leaves.
Temperate, unheated or frost-free only: 6 mm twin-wall roof, 4 mm glass walls if you want the light.
Hail or vandalism exposure: 10 mm minimum, and accept the light penalty.
Production green house: glass, or diffuse AR glass. The 14-point transmission gap is worth more than the U-value saving in most of Europe (see the heating section).
Light Transmission, Diffusion and PAR: The Number Growers Buy
Suppliers quote light transmission, LT, measured across the whole solar spectrum. Plants use photosynthetically active radiation, PAR, between 400 and 700 nm. The two numbers are close but not identical, and neither is the whole story, because diffuse light penetrates a canopy better than direct light.
LT, PAR and haze
Covering
LT (solar)
PAR trans.
Haze / diffusion
Notes
4 mm clear float
90%
88%
0%
Direct light, hard shadow, hot spots
4 mm low-iron float
91.5%
90%
0%
+2 PAR points for 1-2 USD/m2
4 mm diffuse AR glass
91%
89%
55-70%
Best PAR x distribution product
6 mm twin-wall PC
82%
80%
Low
Flutes give some diffusion
16 mm 5-wall PC
76%
74%
Medium
Five walls = five interfaces
Diffusing PC
78%
76%
65%
Good for ornamentals, weak for tomato
200 um PE film
88%
86%
Low
Condensate drops cut effective PAR 8-12%
ETFE film
95%
93%
Low
Highest transmission, poor U-value
Every air-to-solid interface costs roughly 4 per cent reflection, and every additional wall in a polycarbonate sheet adds two. That is why a 5-wall sheet, with ten interfaces, lands at 76 per cent, and why an anti-reflection coating on glass is worth 2-3 transmission points for very little money.
The 1 per cent light rule and why it dominates the U-value argument
For a high-wire tomato crop the working rule is that 1 per cent of additional PAR is worth roughly 0.7-1.0 per cent of annual yield. Using 0.8 per cent and a 40 kg/m2 crop: dropping from 90 per cent LT glass to 76 per cent LT polycarbonate is a relative loss of 15.6 per cent, worth about 12.5 per cent of yield, or 480 kg on a 96 m2 house. At 1.60 USD/kg that is 768 USD per year of lost crop. The heat saved by the same swap is 1,742 USD per year in Rotterdam but only 572 USD per year of that is a genuine gain once the yield loss is netted off against a cheaper option that keeps the light.
That is the whole argument in one paragraph. In a production green house, buying U-value with transmission is a bad trade. Buy U-value with a thermal screen instead: the screen is retracted during the day, so it costs nothing in light and still cuts the night loss by roughly 45 per cent. In a conservatory, an orangerie or any structure where nobody is weighing tomatoes, the trade inverts, and thick polycarbonate or IGU is the right answer.
Production, heated: diffuse AR glass + internal thermal screen.
Production, unheated / season extension: 6 mm twin-wall PC or film; light still dominates.
Hobby ornamentals: 10-16 mm PC, comfort and safety over PAR.
Conservatory / orangerie: IGU walls, laminated roof, no PAR constraint at all.
Heating Load on a Green House: Worked Calculation for 8 x 12 m
Reference house: 8.0 m wide, 12.0 m long, 2.5 m eaves, 1.60 m rise, 22 degree duo-pitch roof. Floor 96 m2. Wall area 100 m2, gable triangles 12.8 m2, roof 103.4 m2 (slope length 4.31 m), internal volume 316.8 m3. Infiltration at 0.8 air changes per hour adds 85 W/K.
Surface
Area
Note
Walls (vertical)
100.0 m2
Perimeter 40 m x 2.5 m
Gable triangles
12.8 m2
2 x (8.0 x 1.6 / 2)
Roof (2 slopes)
103.4 m2
Slope length 4.31 m x 12 m x 2
Total envelope
216.2 m2
2.25 x floor area
Internal volume
316.8 m3
Drives infiltration and ventilation
Envelope area is 2.25 times floor area. Any quote expressed per square metre of floor has to be divided by 2.25 to be compared with a per-square-metre glazing price, and that is where most budget errors start.
Peak load and annual energy by covering
Spec
Covering
UA (W/K)
Peak W/m2
Rotterdam kWh/yr
Toronto kWh/yr
Quebec kWh/yr
S1
4 mm glass walls + 6 mm PC roof
1,080
225
32,763
56,165
64,158
S2
4 mm glass walls + 16 mm PC roof
946
197
28,686
49,175
56,173
S3
16 mm PC walls + 16 mm PC roof
506
105
15,341
26,299
30,042
S4
IGU walls + laminated IGU roof
699
146
21,215
36,369
41,544
S5
S1 + internal thermal screen
632
132
19,162
32,849
37,524
Peak loads are the sizing number: 225 W/m2 for a single-glazed house in a mild winter is in line with the 150-250 W/m2 that Dutch and British growers actually install, and 338 W/m2 at a 30 K difference matches what a Quebec grower budgets. Annual figures use degree-days to a balance temperature of 13 deg C (Rotterdam 1,750, Toronto 3,000, Quebec City 4,050 K.d), a condensing boiler efficiency of 0.90, and a free solar-gain factor of 0.65 for the two mid-latitude sites and 0.55 for Quebec, where winter sun is worth less. The resulting 341 kWh/m2 for single glass in the Netherlands sits inside the 320-420 kWh/m2 that Dutch holding records report, which is the check that matters.
