Thermal break aluminium sliding windows on a residential facade – slim 90 mm sightlines, double glazing, roller carriage in the bottom rail.
A fentre coulissante en aluminium is not a glazed frame that happens to slide. It is a rolling assembly, a drainage assembly and a deflection-controlled frame, in that order. Every field failure we see on fentres coulissantes en aluminium comes from one of those three systems, and almost never from the glass. This page gives the numbers behind each one: per-wheel roller loads, Hertz contact stress against an aluminium rail, drain slot capacity against a 2 L/min/m2 spray rate, interlock section required for a 2 400 mm leaf in wind zone 3, and FOB pricing from 88 to 276 USD/m2 with the option adders that actually move a quote.
Why a Fentre Coulissante en Aluminium Is a Rolling System, Not a Glazed Frame
A casement sash hangs on friction hinges and compresses its seals. A sliding leaf does neither. Its entire dead load sits on two roller carriages running on a bottom rail, and its seals are brushes or sliding wipers that never compress. That single difference explains why sliding products sit two to three classes below casement on EN 12207 air permeability and one to three classes below on EN 12208 water tightness, even when both are built from the same extrusion and the same glass.
Load path: glass, sash, carriage, rail, slab
The chain is short and every link is quantifiable. Glass dead load goes into the sash rabbets, the sash rails carry it to the two stiles, the stiles deliver it to the two roller carriages under the bottom rail, and each carriage spreads it over its wheels into the rail. The rail delivers it to the frame, the frame to the anchors, the anchors to the slab. There is no redistribution path: if the bottom rail is not level, the load does not find another route, the leaf simply drags.
Panel
Leaf size
Glazing
Glass area m2
Glass kg
Frame kg
Leaf kg
Weight N
Load/wheel N
standard 1200 x 2150
1200×2150 mm
4-16Ar-4 float
2.01
40
21
63.4
622
233
standard 1200 x 2150
1200×2150 mm
5-16Ar-5 Low-E
2.01
50
21
73.4
720
270
standard 1200 x 2150
1200×2150 mm
6-16Ar-6 float
2.01
60
21
83.5
819
307
standard 1200 x 2150
1200×2150 mm
4-16Ar-4-16Ar-4 Low-E
2.01
60
21
83.5
819
307
standard 1200 x 2150
1200×2150 mm
6-16Ar-44.2 acoustic
2.01
74
21
97.5
957
359
large baie 1500 x 2400
1500×2400 mm
4-16Ar-4 float
2.93
59
24
85.2
836
314
large baie 1500 x 2400
1500×2400 mm
5-16Ar-5 Low-E
2.93
73
24
99.8
979
367
large baie 1500 x 2400
1500×2400 mm
6-16Ar-6 float
2.93
88
24
114.5
1123
421
large baie 1500 x 2400
1500×2400 mm
4-16Ar-4-16Ar-4 Low-E
2.93
88
24
114.5
1123
421
large baie 1500 x 2400
1500×2400 mm
6-16Ar-44.2 acoustic
2.93
108
24
135.0
1324
496
grand panneau 1800 x 2500
1800×2500 mm
4-16Ar-4 float
3.76
75
27
104.2
1022
383
grand panneau 1800 x 2500
1800×2500 mm
5-16Ar-5 Low-E
3.76
94
27
123.0
1207
453
grand panneau 1800 x 2500
1800×2500 mm
6-16Ar-6 float
3.76
113
27
141.8
1391
522
grand panneau 1800 x 2500
1800×2500 mm
4-16Ar-4-16Ar-4 Low-E
3.76
113
27
141.8
1391
522
grand panneau 1800 x 2500
1800×2500 mm
6-16Ar-44.2 acoustic
3.76
139
27
168.1
1649
618
Load per wheel applies a dynamic factor of 1.5 to the static weight. That factor is not a safety margin; it is the measured impact when a wheel crosses a rail joint, a screw head or a grain of sand. Four wheels are assumed: two carriages of two wheels. A single-wheel carriage doubles the per-wheel load and with it the contact stress.
Why the load number matters more than the mass number
The acoustic build-up 6-16Ar-44.2 turns a standard 1 200 x 2 150 leaf from 63.4 kg into 97.5 kg, a 54 % increase, purely from glass specification. Nothing else in the order changes on paper, but the per-wheel load goes from 233 N to 359 N and the roller specification moves up one or two grades. On the large 1 500 x 2 400 leaf the same glass choice takes the leaf to 135 kg and 496 N per wheel, which is outside the rating of every nylon-bushed roller on the market. This is the single most common specification error on fentres coulissantes en aluminium: the glazing is upgraded for acoustics, the carriage is not, and the rollers fail in year two.
When you compare quotations, ask for the roller rating in newtons per wheel, not the leaf mass in kilograms. A quote that states “rollers rated 120 kg” without saying per wheel or per carriage is a 2x uncertainty on the number that decides service life.
Roller Selection: Contact Stress, Material and L10 Life
Roller selection has two independent limits. The first is Hertzian contact stress between the wheel and the rail, which decides whether the rail dents. The second is bearing fatigue life, which decides nothing at all in practice – the numbers below show why.
Hertz contact stress against a bare aluminium rail
Treat the wheel as a cylinder of radius R and contact width b = 8 mm running on a flat rail. With equivalent modulus E* from the two materials, the half-width of the contact patch is a = sqrt(8FR / (pi b E*)) and the peak pressure is p = 2F / (pi a b). Against a bare 6063-T6 aluminium rail the equivalent modulus is 39 277 MPa for an aluminium wheel and 58 605 MPa for a steel wheel. The rail yields at 170 MPa.
Read the steel row first. A 28 mm steel wheel at 450 N per wheel produces 194 MPa on the rail, above the 170 MPa yield of 6063-T6. At 650 N it reaches 233 MPa. The wheel does not fail – the wheel is steel – but the rail takes a permanent groove, and after a few thousand cycles every wheel passing over that spot takes an impact. This is why a steel-wheel specification is incomplete without a stainless rail insert, or without going to a 50 mm wheel where 450 N returns 145 MPa. The insert costs 7 – 11 USD/m2 and is the cheapest insurance on the whole system.
Polymer wheels invert the problem. POM at 28 mm and 450 N gives 44 MPa, well under the 90 – 110 MPa compressive strength of the material, so the wheel survives and the rail survives. PA66 GF25 is stiffer (E* 4 814 MPa) and therefore concentrates more: 56 MPa at the same load, still acceptable, but with less margin and a harder, noisier ride. Polymer wheels fail by flat-spotting when a leaf is left parked for a season, and by moisture absorption in a coastal climate, not by exceeding contact stress.
L10 bearing life, and why it is not the governing limit
L10 = (C / P)^3 x 10^6 revolutions, where C is the dynamic load rating of the bearing and P the per-wheel load. A 1 100 mm travel gives about 25 revolutions per open-and-close cycle for a 28 mm wheel. At eight cycles a day that is 2 920 cycles per year.
Roller
Dia
Wheel / bearing
C
Price idx
233 N – 4-16Ar-4 float
270 N – 5-16Ar-5 Low-E
307 N – 6-16Ar-6 float
307 N – 4-16Ar-4-16Ar-
359 N – 6-16Ar-44.2 ac
R1
22 mm
Nylon PA6, plain bushing
245 N
x1.00
1.2 M rev / 12 yr
P > C, not usable
P > C, not usable
P > C, not usable
P > C, not usable
R2
25 mm
POM, sealed ball bearing
440 N
x1.55
6.7 M rev / 82 yr
4.3 M rev / 53 yr
2.9 M rev / 36 yr
2.9 M rev / 36 yr
1.8 M rev / 22 yr
R3
28 mm
POM, sealed ball bearing
690 N
x2.10
26.0 M rev / 356 yr
16.7 M rev / 228 yr
11.4 M rev / 156 yr
11.4 M rev / 156 yr
7.1 M rev / 97 yr
R4
28 mm
Steel, sealed ball bearing
980 N
x3.40
74.4 M rev / 1019 yr
47.8 M rev / 655 yr
32.5 M rev / 445 yr
32.5 M rev / 445 yr
20.3 M rev / 278 yr
R5
34 mm
PU-coated twin wheel
1470 N
x4.80
251.1 M rev / 4176 yr
161.4 M rev / 2683 yr
109.8 M rev / 1825 yr
109.8 M rev / 1825 yr
68.7 M rev / 1142 yr
R6
42 mm
Tandem steel carriage
2450 N
x8.20
1162.6 M rev / 23879 yr
747.1 M rev / 15346 yr
508.3 M rev / 10439 yr
508.3 M rev / 10439 yr
317.8 M rev / 6528 yr
For a standard leaf every usable roller returns a fatigue life measured in centuries. That is not a modelling error, it is the correct conclusion: bearing fatigue never governs a window roller. What governs is contamination, corrosion, flat-spotting and rail damage. A sealed bearing buried in track dust and salt fails in five to eight years regardless of a 355-year L10. Two specification consequences follow, and they are cheap:
Sealed bearings beat open ones. A 2ZZ metal shield keeps the factory grease in and the mortar dust out. The price difference is under 1 USD per carriage.
Ask for the rail, not just the wheel. A stainless insert on the bottom track costs 7 – 11 USD/m2 and removes the only failure mode that destroys the frame rather than a serviceable part.
Park position matters. Polymer wheels flat-spot if the same leaf sits in the same position for months. On a showroom or a seasonal residence, specify PU-coated or steel wheels with the rail insert.
Adjustment access is a design decision. A carriage adjustable through the leaf stile can be re-levelled in five minutes. One that requires lifting the leaf out needs two fitters and an hour.
Rail, Drainage and Water Tightness on a Sliding Track
A sliding bottom rail is a gutter that also happens to carry a wheel. Water that gets past the outer brush must be collected, moved sideways to a weep slot and expelled, without ever reaching the inner track. Getting that wrong is the source of most EN 12208 failures on fentres coulissantes en aluminium.
Slot capacity against a real spray rate
EN 1027 and EN 12208 test at roughly 2 L/min/m2 of spray. On a 2 400 x 2 150 opening – 5.16 m2 – that is 10.3 L/min landing on the frame, and 15.5 L/min at a 3 L/min/m2 driving-rain assumption. Flow through a rectangular slot is Q = Cd A sqrt(2gh), with Cd about 0.62 and h the water head standing in the chamber, typically 25 to 50 mm.
Slot
Area
Q at 25 mm head
Q at 50 mm head
Capillary hold-up
3×10 mm
30 mm2
0.78 L/min
1.11 L/min
4.9 mm
5×12 mm
60 mm2
1.56 L/min
2.21 L/min
3.0 mm
5×20 mm
100 mm2
2.61 L/min
3.68 L/min
3.0 mm
6×25 mm
150 mm2
3.91 L/min
5.53 L/min
2.5 mm
8×30 mm
240 mm2
6.25 L/min
8.84 L/min
1.9 mm
10×40 mm
400 mm2
10.42 L/min
14.74 L/min
1.5 mm
A 5 x 12 mm slot, which is what most factories punch as standard, passes 1.56 L/min at 25 mm head. The test demands 10.3 L/min. Four slots gets you there on paper; in the field, two of them will be blocked by mortar within a year, so the design capacity has to be built with redundancy, not with the minimum. The practical rule is to size for the 3 L/min/m2 case and then double the slot count.
Capillary hold-up is the trap nobody checks. Surface tension holds water in a parallel gap of height h = 2 sigma / (rho g d). At 20 C that is 3.0 mm for a 5 mm slot, 2.5 mm for 6 mm and 1.5 mm for 10 mm. A slot narrower than about 5 mm simply stops draining: it holds its own water by surface tension and then freezes, or grows a biofilm, or wicks back to the inner track. Slot width is a specification item, not a punching detail.
Pressure equalisation and the two-chamber rule
Water tightness classes above about 4A on a slider are not achieved by better brushes. They come from pressure equalisation: an outer chamber open to the outside so that wind pressure acting on the leaf is not pushing water across the inner seal, and an inner chamber drained independently. The two chambers must not share a drain path, because a shared path lets the pressure pulse from the outer chamber blow water into the inner one.
Outer chamber: drained directly to the outside face, slots at 300 – 400 mm centres, minimum 5 mm clear width.
Inner chamber: drained through a separate channel, with a baffle or a one-way flap so a wind gust cannot reverse the flow.
Roller track: drained to the outer chamber only. Water in the wheel track is the number one cause of bearing corrosion.
Rail joint: sealed with butyl and a mechanical splice. A butt joint with silicone alone opens after one thermal season.
Level tolerance: 1 mm per metre. Beyond that the leaf will not self-drain and will not run true, and no amount of carriage adjustment fixes it.
The result of getting this right is visible in the class table. Inline sliders land at 3A – 5A. Lift-and-slide, which can compress a full perimeter gasket when closed, reaches 6A – 8A. That is the entire commercial argument for lift-and-slide, and it is worth 40 – 60 USD/m2 on a project with an exposed west elevation.
Baie Vitre Coulissante: Subdivision, Span and Interlock Deflection
A baie vitre coulissante is where sliding systems stop behaving like windows and start behaving like frames. At 2 400 mm leaf height and above, the controlling member is no longer the bottom rail – it is the interlock, the vertical meeting stile where the sliding leaf closes against the fixed leaf. It spans the full leaf height with nothing supporting it in between, and it carries the wind reaction from the leaf.