The single largest driver is not the covering, it is infiltration. UA of 1,080 W/K includes only 85 W/K of air change. Take a badly sealed house at 2.0 ACH instead of 0.8 and UA rises by 127 W/K, which costs more than the entire upgrade from 6 mm to 16 mm polycarbonate roof sheet. Sealing the laps and the door is the cheapest kilowatt-hour in the building.
Payback on the four upgrade options
Option
Measure
Capex USD
Rotterdam saving/yr
Quebec saving/yr
Payback Rotterdam
Payback Quebec
U1
16 mm 5-wall PC roof instead of 6 mm
1,428
407
799
3.5 yr
1.8 yr
U2
16 mm PC walls and roof instead of glass
3,108
1,742
3,412
1.8 yr
0.9 yr
U3
Internal thermal screen on S1
2,304
1,360
2,664
1.7 yr
0.9 yr
U4
Diffuse AR glass walls
1,008
73 (yield)
73 (yield)
13.7 yr
13.7 yr
U2 looks like the winner on pure payback, and for a hobby house it is. For a production house it is not, because U2 costs 14 points of light transmission, worth roughly 768 USD per year of yield on a tomato crop. Netting that off, U2 returns 974 USD per year in Rotterdam against 1,360 USD for U3 at a lower capital cost, and U3 costs no light at all. The screen wins on every axis except simplicity.
Sizing the heater: take the peak load and add 10 per cent for cold-start recovery and 15 per cent if the house is heated from cold overnight. For S1 in Rotterdam that is 21.6 kW x 1.25 = 27 kW, i.e. a 27-30 kW unit. Undersizing by 25 per cent is the most common heating complaint and it shows up only on the three coldest nights of the year.
Ventilation: Sizing Ridge and Side Openings, and When You Need a Fan
A green house at midday in May can reach 45 deg C inside with the vents shut. Ventilation is not a comfort accessory, it is the cooling system, and it is sized from the floor area rather than from the volume.
Free area and the opening angle penalty
The standard rule for natural ventilation is a total vent free area of 15-25 per cent of floor area, split between ridge and side openings. For the 96 m2 reference house that is 14.4-24.0 m2. A continuous ridge vent 1.0 m wide over 12 m is 12 m2 gross, and a pair of side vents 1.0 m high over 12 m is 24 m2 gross. The trap is that a vent hinged at the top does not deliver its full geometric area: the free opening is the vertical projection, so effective area is roughly the geometric area multiplied by the sine of the opening angle.
Opening angle
Effective free area
Ridge (12 m2 gross)
Side (24 m2 gross)
Combined effective
15 deg
26%
3.1 m2
6.2 m2
2.8 m2
30 deg
50%
6.0 m2
12.0 m2
5.4 m2
45 deg
71%
8.5 m2
17.0 m2
7.6 m2
60 deg
87%
10.4 m2
20.9 m2
9.3 m2
90 deg
100%
12.0 m2
24.0 m2
10.7 m2
Combined effective area is the series combination of inlet and outlet, 1 / sqrt(1/A1-squared + 1/A2-squared). A common specification error is to buy a ridge vent opening to 15 degrees because the opener travel is short, and then wonder why the house still overheats: at 15 degrees you are ventilating with 2.8 m2, not 12 m2.
Stack-effect airflow: how much a chimney actually moves
Buoyancy-driven flow is Q = Cd x Aeff x sqrt(2 x g x h x dT / Ti), with Cd about 0.45 once an insect screen is fitted, h the height between inlet and outlet centre, and Ti in kelvin. For the reference house with h = 2.0 m and Ti = 305 K:
Inside-outside dT
Stack velocity
Vent angle
Airflow m3/h
Air changes / h
3 K
0.62 m/s
15 deg
2,796
8.8
3 K
0.62 m/s
30 deg
5,401
17.0
3 K
0.62 m/s
45 deg
7,638
24.1
8 K
1.01 m/s
15 deg
4,566
14.4
8 K
1.01 m/s
30 deg
8,820
27.8
8 K
1.01 m/s
45 deg
12,473
39.4
8 K
1.01 m/s
60 deg
15,277
48.2
The design target for summer ventilation is 0.010-0.015 m3/s per m2 of floor, which for 96 m2 is 3,456-5,184 m3/h. Natural ventilation delivers that at any opening angle above about 20 degrees even with a modest 3 K temperature difference. Fans are therefore not a substitute for vent area; they are a supplement for still, humid days when the stack effect collapses.
Size fan capacity at 0.010-0.015 m3/s per m2 of floor and check the figure at 25 Pa external static, not the free-air figure on the box.
Fit insect screen on every opening and derate the area by 35-45 per cent for it. A 25 mesh screen blocks more airflow than most people expect.
Ridge vents should be on the leeward side in the prevailing wind; specify the hinge side from the site wind rose, not from the drawing.
Automatic openers are either wax-filled thermal cylinders (no power, 8-12 deg C opening range, need re-calibration twice a year) or electric actuators with a thermostat (accurate, need a cable and a controller).
Circulation fans inside the house are separate from extract fans: 1 fan per 50-80 m2 at 3,000-5,000 m3/h keeps the canopy air moving and cuts botrytis.
Condensation, VPD and the Drip Line Under the Glazing Bar
Condensation forms on the coldest surface first, which in a green house is always the covering, and then runs along the underside of the glazing bar until it drips. That drip line is where seedlings rot and where botrytis starts.
Why the covering wets before the frame
In a heated house at 15 deg C and 85 per cent RH, the dew point is 12.5 deg C. Single glass at an outside temperature of 0 deg C has an inside surface temperature of about 4 deg C, so it is 8.5 K below dew point and water forms continuously. A 16 mm polycarbonate roof at the same conditions sits at about 11 deg C, still below dew point but much closer, which is one more reason the thicker sheet behaves better in practice than its U-value alone suggests.
Covering
U (roof)
Inside surface temp at 0 deg C out / 15 deg C in
Below dew point (12.5) by
Condensation
4 mm single glass
6.9
3.9 deg C
8.6 K
Continuous run-off
6 mm twin-wall PC
3.3
8.6 deg C
3.9 K
Film then droplets
10 mm twin-wall PC
2.8
9.7 deg C
2.8 K
Film mainly
16 mm 5-wall PC
2.0
11.5 deg C
1.0 K
Occasional
4-12-4 IGU
3.0
9.3 deg C
3.2 K
Film mainly
6-16-6 laminated IGU
2.2
11.0 deg C
1.5 K
Occasional
The same surface-temperature logic applies to the frame. A non-thermally-broken aluminium bar at an outside temperature of 0 deg C will sit at 3-5 deg C, and water running off the glass collects on it. The temperature factor fRsi, calculated to EN ISO 13788, is the formal check: below 0.70 you get surface condensation, below 0.80 you get mould growth on any organic dust that settles there.
Controlling it: vent heat, or raise the surface temperature
There are only three ways to stop condensation on a surface, and they are not equally cheap. Dehumidifying the air is expensive per litre of water removed. Raising the surface temperature costs whatever the extra insulation costs, once. Venting a crack at night trades a little heat for a large drop in absolute humidity, and in a green house it is usually the right answer because the crop needs the air movement anyway.
Measure
Effect on RH
Heat penalty
Capital
Best for
Night crack vent, 2-3 deg C setback
-8 to -15% RH
0.4-0.9 kW on a 96 m2 house
0 USD if vents exist
Production green house
Anti-drip coating
No change
None
3-5 USD/m2
Any polycarbonate roof
Thicker PC / IGU
No change
-30 to -50%
8-16 USD/m2
Conservatory, orangerie
Thermal break in the frame
No change
-8 to -12%
18-28 USD/m2
Occupied structures
Mechanical dehumidification
-20 to -30% RH
+1.5-3.0 kW
600-1,800 USD
Propagation and seedling houses
Circulation fans over the canopy
-3 to -6% RH
+0.1-0.2 kW
45-90 USD each
Any house, for disease control
Specify an anti-drip (hydrophilic) coating on the inner face of polycarbonate. It converts droplets to a continuous film and recovers 8-12 per cent of the light lost to scattering.
Fit a condensate channel on the glazing bar and take it to a gutter. Water that drips on the crop is a disease vector, not just an annoyance.
Keep the internal RH band at 70-85 per cent by venting a crack at night rather than letting the house seal up. A 2 deg C night vent with 1 kW of heat costs far less than a botrytis outbreak.
Thermally broken frames raise fRsi from about 0.55 to 0.75 on a conservatory, and are worth it where the structure is occupied. In a production house they are rarely justified.
Target a VPD of 0.8-1.2 kPa for most crops. Below 0.45 kPa transpiration stalls and calcium deficiency appears at the growing tip even when the nutrient solution is correct.
Aluminium in a Greenhouse: Fertiliser, Sulphur and Galvanic Corrosion
Aluminium is the right frame material for a green house because it does not rot and it carries the covering with a slim section. It is not inert. A greenhouse is a warm, wet, chemically aggressive environment, and the specific aggressors are fertiliser salts, sulphur vapour and copper-based fungicides. This section is the one most suppliers leave out of the quote.