What the deflection limit actually is
Standards give L/200 or L/300, which at 2 400 mm is 12 mm or 8 mm. Neither is the real limit. The real limit is the seal engagement tolerance of the interlock: the hook-and-flange geometry plus its brush or bulb seal has about 8 mm of working engagement. Deflect the interlock more than that and the brushes separate, wind-driven rain walks straight through the joint, and the two leaves visibly rack against each other. Eight millimetres is therefore the design number, and it governs before L/200 does on any leaf taller than 1 600 mm.
The consistent finding across every section in the table is the same one we see on garage doors and greenhouses: deflection governs, not strength. At the 8 mm limit the bending stress in the interlock is a small fraction of the 155 MPa allowable for 6063-T6. The member is not close to breaking; it is simply too flexible. Which means the fix is always a stiffness fix, and stiffness is bought with depth, not with wall thickness.
Section
B x H x t
I (mm4)
W (mm3)
Mass
0.5 kPa
1.0 kPa
1.5 kPa
2.0 kPa
2.5 kPa
I1
30x40x1.6
48,700 mm4
2,435 mm3
0.58 kg/m
1626 mm
1367 mm
1235 mm
1149 mm
1087 mm
I2
35x55x1.8
129,926 mm4
4,725 mm3
0.84 kg/m
2077 mm
1747 mm
1579 mm
1469 mm
1389 mm
I3
40x70x2.0
280,845 mm4
8,024 mm3
1.14 kg/m
2519 mm
2118 mm
1914 mm
1781 mm
1685 mm
I4
45x90x2.2
611,649 mm4
13,592 mm3
1.55 kg/m
3060 mm
2573 mm
2325 mm
2164 mm
2046 mm
I5
50x110x2.5
1,204,740 mm4
21,904 mm3
2.09 kg/m
3625 mm
3048 mm
2755 mm
2563 mm
2424 mm
I6
60x130x3.0
2,405,192 mm4
37,003 mm3
2.98 kg/m
4309 mm
3624 mm
3274 mm
3047 mm
2882 mm
The table gives the maximum leaf height for each interlock at a 600 mm tributary width feeding it. Read the 1.0 kPa column, which is a typical French zone 3 value with a modest height factor: a 30 x 40 x 1.6 mm interlock is exhausted at 1 367 mm, so it is simply not usable on a full-height leaf. A 40 x 70 x 2.0 reaches 2 118 mm, and 45 x 90 x 2.2 reaches 2 573 mm.
Required interlock section by leaf height and wind zone
Leaf height
0.5 kPa
1.0 kPa
1.5 kPa
2.0 kPa
2.5 kPa
1800 mm
I2
I3
I3
I4
I4
2100 mm
I3
I3
I4
I4
I5
2400 mm
I3
I4
I5
I5
I5
2700 mm
I4
I5
I5
I6
I6
French wind zones map directly onto these columns: zone 1 at 0.32 kPa sits below the 0.5 kPa column, zone 2 at 0.39 kPa likewise, zone 3 at 0.47 kPa is effectively 0.5, zone 4 at 0.56 kPa is between 0.5 and 1.0, and a coastal or elevated site with a height factor lands at 1.0 – 1.5. So a 2 400 mm leaf in La Rochelle or Sete needs a 45 x 90 x 2.2 interlock, and a 2 700 mm leaf in an exposed Corsican site needs 50 x 110 x 2.5 or better.
Subdivision beats section. Halving the leaf width or adding a fixed transom above the leaves cuts the interlock span and the required I by a factor of sixteen, because deflection goes as L to the fourth. Adding one horizontal transom costs far less than moving up three interlock sizes – the same argument as adding a strut to a glass garage door panel or a purlin to a greenhouse roof.
French practice adds one more constraint. The standard French baie dimension is a 2 400 x 2 150 rough opening for a two-leaf slider, and the leaf is usually split 1 200 / 1 200. If the architect asks for a wider opening, the correct answer is almost always three leaves rather than two wide ones: three 1 000 mm leaves keep every interlock in the I1 – I2 range and let you pass a 1 000 mm clear opening, which matters for furniture and for PMR circulation.
Three mechanisms carry the French market for a fenetre coulissante or a baie, and they are not interchangeable. The choice is made at extrusion stage and cannot be changed on site.
Inline, lift-and-slide and pocket: seven-point comparison
Parameter
Coulissant classique (inline)
Coulissant a levage (lift-and-slide)
A galandage (pocket)
Mechanism
Leaf rolls on fixed carriages
Handle lifts leaf onto carriages, drops it onto gaskets when closed
Leaf disappears into a wall cassette
Air permeability EN 12207
Class 2 – 3
Class 3 – 4
Class 2 – 3
Water tightness EN 12208
3A – 5A
6A – 8A
3A – 5A at the pocket mouth
Leaf mass range
80 – 160 kg
200 – 400 kg
80 – 150 kg
Operating force EN 12046-1
60 – 110 N
40 – 80 N on the handle
60 – 100 N
Threshold height
25 – 45 mm
20 – 25 mm (PMR 20 mm possible)
0 – 5 mm flush
Price index
100
155 – 185
190 – 240
The commercial decision is entirely in rows two, three and six. If the project sits on an exposed elevation, or the specification calls for class 6A or better, inline cannot get there and the lift-and-slide premium is not optional. If the project has a PMR (personnes a mobilite reduite) requirement, the flush threshold matters more than the class, and galandage is the only mechanism that genuinely reaches 0 – 5 mm – at the cost of a wall cassette that is permanently inaccessible.
Galandage: what the pocket costs you
A galandage cassette is built into the wall, which means it is decided before the wall is closed and it is never serviced afterwards. Three consequences:
No thermal break at the pocket. The cassette is a box inside the insulation layer. Unless the pocket is insulated on the outer face, the closed leaf is sitting in a cold box and the Uw calculation for the opening is meaningless as a whole-unit figure.
Roller access is from above only. The top-hung variant allows leaf removal; the bottom-rolling variant usually does not. Specify top-hung for anything over 120 kg.
Sealing at the pocket mouth is a single line. There is no second chamber, so water tightness caps out around 5A regardless of how good the leaf is.
Cost is per leaf, not per m2. 85 – 140 USD/leaf on top of the frame – the single largest option adder on this page.
Do not specify galandage on a renovation. The pocket needs a full-depth wall build-up; in a 180 mm masonry renovation it leaves about 60 mm of insulation at the reveal, which is a condensation problem waiting for the first winter. The fRsi check at the pocket reveal fails before the window itself is even considered.
Thermal and Acoustic Performance of a Sliding System
Because a baie is one big panel rather than a grid of small ones, the glass share is high. On the 2 400 x 2 150 reference opening used here, glass is 4.019 m2 of 5.16 m2 – 77.9 %. That single fact decides the whole thermal strategy: on a casement you can win with the frame; on a slider you cannot.
Uw matrix: polyamide strip width x glazing x spacer
Uw from EN ISO 10077-1 for the reference opening, with glass perimeter lg = 11.96 m and one vertical interlock of 2.15 m at Psi = 0.18 W/mK. Frame Uf from the fitted curve Uf = 4.949 exp(-w/18.0) + 0.951, which tracks published system data from 0 to 34 mm.
Glazing
Polyamide strip
Aluminium
Stainless
TPS warm edge
4-16Ar-4 float
0 mm
3.56
3.52
3.48
4-16Ar-4 float
14 mm
2.97
2.93
2.89
4-16Ar-4 float
20 mm
2.83
2.79
2.74
4-16Ar-4 float
24 mm
2.76
2.71
2.67
4-16Ar-4 float
30 mm
2.67
2.63
2.59
4-16Ar-4 float
34 mm
2.63
2.59
2.55
4-16Ar-4 Low-E
0 mm
2.38
2.34
2.30
4-16Ar-4 Low-E
14 mm
1.79
1.75
1.70
4-16Ar-4 Low-E
20 mm
1.64
1.60
1.56
4-16Ar-4 Low-E
24 mm
1.57
1.53
1.49
4-16Ar-4 Low-E
30 mm
1.49
1.45
1.41
4-16Ar-4 Low-E
34 mm
1.45
1.41
1.37
4-16Ar-4-16Ar-4 Low-E
0 mm
2.10
2.06
2.01
4-16Ar-4-16Ar-4 Low-E
14 mm
1.51
1.46
1.42
4-16Ar-4-16Ar-4 Low-E
20 mm
1.36
1.32
1.28
4-16Ar-4-16Ar-4 Low-E
24 mm
1.29
1.25
1.21
4-16Ar-4-16Ar-4 Low-E
30 mm
1.21
1.17
1.13
4-16Ar-4-16Ar-4 Low-E
34 mm
1.17
1.13
1.09
Two things fall out of the matrix. First, across the whole strip range 0 to 34 mm, Uw moves by 0.93 to 1.09 depending on glazing. Second, across the glazing range at a fixed 34 mm strip it moves by 1.46 (2.55 float to 1.09 triple). Glazing is worth roughly 1.5 times the frame on a sliding unit. And the cost runs the same way: Low-E coating is 12 – 18 USD/m2, while taking the frame from a 14 mm to a 34 mm strip is 24 – 58 USD/m2 and it makes the profiles deeper, the leaf heavier, and the rollers bigger.
Warm edge, and the air permeability ceiling
Strip
Glazing
Uw alu spacer
Uw warm edge
Delta Uw
14 mm
4-16Ar-4 float
2.97
2.89
0.083
14 mm
4-16Ar-4 Low-E
1.79
1.70
0.083
14 mm
4-16Ar-4-16Ar-4 Low-E
1.51
1.42
0.083
24 mm
4-16Ar-4 float
2.76
2.67
0.083
24 mm
4-16Ar-4 Low-E
1.57
1.49
0.083
24 mm
4-16Ar-4-16Ar-4 Low-E
1.29
1.21
0.083
34 mm
4-16Ar-4 float
2.63
2.55
0.083
34 mm
4-16Ar-4 Low-E
1.45
1.37
0.083
34 mm
4-16Ar-4-16Ar-4 Low-E
1.17
1.09
0.083
Warm edge buys 0.10 to 0.13 W/m2K for 6 – 9 USD/m2, which is roughly 60 – 90 USD per unit of U. For the same money Low-E coating buys about ten times that improvement. Warm edge is therefore not a U-value purchase – it is a marginal-edge condensation purchase. On a slider it is worth having anyway, because the glass edge on a 2 m tall leaf is exactly where a French winter produces a visible condensation band at 40 % RH.
On air permeability there is no way around the mechanism. A sliding leaf cannot compress a gasket; it can only wipe against a brush or a sliding fin. EN 12207 class 4 needs a leakage figure that a perimeter brush simply does not deliver. Class 2 – 3 is the honest expectation for inline and class 3 – 4 for lift-and-slide. Any supplier claiming class 4 on an inline slider should be asked for the test report page, and then for the size of the tested specimen.
Acoustics follow the same logic as the seal: the leaf is fine, the gap is not. A 1 mm continuous gap at the interlock is 0.30 % of the opening area and it drops a Rw 40 dB assembly to about 25 dB. On a slider the interlock is a 2.15 m long seam, so the specification has to name the interlock seal system – double brush with a central fin, or a compressible bulb on a lift-and-slide – not just the glazing build-up. Our soundproof window notes cover the gap arithmetic in more detail.
Double Vitrage et Moustiquaire sur un Coulissant
The most searched French configuration is the fenetre en alluminium double vitrage avec moustiquaire – a sliding aluminium window with an insect screen. It is also the one that is most often quoted wrong, because the screen and the glazing each change a different subsystem and neither appears on the glazing line of the quote.
Glazing weight is a roller specification, not a comfort option
The table below is the same leaf at three sizes with five glazing build-ups. Nothing but the glass changes, and the per-wheel load moves by more than a factor of two across the range.
Leaf
Glazing
Glass m2
Leaf kg
Load/wheel N
Min. roller grade
standard 1200 x 2150
4-16Ar-4 float
2.01
63.4
233
R2
standard 1200 x 2150
5-16Ar-5 Low-E
2.01
73.4
270
R2
standard 1200 x 2150
6-16Ar-6 float
2.01
83.5
307
R3
standard 1200 x 2150
4-16Ar-4-16Ar-4 Low-E
2.01
83.5
307
R3
standard 1200 x 2150
6-16Ar-44.2 acoustic
2.01
97.5
359
R3
large baie 1500 x 2400
4-16Ar-4 float
2.93
85.2
314
R3
large baie 1500 x 2400
5-16Ar-5 Low-E
2.93
99.8
367
R3
large baie 1500 x 2400
6-16Ar-6 float
2.93
114.5
421
R4
large baie 1500 x 2400
4-16Ar-4-16Ar-4 Low-E
2.93
114.5
421
R4
large baie 1500 x 2400
6-16Ar-44.2 acoustic
2.93
135.0
496
R4
grand panneau 1800 x 2500
4-16Ar-4 float
3.76
104.2
383
R3
grand panneau 1800 x 2500
4-16Ar-4-16Ar-4 Low-E
3.76
141.8
522
R4
grand panneau 1800 x 2500
6-16Ar-44.2 acoustic
3.76
168.1
618
R5
At 1 800 x 2 500 the acoustic build-up produces 135 kg and 496 N per wheel. That requires R5, a 34 mm PU-coated twin wheel. The quote for that leaf usually still shows the standard R2 carriage, because the roller line is a default in the ERP system and the glass line is what the salesperson edited. Ask explicitly: “what is the carriage rating on the acoustic leaves?” and get it in writing.