What actually attacks an aluminium frame
Agent
Source
pH at the metal
Mechanism
Mitigation
NPK fertiliser dust
Broadcast and drip feed
4.0-6.0
Pitting under wet deposits
Rinse frames quarterly, Class 2 coating
Sulphur vapour
Sulphur burners vs red spider mite
2.0-3.0
Sulphuric acid film, dissolves anodic layer
AA20 sealed anodising, or exclude sulphur houses
Copper fungicide
Bordeaux / copper oxychloride spray
5.5-7.0
Cu2+ plates onto Al, galvanic pitting
Never spray bare aluminium; keep coating intact
Chloride
Coastal sites, sea freight
neutral
Crevice corrosion at lap joints
Class 2 powder or AA25 anodising, 316 fasteners
Ammonia
High-N feed, cleaning agents
9.0-11.0
General attack above pH 9
Avoid ammonia-based cleaners
Cement / lime wash
Dwarf wall construction
12.0-13.0
Rapid attack on bare metal
Protect frames during base construction
Aluminium is amphoteric: it dissolves below pH 4 and above pH 9, and is passive in between. A greenhouse routinely presents both ends of that range at different times of year, which is why the coating, not the alloy, carries the durability.
Coating specification: what to write in the order
System
Standard
Class / grade
Film
Pre-treatment
Typical life in a greenhouse
Polyester powder
Qualicoat
Class 1
60-80 um
Chrome-free conversion
10-15 yr
Polyester powder
Qualicoat
Class 2
60-80 um
Chrome-free conversion
5-8 yr
Super-durable powder
Qualicoat
Class 1.5 / 2
60-80 um
Conversion + primer
15-20 yr
Anodising
Qualanod
AA15
15 um
Etch + seal
10-15 yr
Anodising
Qualanod
AA20
20 um
Etch + seal
20+ yr
Anodising
Qualanod
AA25
25 um
Etch + seal
25+ yr, coastal
PVDF
AAMA 2605
70% resin
30-40 um
Conversion + primer
20+ yr
Write the coating standard and class into the order, not the words “powder coated”.
Sealed anodising (Qualanod) survives sulphur burners better than polyester powder; powder survives impact and scratching better than anodising.
On coastal sites within 5 km of the sea, go to AA25 or AAMA 2605 and 316 stainless fasteners.
Ask for the cross-hatch adhesion result (ISO 2409, Class 0) and the MEK rub test; both take minutes and both catch under-cured powder.
Fasteners and galvanic isolation
Aluminium sits at about -0.85 V on the galvanic scale. In contact with bare steel, copper or brass in a wet, salty film, the aluminium is the anode and it corrodes. Every steel fastener in a greenhouse frame is a potential galvanic cell.
Use A2 (304) stainless as a minimum and A4 (316) within 5 km of the coast or in any house that will be fumigated.
Isolate aluminium from steel base rails and from galvanised steel gutters with an EPDM or neoprene gasket, not with a bituminous tape that will creep out in the heat.
Never use copper or brass fittings, irrigation misting nozzles or pipe clips in contact with the frame.
Avoid creosote- or CCA-treated timber in contact with aluminium; both leach copper and chromium.
Where the frame meets concrete, prime the contact face with two coats of bituminous paint or bed it on a DPC strip. Fresh concrete is pH 12.5 and will etch aluminium in days.
Conservatory Specification: When Building Regulations Take Over
The moment a structure becomes occupied floor area, the design basis changes from crop science to building physics and the rules on this page stop being the governing ones. A conservatory is a room; a green house is a tool.
Thermal break, IGU and U-value targets
Element
Green house (production)
Conservatory (occupied)
Standard
Frame
Non-broken 6063-T5, Uf 5.0-7.0
Thermally broken, Uf 1.8-2.6
EN ISO 10077-2
Wall glazing
4 mm single, Ug 5.8
4-12-4 Low-E argon, Ug 1.1
EN 673
Roof glazing
6-16 mm PC or tempered, Ug 2.0-3.3
6-16-6 laminated, Ug 1.1-1.3
EN 673
Whole element Uw
5.5-6.5
1.4-2.0
EN ISO 10077-1
Condensation check
Not required
fRsi >= 0.70
EN ISO 13788
Air permeability
Not required
Class 2-4, 600 Pa
EN 12207
Water tightness
Not required
Class 7A-9A
EN 12208
Solar control
Maximise g
g 0.30-0.45 to limit overheating
EN 410
The solar control row is the one that surprises people. A production green house wants a g-value as high as it can get. A conservatory on a south-facing wall in the UK or a west-facing wall in France will overheat every afternoon from May to September unless the roof glazing carries a solar-control coating that brings g down to roughly 0.35. Specifying production glass in an occupied room produces a space nobody uses for four months of the year.
Safety glazing, ventilation and the CE question
All glazing within 800 mm of floor level, and all glazing in doors and side panels, has to be safety glass: EN 12150 tempered or EN 14449 laminated. In the US, ANSI Z97.1 and CPSC 16 CFR 1201. In the UK, BS EN 12600 Class 1B1 minimum for critical locations.
Overhead glazing must retain fragments after breakage. Tempered glass meets the impact test but crumbles; laminated glass with a PVB or SGP interlayer meets the retention requirement. For a conservatory roof, specify laminated with the laminated pane on the inside.
Ventilation: background ventilation plus a purge rate. Mechanically, size for 3 air changes per hour, or use the window-area rule of 1/20th of floor area with at least 1/10th of that as high-level opening for stack effect.
Structural: the aluminium frame is a load-bearing kit and carries a CE mark under EN 1090-1 at EXC1, with a Declaration of Performance. The glazing carries its own DoP under EN 14351-1 for windows and doors, or EN 12150 / EN 14449 for the glass itself.
Electrical: any motorised vent, heater or lighting in the structure needs CE / UKCA, and in North America UL or ETL listing. Wax-cylinder openers avoid the issue entirely and are worth considering for that reason alone.
Orangerie Greenhouse: The Glazed Roof with a Solid Ceiling
An orangerie is the hybrid that most buyers actually want and few suppliers describe accurately. It has a solid, insulated roof over the perimeter of the room with a raised glazed lantern at the centre, and full-height glazed walls. The result is a room that is bright without behaving like a glass box.
What changes structurally
Element
Conservatory
Orangerie
Consequence
Roof build-up
Fully glazed
Solid perimeter + glazed lantern
Roof U falls to 0.15-0.25
Glazed roof area
100% of footprint
20-35% of footprint
Solar gain cut by 65-80%
Lantern structure
n/a
Kerbs, hips, ridge, cresting
More aluminium by mass, fewer glass m2
Roof snow load
Governs glazing bar
Governs the solid roof only
Lantern is small and shielded
Internal ceiling
Exposed glazing
Plastered solid ceiling
Needs a vapour control layer
Typical floor area
10-30 m2
20-60 m2
Orangeries tend to be larger
Because the glazed area is a small fraction of the footprint, an orangerie does not need solar-control glass to the same degree, and the lantern is usually the only place where a high-performance coating is worth paying for. The frame requirement per square metre of floor is in fact higher than a conservatory, because the lantern kerb, hips and ridge all have to be built, so the per-m2 frame cost does not fall in proportion to the glazing area.
Sizing the lantern and the cresting detail
Lantern glazed area: 15-25 per cent of floor area is the practical band. Below 12 per cent the room reads as dark at the centre in winter; above 30 per cent you are back to conservatory overheating.
Lantern height above the solid roof: 500-900 mm. Below 500 mm the lantern reads as a rooflight and looks undersized from inside.
Glazing bar span in the lantern: usually 1.2-2.0 m, so P2 or P3 sections are adequate even in LC3 snow regions. This is the one place where snow stops governing.
Cresting and finials are decorative aluminium castings, 1.5-3.0 kg each. They are the most commonly omitted item in a value-engineered quote and the most visible.
Ventilation: put 1-2 opening vents in the lantern for purge and rely on the room windows for background. Stack effect through a lantern is strong because the height differential is large.
Specification trap: an orangerie is quoted per square metre of floor area and a conservatory per square metre of glazed envelope. The two numbers are not comparable: a 30 m2 orangerie has about 55 m2 of glazing, a 30 m2 conservatory about 75 m2. Always convert to glazed area before comparing quotes.
From Billet to Kit: Process, Tolerances and Inspection Points
A greenhouse kit is a cut-list problem more than a fabrication problem. Every bar is cut to length, punched for its fixings, and packed against a numbered drawing. The process below is a standard 6063-T5 route with polyester powder coating.
Twelve process steps and where the time goes
#
Step
Control parameter
Days
Share
1
Billet cast and homogenise
6063 composition, Mg 0.45-0.90%, Si 0.20-0.60%
0.5
2%
2
Extrusion
Die temperature 460-500 deg C, exit speed 8-20 m/min
0.5
2%
3
Stretch and age
T5: cool and age 8 h at 175 deg C
1.0
4%
4
Cut to length
+/- 0.5 mm on bars under 3 m
0.5
2%
5
Punch / CNC
Hole position +/- 0.3 mm
0.5
2%
6
Bend (hips, ridges)
Angle +/- 0.5 deg
0.5
2%
7
Deburr and wash
No cutting oil residue
0.3
1%
8
Pre-treatment
Chrome-free conversion, rinse conductivity
0.5
2%
9
Powder coating
Cure 200 deg C for 10 min metal temperature
1.0
4%
10
Glass / PC cutting
Pane size +/- 1.5 mm, edge arris
2.0
8%
11
Kit assembly and check-build
Full dry assembly of one unit per size
2.0
8%
12
Pack and label
Numbered bundles against the cut list
1.0
4%
That accounts for roughly 10 days of the 20-35 day lead time. The remaining time is queue, coating line scheduling, and the buyer-side step that is almost always the longest single item: drawing approval, 5-9 days, or 17-30 per cent of the total. It is the only step the buyer controls, and it is the only one worth compressing. Approve the shop drawings within 24 hours and the lead time drops by a week at no cost.