Two glazing details matter specifically on sliders. First, argon retention: EN 1279-3 limits leakage to 1 % per year, so a unit is at about 78 % fill after 25 years and Ug has moved from 1.08 to roughly 1.13. The U-value is fine; the failure mode is desiccant saturation and fogging, which arrives long before the thermal figure degrades. Second, altitude: a unit sealed at 5 m in Foshan and installed at 1 200 m or above sees a pressure differential of about 14 kPa and will pillow outward. Over 1 200 m of elevation change specify a capillary breather tube at 2 – 4 USD/m2.
Moustiquaire on a slider: four forms, one trap
Type
Where it sits
Cost USD/m2
Service life
Failure mode
Fixed cassette frame
Inner face, screwed to the lining
38 – 62
10 – 12 yr
Blocks the leaf handle; must be removed to clean
Pleated retractable
Recessed cassette in the reveal
58 – 88
7 – 10 yr
Pleat fabric tears at the hem after about 8 000 cycles
Roller screen (store)
Outer face, in a headbox
62 – 95
10 – 15 yr
Bottom brush lets insects in; slat jams in the side guide
Sliding screen panel
Third track on the inner run
45 – 78
12 – 15 yr
Shares the drainage path with the leaf and silts up
The trap is the fourth row, and it is an extrusion-stage decision. If the screen panel runs on a track outboard of the glass leaf, it intercepts every drop of water the leaf drains and every grain of sand the leaf carries, and its drainage holes block within a season. On a fenetre coulissante the screen track must be the innermost run with its own drainage path to the outside, and the frame has to be extruded for it. It cannot be added on site.
Mesh geometry matters more than mesh count. Open area is (aperture / pitch) squared. An 18 x 18 mesh at 0.23 mm wire gives 70.1 % open area; the same 18 count at 0.28 mm wire drops to 64.3 %, which is a 6 % loss of daylight and ventilation for no gain in insect exclusion. A 20 x 20 at 0.18 mm gives 73.7 % and is the best optical trade available, but the wire is fragile. In a C4 or C5 coastal atmosphere, aluminium mesh is anodic against the frame – use 316 stainless.
Porte Coulissante en Aluminium: Seuil, PMR et Condamnation
A porte coulissante en aluminium is the same mechanism as a fenetre coulissante with three extra constraints: a person walks through it, it is usually the accessible entrance, and it is the door an intruder tries first.
Threshold height, and what PMR actually requires
Threshold height
Typical water class
PMR status
Comment
0 mm flush
1A – 2A
Compliant
Only viable with a pocket or a recessed channel; needs a drained grating in front
5 mm
2A – 3B
Compliant
French PMR threshold; needs a linear drain immediately outside
20 mm
5B – 7A
Compliant
Standard lift-and-slide PMR threshold
25 – 45 mm
7A – 8A
Not compliant
Only with a capped ramp; typical inline slider
French accessibility rules work on a ressaut of 20 mm maximum, or 40 mm if it is chamfered at 1:2 or less. A standard inline slider needs a 25 – 45 mm threshold to reach class 7A – 8A, which puts it in direct conflict with PMR. The resolution used on most French projects is a lift-and-slide at 20 mm with a linear drain set into the terrace immediately outside – the drain is doing the water work the threshold would otherwise do. Budget 30 – 55 USD per linear metre of drain and specify it with the door, not with the landscaping.
Locking and security on a sliding leaf
Multi-point hook lock. A single espagnolette is the minimum; three to five locking points on a 2 150 mm leaf keeps the interlock engaged under wind reversals as well as under attack.
Anti-lift device. A sliding leaf can be lifted out of its track from outside. A simple anti-lift block at the head costs a few dollars and removes the most common forced-entry method on French sliding doors.
Cylinder to EN 1303. Grade 4 minimum for a ground-floor residential door; grade 5 or 6 with a key-retaining function for a commercial opening.
EN 1627 RC classification. RC2 is the practical residential target. Note the N suffix: RC2N means the glazing was not attack-tested, which on a 78 % glass sliding door makes the N variant almost meaningless. Ask for RC2, not RC2N.
Interlock engagement depth. Minimum 12 mm of hook overlap. Below that, negative wind pressure can pull the two leaves apart at the meeting stile.
The same locking standards and their French equivalents were covered for hinged doors in puertas de exterior; the hardware is identical, only the load path differs. For a full-height glazed sliding door alternative see sliding patio doors from China.
Normes et Certification France: What to Ask For
French specification language is precise and the documents are not interchangeable. A French CCTP for fentres coulissantes en aluminium will reference four things, and they do different jobs.
AEV classification, and the A/B series trap
Standard
What it measures
Realistic band, inline
Realistic band, lift-and-slide
NF EN 12207
Air permeability, class 0 – 4
2 – 3
3 – 4
NF EN 12208
Water tightness, A series 1A – 9A
3A – 5A
6A – 8A
NF EN 12208
Water tightness, B series 1B – 7B
3B – 5B
5B – 7B
NF EN 12210
Wind resistance, C1 – C5
C1 – C3
C2 – C4
EN 12046-1
Operating force
60 – 110 N
40 – 80 N
EN 13115 / EN 12400
Mechanical / cycling durability
Class 3 (10 000 cycles)
Class 3 – 4 (10 000 – 25 000 cycles)
The A/B distinction is the single most abused line in a sliding window quotation. The A series is tested on a protected specimen; the B series on an exposed one. 7B caps at 300 Pa while 7A reaches 600 Pa – the same number in front of the letter and half the performance. A supplier quoting “class 7A” for a west-facing elevation in Brittany is quoting a laboratory result for a condition the building does not have. Always ask which series, and match it to the exposure.
CE marking, NF CSTB, CEKAL, Acotherm
CE / DoP under EN 14351-1. Mandatory. AVCP System 3 for a standard window. The DoP lists the tested values – check the tested specimen size, because a sliding door DoP based on a 1 200 x 1 500 specimen does not cover a 2 400 x 2 400 baie.
NF CSTB (NF Fenetres, NF Menuiseries). Voluntary, widely required on French public and social housing work. It audits the factory, not just the product. Budget 1 400 – 3 600 USD per project for the dossier.
CEKAL. Certification of the glazing unit itself, not the frame – argon retention, dew point, and the acoustic or security classification of the IGU. It is the document to ask for when the complaint is fogged units.
Acotherm AC1 – AC4. The French thermal-acoustic label: it gives a single Uw-based thermal class and an acoustic class, which is what a MaPrimeRenov or a CEE dossier expects to see. Registration runs 900 – 2 400 USD per project.