Inspection points that matter
Alloy certificate: EN 573-3 composition and EN 755-2 mechanical properties for the heat lot.
Wall thickness: measure at three points on a cut end, minimum 90 per cent of nominal.
Coating thickness: 60-80 um dry film, ISO 2360, measured on six faces of the bar.
Coating cure: MEK double rub, 50+ rubs without softening.
Adhesion: ISO 2409 cross-hatch, Class 0.
Cut length: +/- 0.5 mm; a 2 mm error on a glazing bar produces a visible step at the ridge.
Glass: EN 12150 fragment count report, or EN 14449 for laminate; check the pane size and the edge work.
Polycarbonate: UV-side marking on the film, sheet thickness measured with a caliper on a cut offcut, co-extruded layer present on the marked face.
Hardware: stainless grade verified by a spot test, not by the box label.
Check-build: insist that one complete unit is dry-assembled and photographed before the container is loaded. This single step catches more errors than all the others combined.
FOB Pricing, MOQ, Lead Time and Container Loading
Prices below are FOB Shenzhen or Foshan in USD per square metre of floor area, which is how greenhouse kits are quoted. To convert to glazed envelope area, divide by 2.25. To convert to a whole-set figure for the 96 m2 reference house, multiply by 96.
FOB matrix by configuration and quantity
Ref
Configuration
1-2 sets
3-9 sets
10-29 sets
30+ sets
G1
4 mm glass walls, 6 mm PC roof, 1 door, no vents
95
78
62
48
G2
5 mm tempered walls, 10 mm PC roof, ridge vent
130
110
92
76
G3
6 mm tempered walls, 16 mm PC roof, ridge + side vents
185
160
138
118
G4
Full glass, 6 mm tempered walls and roof, ridge vent
235
205
180
158
G5
Orangerie, solid kerb + glazed lantern, cresting
275
240
212
188
G6
Conservatory spec, IGU walls, laminated IGU roof
420
370
330
295
G1 to G6 spans 48-420 USD/m2 of floor, a factor of nearly nine. The spread is driven by glazing, not by aluminium: the frame is 18-32 per cent of the kit cost in every configuration, and the covering plus hardware is the rest. A buyer who needs to cut budget should first reduce the vent specification and the glass thickness, and only then the frame section, because the frame is what cannot be retrofitted.
Options and additions
Item
Unit
Add
Item
Unit
Add
Thermal break in frame
USD/m2
18-28
Automatic vent opener (wax)
USD each
22-38
Diffuse AR glass upgrade
USD/m2
8-12
Electric actuator + thermostat
USD each
85-140
Heat-soak testing
USD/m2
4-7
Louvre side vent
USD/m2
32-48
Anti-drip coating
USD/m2
3-5
Circulation fan
USD each
45-90
Laminated roof glass
USD/m2
22-35
Thermal screen + drive
USD/m2 floor
18-28
AAMA 2605 / PVDF
USD/m2
12-18
Staging benches
USD/m2 floor
14-22
AA25 anodising
USD/m2
10-16
Gutter + downpipe kit
USD/m
18-30
316 stainless fasteners
USD/set
35-90
Base / dwarf wall channel
USD/m
12-20
Insect screen 25 mesh
USD/m2
6-10
LED supplementary lighting
USD/m2 floor
45-120
Double door upgrade
USD each
120-260
Shade cloth 50%
USD/m2
4-8
Commercial terms, packing and container loading
Item
Term
MOQ
1 set for samples; production pricing from 20 m2 / 3 sets
Lead time
20-35 days after drawing approval; 15 days for a repeat order
Payment
T/T 30% deposit, 70% before shipment; L/C at sight for 30+ sets
Incoterm
FOB Shenzhen / Foshan standard; EXW, CIF and DDP available
Packing
EPE foam + kraft, plywood crate with steel strapping; glass in A-frame crates
Warranty
10 yr frame coating, 5 yr hardware, 2 yr moving parts
Documents
DoP for the frame under EN 1090-1, glass certificates, packing list, CoO
Container loading is where glass greenhouses surprise people. A 40 ft high-cube gives about 68 m3 of usable volume and a 25 t payload. Glass is dense, so the payload limit arrives long before the volume does:
Kit
Configuration
Mass
Volume
By payload
By volume
Per 40HQ
Limit
Freight/set
K1
4 mm glass + 6 mm PC
1,473 kg
1.85 m3
16
36
16
Payload
175 USD
K2
5 mm tempered + 10 mm PC
1,808 kg
2.05 m3
13
33
13
Payload
215 USD
K3
6 mm tempered + 16 mm PC
2,248 kg
2.30 m3
11
29
11
Payload
255 USD
K4
Full glass 6 mm
3,495 kg
2.55 m3
7
26
7
Payload
400 USD
K5
Conservatory IGU spec
5,630 kg
2.90 m3
4
23
4
Payload
700 USD
Every configuration is payload-limited, and the full-glass kit is the extreme case: 26 would fit by volume but only 7 fit by weight. Two consequences follow. First, never ship a glass greenhouse LCL if you can avoid it: at 5 sets the freight is roughly 560 USD per set against 175-400 USD in a full container, and glass breaks far more often in LCL because it is handled more. Second, swapping the walls from glass to polycarbonate roughly doubles the number of sets per container and halves the freight per set, which is worth checking against the light loss before you commit.
Installation Sequence and the Six Failure Points
A 96 m2 kit installs in 2-3 days with three people and a scaffold tower. The sequence matters because every step is a tolerance that the next step inherits.
Sequence
Set out and build the base. Concrete strip footing or a cast plinth, level to +/- 3 mm over the full length. A base that is out of level by 10 mm produces a door that will not latch and a glazing bar that will not seat.
Fix the base rail on a DPC strip, shimmed, with M10 anchors at 600 mm centres. Isolate the aluminium from the concrete.
Stand the corner posts and plumb them in two axes. Brace before you release the post.
Build the gable ends, then the eave beam. Square the frame by measuring both diagonals: they must agree within 5 mm.
Fit the glazing bars from eave to ridge, then the ridge beam. Do not fit the ridge until every bar is seated.
Fit the gutter and set the fall: minimum 0.5 per cent, 1 per cent preferred. Standing water in a gutter breeds mosquitoes and splits the joint in a freeze.
Glaze the walls. Two EPDM setting blocks per pane at the quarter points, 4-5 mm edge clearance all round, and glazing clips at the specified centres.
Glaze the roof with PC: oversize holes, 3-4 mm per metre expansion gap, UV face out, anti-drip face in, breather tape at the bottom, aluminium tape at the top.
Fit doors, vents and openers. Set the wax cylinders to open at the target temperature and re-check them at the start of each season.
Seal the perimeter with neutral-cure silicone, flood-test the gutters, and run every vent through five full cycles before sign-off.
Six failure points, in order of how often they happen
#
Failure
Mechanism
Cost to fix later
Prevention
1
PC sheet buckles or pulls out
No expansion gap, holes drilled tight
120-260 USD/sheet + labour
Oversize holes, shoulder washers, 3-4 mm/m gap
2
Drip line under the glazing bar
No anti-drip coating, no condensate channel
Crop loss, 8-12% light
Specify anti-drip + condensate channel
3
Glass pane slides and cracks
Missing setting blocks, edge clearance too tight
90-180 USD/pane
Two setting blocks at quarter points, 4-5 mm clearance
4
Gutter stands or splits
Fall under 0.5%, no expansion joint
180-400 USD
1% fall, slip joint every 6 m
5
Frame pitting at the base rail
Aluminium on wet concrete, pH 12.5
Base rail replacement
DPC strip + bituminous paint on the contact face
6
Vents open at the wrong temperature
Wax cylinder not calibrated, linkage slop
Overheating or chill damage
Calibrate at commissioning and twice yearly
Points 1, 2 and 3 are specification issues, not workmanship issues. They are decided at the order stage and cannot be fixed on site, which is why the covering and glazing accessory schedule deserves as much attention as the frame.
Two Projects and a Material Comparison
Two builds, one snow-governed and one specification-governed, with the numbers that were actually signed off.
Quebec, Canada: 96 m2 production green house, snow-governed
Item
Value
Size
8.0 x 12.0 m, 96 m2 floor, 2.5 m eaves, 22 deg pitch
Ground snow (NBCC 2020)
2.20 kN/m2; roof snow 1.76 kN/m2 with mu = 0.8
Design total
2.06 kN/m2 including 0.30 dead
Glazing bar
P4 80 x 50 x 2.0 at 750 mm centres, span 4.31 m
Bar span check
Max permissible 1.71 m at 750 mm centres in LC4 – does not work
Resolution
Intermediate purlin at mid-slope, effective span 2.15 m; utilisation 0.71
Alternative rejected
P6 120 x 60 x 3.0 full span – 2.07 x the frame mass, +680 USD
Walls
6 mm tempered, panes 1.05 x 2.10 m (limit 1.25 m short span)
Roof
16 mm 5-wall PC, anti-drip, U 2.0, LT 76%
Heating
UA 946 W/K, peak 28.4 kW at dT 30 K; 29 kW condensing unit installed
Annual energy
56,173 kWh (585 kWh/m2), 5,617 USD/yr at 0.10 USD/kWh
Ventilation
Ridge 1.0 m x 12 m at 45 deg + 2 side vents; 12,473 m3/h at dT 8 K
Delivered FOB
15,360 USD (160 USD/m2, G3 at 10-29 sets)
Freight + duty to Montreal
3,060 USD; landed 19,180 USD
Installed total
27,900 USD (291 USD/m2)
Local quotation
45,300 USD (472 USD/m2)
Saving
17,400 USD, -38.4%
Observations at 18 months
Roof snow shedding normal, 0 bar deflection complaints, 2 of 12 wax openers re-calibrated after the first winter
The interesting line is the bar span check. At 2.06 kN/m2 no reasonable glazing bar makes 4.31 m at 750 mm centres, and increasing the section to P6 would have added 680 USD of aluminium for the same result. An intermediate purlin at mid-slope halved the effective span for about 90 USD of material. This is the same argument as for a glass door frame or a glass garage door panel: when deflection governs, add a support, do not buy a bigger section.