DTU 36.5 and NF DTU 36.5 P1-2. The installation rules, including the three pose types – applique, tunnel and feuillure – and the joint treatment. This is the document the installer works to, not the supplier.
One trap worth naming explicitly: the CCTP must state which dimension is being measured. French practice recognises the trou nu de maconnerie (structural opening), the precadre (pre-frame built into the masonry), the dimensions finies (finished frame) and the cote d encombrement (overall envelope). Measuring the structural opening and cutting to finished frame size produces a 40 – 60 mm error that cannot be corrected on site. Our fentre aluminium specification notes and fenetre coulissante sizing page both carry the dimension tables in full.
Manufacturing Sequence and Inspection Points
Ten operations, and one of them is not ours. The sequence below is a Foshan factory running 6063-T6 profiles with a polyamide strip; the buyer-controlled step is called out because it is the only one with real schedule leverage.
Process steps and where the time goes
Operation
Days
Share
Content
Decoupe et usinage des profils
4 d
12.5 %
CNC longueur, percages drainage, fraisage seuil
Sertissage barrette polyamide
3 d
9.4 %
rainurage, sertissage, echantillon cisaillement
Assemblage dormants et ouvrants
3 d
9.4 %
sertissage mecanique, equerres, collage
Pose joints, brosses et seuil
2 d
6.2 %
EPDM, brosse polypropylene, seuil PMR 20 mm
Traitement de surface
2 d
6.2 %
degraissage, conversion zirconium-titane
Pulverisation poudre / anodisation
3 d
9.4 %
60-80 um, etuvage 190-200 C
Vitrage et scellement IGU
2 d
6.2 %
intercalaire, argon, scellement secondaire
Montage galets et reglage
2 d
6.2 %
chariots, rail inox, reglage hauteur et aplomb
Controle dimensionnel et essais
2 d
6.2 %
jeux, EN 12046-1 effort de manoeuvre
Emballage et mise en caisse
2 d
6.2 %
cornieres, film, caisse contreplaquee
Total shop time is 25 days. Add 7 days for drawing approval and the order cycle is 32 days. Drawing sign-off is 21.9 % of the elapsed time and it is the only step a buyer controls. Everything else is either machine time or a queue. If the schedule slips, it almost always slips there.
Inspection points that catch real defects
Shear test on the crimped strip, per die batch. The polyamide knurl groove is held to about +/- 0.05 mm. A groove worn 0.1 mm over stops gripping, and the failure is delayed: the leaf passes every pre-shipment check and drops or binds after one heating season. Ask for the report per die batch, not per profile series.
Dry-build one unit per specification, photograph it. This single step catches more errors than all the others combined. The most common is a glazing unit ordered at 32 mm into a 28 mm rebate – invisible until assembly.
Rail flatness, 1 mm per metre. Measured on the assembled frame, not on the extrusion. A frame racked in the crate will not run true no matter how the carriages are adjusted.
Operating force to EN 12046-1. Recorded per leaf. On a lift-and-slide, above 80 N on the handle means the carriage height is set wrong or the rail is out of level.
Drain path test. Water poured into the outer chamber must exit at the slots within a few seconds and must not appear in the inner chamber. This is a ten-second test and it is the one that predicts the year-two call-back.
Coating thickness and adhesion. 60 – 80 um for Qualicoat Class 1, cross-cut adhesion to ISO 2409 class 0. Pre-treatment is what actually controls corrosion, not the powder thickness – a zirconium-titanium conversion coating outperforms iron phosphate by a wide margin in salt spray.
EN 14179 heat soak. 4 – 7 USD/m2. Nickel sulphide inclusions break about 0.1 – 0.2 % of toughened panes. On a 200 m2 project that is roughly one unexplained breakage per year if it is skipped.
Glass edge clearance and setting blocks. Without blocks the unit slides down in the rebate and the bottom edge chips a season later.
FOB Pricing, Options and Commercial Terms
FOB Foshan or Shenzhen, per m2 of finished opening, for fentres coulissantes en aluminium. Prices are for a two-leaf baie at 2 400 x 2 150 with standard R2 – R3 carriages, Qualicoat Class 1 powder in a stock RAL, and standard export crating.
FOB matrix by configuration and volume
Configuration
60 m2
200 m2
600 m2
1500 m2
C1 inline, 20 mm strip, float DGU
96 USD/m2
118 USD/m2
102 USD/m2
88 USD/m2
C2 inline, 24 mm strip, Low-E DGU
118 USD/m2
142 USD/m2
124 USD/m2
108 USD/m2
C3 lift-and-slide, 24 mm, Low-E
158 USD/m2
190 USD/m2
168 USD/m2
148 USD/m2
C4 lift-and-slide, 34 mm, Low-E + warm edge
186 USD/m2
222 USD/m2
198 USD/m2
176 USD/m2
C5 lift-and-slide, 34 mm, triple Low-E
232 USD/m2
276 USD/m2
246 USD/m2
218 USD/m2
The C1 to C2 step is 22 USD/m2 and buys a 24 mm strip and Low-E. The C2 to C3 step is 40 USD/m2 and buys the lift-and-slide mechanism – sealed perimeter gaskets, 200 – 400 kg leaf capacity, and two to three water-tightness classes. That is the steepest but also the most defensible jump on the sheet, because it is the only one that changes the failure mode rather than the magnitude.
Option adders
Option
Adder USD/m2 unless stated
Warm edge TPS spacer
6 – 9
Laminated inner pane 44.2
11 – 16
Acoustic asymmetric 6-16Ar-44.2
18 – 26
Thermally improved interlock (Psi 0.18 -> 0.09)
9 – 14
Stainless rail insert on bottom track
7 – 11
Twin-wheel tandem carriage
14 – 22
Concealed inox roller carriage
12 – 18
Motorised lift-and-slide drive
260 – 420 /leaf
Galandage pocket cassette
85 – 140 /leaf
Pleated retractable moustiquaire
38 – 62 /m2
Sliding screen panel on inner track
45 – 78 /m2
RAL 7016 / custom powder (Qualicoat Class 1)
4 – 8
Qualicoat Class 2 Seaside / Qualanod AA25
9 – 15
NF CSTB + CEKAL dossier (per project)
1,400 – 3,600 /project
Acotherm AC1-AC4 registration
900 – 2,400 /project
Heat-soak test EN 14179
4 – 7
EN 12207 / 12208 test report reuse
0 – 900
Export crate engineering (plywood + strap)
6 – 10
Certification dossiers do not scale with volume. NF CSTB and Acotherm registration cost the same whether the order is 60 m2 or 1 500 m2, so on a small order they add 8 – 18 USD/m2 to the real cost. A European quote usually includes them in the unit price; a Chinese FOB quote does not. That is the single largest source of false comparison when buyers put the two side by side. Always state in the RFQ whether certification is included.
Standard commercial terms:
Item
Term
MOQ
60 m2 per opening configuration; below that a setup charge of 180 – 320 USD applies
Lead time
32 – 39 days from approved drawings, plus 22 – 30 days sea transit to Le Havre
Payment
30 % deposit, 70 % against bill of lading; LC at sight accepted above 20 000 USD
10 years on profiles and coating, 5 years on hardware and rollers, 10 years on IGU seal
Spare parts
2 % of carriage and roller count shipped free; seals and brushes 3 %
Samples
300 x 300 corner sample with the specified strip and powder, 45 – 90 USD, credited against the order
Container Loading and Landed Cost to France
Sliding units are bulky and light. That combination determines the whole logistics strategy and it is the opposite of what applies to glass doors or stone.
40HQ loading arithmetic
Parameter
Value
Opening area per unit
5.16 m2
Crated volume per unit
0.95 m3
Crated mass per unit
152 kg
Units by volume (68 m3 usable)
71 units
Units by mass (22 000 kg payload)
144 units
Governing constraint
volume
Area per container
366 m2
Volume utilisation
99.2 %
Payload utilisation
49.1 %
The container fills on volume at 99.2 % and reaches only 49.1 % of the payload. Two consequences. First, knock-down does nothing: glass cannot be nested, so a KD slider is the same volume as an assembled one. The real lever is crate engineering – better stacking takes a container from 220 to 260 m2 of product and cuts freight per m2 by about 15 %. Second, because there is unused payload, sliding units are the ideal partner cargo for a heavier product from the same factory; a consolidated container typically runs 8 – 12 % cheaper per line item than two separate shipments.
LCL only makes sense below about 8 – 10 m3. Above that, crate handling and the damage rate on a 2.4 m tall panel eat the saving. Five units by LCL typically cost 3.0 to 3.5 times the per-unit freight of a consolidated 40HQ, and corner damage on tall panels is the most common insurance claim in this product class.
Landed cost, Le Havre
Element
USD/m2
FOB Foshan
142.0
Sea freight + terminal
13.8
Marine insurance (0.6 %%)
0.9
CIF insured
156.7
Customs duty 6 %%
9.4
EU anti-dumping on aluminium extrusions (22.2 %%)
34.8
Landed, before VAT
200.9
Installation and sealing
44.0
Delivered and installed
244.9
Local French supply, benchmark
340.0
Delivered and installed at 244.9 USD/m2 against a local benchmark of 340.0 is a saving of 28.0 %.
Duty and anti-dumping sensitivity
Scenario
Cost impact
Customs duty 0 %
0.0 USD/m2
Customs duty 6 %
9.4 USD/m2
Customs duty 15 %
23.5 USD/m2
Anti-dumping 0.0 %
0.0 USD/m2
Anti-dumping 8.0 %
12.5 USD/m2
Anti-dumping 22.2 %
34.8 USD/m2
Anti-dumping 32.1 %
50.3 USD/m2
The anti-dumping swing, 0 to 32.1 %, moves the landed figure by about 50 USD/m2 – more than the entire difference between C1 and C5, and more than sea freight by a factor of four. Classification under the correct HS heading and confirmation of the exporter rate is therefore a bigger cost lever than any product decision on this page. It has to be settled before the product is optimised, not after.
Installation Sequence and Failure Modes
Sliding units fail in year two, and they fail for reasons decided in year zero. Four of the six failure modes below are specification decisions, not workmanship.
Eight-step installation
Check the structural opening. Confirm which French dimension base the frame was cut to. Diagonal tolerance 3 mm over 2 400 mm; a racked opening cannot be corrected with packing shims beyond about 5 mm.
Set the pre-frame or the sub-sill with a fall to the outside. Minimum 1 %. A level sub-sill guarantees standing water in the outer chamber.
Apply the air and vapour seal. For a French installation, a vapour-open external tape with a sill membrane turned up at the ends. Silicone alone on the external perimeter is the most common cause of year-one leaks.
Anchor the frame. Anchor through the frame into the structure, never through the polyamide strip – a screw crossing the strip is a thermal bridge and a corrosion path. Anchor spacing 400 – 600 mm, within 150 mm of each corner.
Verify rail level at 1 mm per metre before the leaves go in. Use a spirit level on the rail itself, not on the frame head.
Hang the leaves, then set carriage height. Adjust so the leaf is plumb and the interlock overlap is at least 12 mm top to bottom.
Test the drain path. Pour water into the outer chamber; confirm discharge at the slots and no water in the inner chamber. Repeat on every unit – one blocked slot in ten is normal straight out of the crate.
Commission the mechanism. Record the operating force to EN 12046-1, cycle the leaf ten times, retorque the handle and the lock keeps.
Six failure modes
Failure
Root cause
Decided at
Fix cost
Leaf drags, rollers wear in 18 months
Rail out of level or glass upgraded without upgrading the carriage
Specification / install
35 – 70 USD/leaf
Water appears on the inner track
Outer and inner chambers share a drain path, or slots under 5 mm hold water by surface tension
Specification
Not fixable on site
Rail grooved permanently
Steel wheels on a bare aluminium rail, contact stress above 170 MPa
Specification
Frame replacement
Corrosion at the anchors
Screw through the polyamide strip, or bare steel / brass in contact with aluminium
Install
120 – 260 USD/unit
Leaf hard to open in year three
Track silted because the screen panel drains into it, or brush seals packed with mortar
Specification
40 – 90 USD/unit
Condensation band at the glass edge
Aluminium spacer without a warm edge, on a 2 m tall leaf
Specification
Not fixable – glazing replacement
Four of the six cannot be fixed by the installer. A shared drain path, an undersized slot, an under-rated carriage and a bare rail under steel wheels are all decisions made when the extrusion and the bill of materials are set. The RFQ is the only place they get corrected.
Project Data: Two French Deliveries
Lyon, 68 units – residential renovation, zone 2
A 1970s block, 68 two-leaf baies at 2 400 x 2 150, replacing single-glazed aluminium sliders. Wind zone 2 at 0.39 kPa, leaf height 2 150 mm, so the interlock requirement falls between the I1 and I2 columns at 0.5 kPa: I2 at 35 x 55 x 1.8 was specified with margin. Glazing 4-16Ar-4 Low-E on a 24 mm strip with an aluminium spacer, Uw 1.57 as delivered.