Solid insulated perimeter U 0.18 + glazed lantern 3.0 x 1.8 m (20% of floor)
Lantern glazing
6-12.8-6 laminated Low-E, Ug 1.1, g 0.35, LT 71%
Walls
4-16-4 IGU in thermally broken frames, Uw 1.6
Frame
Thermally broken, Uf 2.2, fRsi 0.76 (EN ISO 13788 pass)
Snow
0.60 kN/m2 ground, LC1 equivalent
Vents
2 lantern vents, wax openers, 18 deg C setpoint
Coating
Qualicoat Class 1, anthracite, 70 um
Delivered FOB
6,480 USD (240 USD/m2, G5 at 3-9 sets)
Freight + duty to Felixstowe
1,290 USD; landed 7,940 USD
Installed total
13,600 USD (504 USD/m2)
Local quotation
21,900 USD (811 USD/m2)
Saving
8,300 USD, -37.9%
Overheating check
Peak internal 27.4 deg C against 34.1 deg C for a fully glazed roof of the same footprint
The 6.7 K reduction in peak internal temperature is entirely due to cutting the glazed roof area from 100 per cent to 20 per cent of the footprint. That is the argument for an orangerie over a conservatory in a south-facing UK garden, and it costs about 15 per cent more per square metre of floor.
Frame material comparison
Criterion
Aluminium
Galvanised steel
Timber
uPVC
Mass per m of bar
0.54-3.63 kg
1.8-7.5 kg
2.5-6.0 kg
1.6-3.2 kg
Section depth for the same span
Slimmest
Similar
Deepest
Deepest, needs liner
Corrosion in a wet, fertilised environment
Good with Class 1/AA20
Good if Z275+
Poor without treatment
Excellent
Reaction to sulphur vapour
Attacked, needs sealed anodising
Attacked
Attacked
Resistant
Maintenance interval
10 yr (rinse yearly)
10-15 yr
2-3 yr
None
Max span without intermediate support
3.9 m (P7)
4.5 m
2.4 m
1.8 m
Thermal conductivity
High, needs a break
High
Low
Low
Recycled content
60-80% typical
30-50%
0%
Low
Tooling cost for a custom profile
600-1,500 USD
2,000-5,000 USD
n/a
8,000-20,000 USD
FOB frame cost index
100
85
120
95
Steel is cheaper per metre and spans further, which is why commercial Venlo structures are steel. For anything under about 200 m2, aluminium wins on tooling cost, maintenance and the ability to carry a coating that survives the chemistry. Timber looks right on a heritage orangerie and needs repainting every three years. uPVC is cheapest to run but cannot span, so it needs a steel or aluminium liner above about 2.5 m, at which point the cost advantage disappears.
Choose aluminium when: the span is under 4 m, the environment is wet or fertilised, or you want a custom profile without a five-figure tooling bill.
Choose steel when: the span exceeds 5 m, the structure is a multi-span Venlo, or the frame will carry hanging crop loads above 25 kg/m2.
Do not choose aluminium when: the house will be sulphur-fumigated regularly and the budget does not allow sealed anodising, or when the frame will be in direct contact with wet concrete or CCA-treated timber.
RFQ Checklist, Glossary and Standard Index
Send these 16 points with the enquiry and you will get a quote that can actually be compared with another one.
Technical items to specify
Dimensions: width, length, eaves height, ridge height, roof pitch, door positions and sizes.
Design code and loads: ground snow sk, basic wind velocity, terrain category, roof shape coefficient, whether asymmetric snow is required.
Covering: walls and roof separately, with thickness, structure (twin/3-wall/5-wall), LT, U-value, anti-drip yes/no, UV warranty years.
Glass: annealed / heat-strengthened / tempered / laminated, thickness, edge work, heat-soak yes/no, EN 12150 or EN 14449 certificate required.
ROGENILAN supplies aluminium green house kits, glass greenhouse structures, conservatories and orangeries from Foshan, Guangdong. Frame extrusion, coating, glazing and hardware are produced in-house; shop drawings are issued within 72 hours of order confirmation.