Item
Value
Units / area
68 units, 351 m2
Configuration
Inline slider, 24 mm strip, R3 POM carriages, 5 x 20 drain slots
Class achieved
EN 12207 class 3, EN 12208 4A (protected, A series), EN 12210 C2
Uw as built
1.57 W/m2K
FOB
118 USD/m2
Landed Le Havre
176 USD/m2
Delivered and installed
221 USD/m2
Local French benchmark
338 USD/m2
Saving
-34.6 %, 41 067 USD
12-month service calls
3 (two carriage re-levelling, one handle retorque)
Condensation complaints
0, against 11 on the previous single-glazed units
The one decision worth flagging: the project used inline rather than lift-and-slide to save about 40 USD/m2, and accepted 4A instead of 7A. That was correct here – the elevation is sheltered and the block is inland. On the same budget, a coastal site would have needed the lift-and-slide regardless.
La Rochelle, 24 units – coastal, zone 4
A seafront development 300 m from the water, wind zone 4 at 0.56 kPa with a height factor pushing the design case to roughly 1.0 kPa. Leaf height 2 400 mm, which puts the interlock at I4 (45 x 90 x 2.2). Lift-and-slide specified for the water class, with a 20 mm PMR threshold and a linear drain set into the terrace.
Item
Value
Units / area
24 units, 124 m2
Configuration
Lift-and-slide, 34 mm strip, 4-16Ar-4-16Ar-4 Low-E, warm edge
Hardware
R5 PU twin wheels, stainless rail insert, A4 (316) fasteners
Coating
Qualicoat Class 2 Seaside, AA25 anodised option on the rails
Class achieved
EN 12207 class 4, EN 12208 7A / 6B exposed, EN 12210 C3
Uw as built
1.17 W/m2K
FOB
222 USD/m2
Landed Le Havre
312 USD/m2
Delivered and installed
356 USD/m2
Local French benchmark
512 USD/m2
Saving
-30.5 %, 19 344 USD
18-month service calls
1 (anti-lift block replaced after a forced-entry attempt)
Coating condition at 18 months
No chalking, no pitting, gloss retention within range
Two things were added late and both paid for themselves. The stainless rail insert was 9 USD/m2 and removes the only failure mode that would have destroyed frames. The A4 fasteners were a few hundred dollars and are the difference between a five-year and a twenty-year coastal installation; aluminium at -0.85 V is anodic to every bare steel fastener in the assembly.
Comparatif: Sliding Against the Alternatives
Every comparison table on this site ends up answering the same question, which is not “which is better”. It is “which constraint decides”. The table below is the honest version for a fentre coulissante.
Ten-point comparison
Parameter
Coulissant inline
Coulissant a levage
Coulissant a galandage
Fenetre a la francaise (casement)
Coulissant a soufflet / pliant
Air permeability
2 – 3
3 – 4
2 – 3
3 – 4
2 – 3
Water tightness
3A – 5A
6A – 8A
3A – 5A
7A – 9A
3A – 5A
Uw achievable
1.4 – 2.6
1.1 – 1.9
1.4 – 2.2
1.0 – 1.8
1.6 – 2.8
Max leaf size
1 800 x 2 400
2 500 x 2 700
1 500 x 2 400
900 x 1 800
1 000 x 2 400
Clear opening
50 %
50 %
100 %
95 %
90 %
Threshold height
25 – 45 mm
20 – 25 mm
0 – 5 mm
20 – 30 mm
25 – 40 mm
Floor space used
None
None
None
Swing arc
Stack zone
Insect screen
Needs 3rd track
Needs 3rd track
Awkward at the mouth
Simple fixed frame
Awkward
Maintenance access
Good
Good
Very poor
Good
Moderate
Price index
100
155 – 185
190 – 240
115 – 140
145 – 200
What the comparison actually decides
Read the table by constraint, not by row. Four questions settle it, and they come in this order:
Is the elevation exposed? If the CCTP calls for class 6A or better, inline is out and the lift-and-slide premium is mandatory, not optional.
Is it the accessible entrance? If PMR applies, a 20 mm or 5 mm threshold is required, which points to lift-and-slide or galandage. A 45 mm inline threshold with a bolted ramp is a non-compliant answer that gets rejected at reception.
Does the leaf exceed about 1 800 x 2 400? Above that, inline carriage ratings run out and lift-and-slide is the only mechanism with the capacity.
Is the wall available? If you cannot build a pocket, galandage is not on the table no matter how attractive the 100 % clear opening looks.
Where none of those bind, an inline slider is the correct choice and the cheapest. Where one binds, the comparison collapses to a single row and the decision takes thirty seconds. If acoustics and thermal performance are the priority and the opening is small, a casement is still better on every performance line and our casement window data is the right place to compare. For a wide opening where stacking is acceptable, folding door systems give a larger clear opening than any slider.
When aluminium is not the right answer: a listed building where the sightline must match original timber, a budget under about 200 USD/m2 delivered, or a site where the frames will be cut or modified on site. Aluminium is a factory product; it does not tolerate field modification, and a cut thermal break cannot be repaired.
RFQ Checklist
An enquiry that contains the eight technical and eight commercial items below gets a priced answer in one pass. An enquiry that omits them generates two weeks of questions, and the missing item is almost always the one that changes the price.
Technical – what to specify
Opening dimensions and the dimension base. State trou nu de maconnerie, precadre, or dimensions finies. A 40 – 60 mm ambiguity here is the most expensive omission in the list.
Number of leaves, and which one slides. Two-leaf, three-leaf, and the direction of slide relative to the interior.
Wind load, not wind zone. Give the pressure in Pa or kPa with the height factor applied. “Zone 3” leaves the supplier guessing at the building height.
Required AEV class, and the series. “Class 7A” and “class 6B” are different products. State which one the CCTP demands.
Glazing build-up and required Ug. Include laminate, acoustic, and whether heat soak is required.
Polyamide strip width and target Uw. State the Uw, not just the strip; the supplier may reach it a cheaper way.
Threshold height and PMR requirement. Determines the mechanism.
Screen, coating class and colour. Moustiquaire type, Qualicoat class, RAL reference, and the ISO 9223 corrosivity category of the site.
Commercial – what to confirm in writing
Quantity in m2 and in units, per configuration. Volume pricing is per configuration, not per order.
Whether certification is included. NF CSTB, CEKAL, Acotherm. Say explicitly “included” or “excluded” and the comparison becomes honest.
Roller rating in newtons per wheel for each leaf size and glazing option in the order. This is the line that decides the year-two call-back.
Rail specification. Bare aluminium or stainless insert.
HS classification and the exporter anti-dumping rate. Written, before shipment. It is worth more than every product option on the sheet combined.
Incoterm, port and lead time. FOB Foshan vs FOB Shenzhen is a real difference in inland cost.
Payment terms and whether LC is required.
Spare parts percentage and warranty period per component. Profiles, coating, hardware and IGU have different periods; a blanket “10 years” is not a warranty.
Send the RFQ as a table, one row per opening configuration, with the eight technical columns across the top. That format is priced in a day; a narrative specification takes a week and generates clarifying questions on about a third of the lines.